• Title/Summary/Keyword: Delivery loads

Search Result 77, Processing Time 0.019 seconds

Calculation of Pollutant Load for Prediction of Pollutant Loads to Watershed (합리적인 유역단위 오염부하량 산정방법 연구)

  • Jang, Jae-Ho;Yoon, Chun-Gyung;Jung, Kwang-Wook;Kim, Hyung-Chul
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.534-539
    • /
    • 2005
  • The purpose of this study is the introduction of pollutant loads's estimation into Saemangeum watershed area with M.E.'s guidebook for TMDL and GIS tool. To estimate reliable pollutants loads, it is necessary to think about characteristic of removal, discharge and runoff as time series. In this study, it was calculated for generation loads which be came from pollutant source, discharge loads which be reduced in the treatment facilities and delivery loads which be considered the self purification parameter and delivery distance. To assess the delivery distance handily, it was particularly estimated using Arc-GIS. It was met with good results that delivery loads of BOD, T-N and T-P was reflected to seasonal precipitation. Lastly to verify the estimated pollutant loads, HSPF developed by USEPA was applied to it. It was showed a relativity of observed to simulated data for flow, Temperature, DO, BOD, $NO_3^--N$ TN and TP. Consequantly, this delivery loads can make full use of model input data for prediction of pollutant loads.

  • PDF

Investigation on the Pollutant Delivery Characteristics using Physically Based Watershed Model (물리적 기반의 유역모형을 이용한 오염물질 유달 특성 규명)

  • Kim, Chul-Gyum;Kim, Nam-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.256-267
    • /
    • 2009
  • A method of estimating pollutant delivery ratios considering watershed physical and meteorological characteristics and flow conditions using SWAT-K watershed model was described, and pollutant delivery characteristics during dry and rainy seasons, for monthly and seasonally, and with flow regimes were investigated for the Chungju dam watershed. Delivery ratios for sediment, T-N, and T-P showed higher values over 100% during dry and winter seasons with low pollutant loads and flows, and showed relatively uniform ones under 100% during rainy and summer seasons with concentrated loads and flows. It was found that mainly wet flows during summer seasons played very important roles in investigating the delivery characteristics of total or nonpoint pollutant loads, because more than 90% of total loads were influenced by nonpoint source, and discharged with the flows. From the results, we could find out the delivery characteristics with various watershed and flow conditions which are difficult to consider by actual measurement, and could get a foothold of estimating more reasonable and scientific allocated loads for water quality standard using the reliable method of estimating delivery ratios with a watershed model.

Evaluation of Application to Pre-Developed Delivery Load Equation at Upper Watershed of the Daechung Reservoir (대청호 상류유역의 기 개발된 유달부하량 산정식의 적용성 평가)

  • Lee, Jun-Bae;Kim, Kap-Soon;Lee, Kyu-Seung;Yoon, Young-Sam;Lim, Byung-Jin;Jung, Jae-Woon
    • Korean Journal of Environmental Agriculture
    • /
    • v.31 no.1
    • /
    • pp.16-23
    • /
    • 2012
  • BACKGROUND: To improve the Daechung reservoir water quality, a quantitative estimation of the delivery load from upper watershed need to be conducted prior to others. To do so, an intensive monitoring is necessary because of the complexity and uncertainty of the delivery load from uppper watershed. However, intensive monitoring need to invest much time, cost, and effort. So, many researcher have developed an equation to estimate the delivery loads. But, relatively little research has been conducted on the applicability of pre-developed equation using other sites. Therefore, the objective of this study was to evaluate application of the equation for BOD, T-N and T-P delivery load. METHODS AND RESULTS: To verify the applicability of the equation, the following equation was used; Delivery loads(kg/day)=generated pollutant loads${\times}(1-{\alpha}){\times}$(daily outflow/${\beta})^{\gamma}$. The equations could be calculated the daily delivery loads of streams without any data of water quality, only with the data of daily runoff of study sites. The equations were applied to Youngdogcheon, Chogangcheon, Bocheongcheon, Sookcheon to examine its applicability using monitoring data. The results showed that the estimated delivery loads were in a good agreement with the observed data and indicated reasonable applicability of the equations. CONCLUSION(s): Overall, the equations were satisfactory in estimation of delivery loads at upper watershed of the Daechung reservoir. Therefore, the equations could be contributed to better water quality management in the Daechung reservoir.

Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds (낙동강 오염총량관리 단위유역 유달율 경험공식)

  • Kim, Mun Sung;Shin, Hyun Suk;Park, Ju Hyun;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

Development of the Estimation Model on Daily Pollutant Loads for the Watersheds in the Nakdong River Basin I. Correction and Verification for the Model (낙동강 유역에 대한 일별 유달부하량 산정모델개발 I. 모델식의 보정 및 검증)

  • Yoon, Young-Sam;Kim, Moon-Soo;Yu, Jae-Jung;Lee, Hae-Jin;Lee, Jun-Bae;Yang, Sang-Yong
    • Journal of Environmental Science International
    • /
    • v.16 no.2
    • /
    • pp.203-210
    • /
    • 2007
  • The delivery load data obtained from Nakdong river basin are used for developing the model estimating the daily delivery load on the main side streams of Nakdong River. The developed model assesses the daily contamination loads of the main thirteen side streams that contribute to the main stream of Nakdong river. It is developed that the model using the simplified equation that can estimate the daily delivery loads on the side main streams of Nakdong river for a period of having no data of the water quality and flow. The developed model for estimating the daily delivery loads from the main side streams in Nakdong river basin on each item such as BOD, TN, and TP is expressed as Daily delivery load ($\frac{kg}{day}$) = Production load $(\frac{kg}{day}){\times}(1-{\alpha}){\times}(\frac{daily\;runoff}{average\;runoff\;per\;year}){\gamma}$. The estimated values obtained by using the model are almost fit to the calculated values (real data) that have been acquired from the thirteen main side streams in Nakdong river basin. The correlation coefficient values, R, that indicate the correlation between the estimated and the calculated show over 0.7 that mean the estimated values from the used model are adapted to the real data except TN values of Nam-river, Hwang-river, Gam-river, We-river. Especially, the correlation of TP values between the estimated and the calculated implies quite a creditable data to use.

Pollutant Delivery Ratio of Okdong-cheon Watershed Using HSPF Model (HSPF 모형을 이용한 옥동천 유역의 유달율 분석)

  • Lee, Hyunji;Kim, Kyeung;Song, Jung-Hun;Lee, Do Gil;Rhee, Han-pil;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.1
    • /
    • pp.9-20
    • /
    • 2019
  • The primary objective of this study was to analyze the delivery ratio using Hydrological Simulation Program - Fortran (HSPF) in Okdong-cheon watershed. Model parameters related to hydrology and water quality were calibrated and validated by comparing model predictions with the 8-day interval filed data collected for ten years from the Korea Ministry of Environment. The results indicated that hydrology and water quality parameters appeared to be reasonably comparable to the field data. The pollutant delivery loads of the watershed in 2015 were simulated using the HSPF model. The delivery ratios of each subwatershed were also estimated by the simple ratio calculation of pollutant discharge load and pollutant delivery load. Coefficients of the regression equation between the delivery ratio and specific discharge were also computed using the delivery ratio. Based on the results, multiple regression analysis was performed using the discharge and the physical characteristics of the subwatershed such as the area. The equation of delivery ratio derived in this study is only for the Okdong-cheon watershed, so the larger studies are needed to apply the findings to other watersheds.

Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed (회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정)

  • Jung, Jae-Woon;Yoon, Kwang-Sik;Joo, Seuk-Hun;Choi, Woo-Young;Lee, Yong-Woon;Rhew, Doug-Hee;Lee, Su-Woong;Chang, Nam-Ik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.

Computation and Assessment of Delivery Pollutant Loads for the Streams in the Nakdong River Basin (낙동강 소수계별 유달부하량 산정 및 평가)

  • Yoon, Young-Sam;Yu, Jae-Jeong;Kim, Moon-Su;Lee, Hae-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.277-287
    • /
    • 2006
  • Production loads of the contaminants near the Nakdong-river are, BOD : $1,006ton{\cdot}day^{-1}$, TN : $117ton{\cdot}day^{-1}$, and TP : $21ton{\cdot}day^{-1}$. Among the sources of contamination, the biggest contribution to the production load was shared by the human population, which maintains 40.7% of BOD, 44.2% of TN, and 52.5% of TP production. Similarly, among the sources of discharge load, the human population contributed 45.0% of BOD, 34.5% of TN, and 45.8% of TP. Results of flow investigation in 2001 and 2002 indicate that among the side streams, Nam-river showed the greatest average flow. In case of main stream flow, it was increased in the downstream due to the increase of the influents from the side streams. In case of BOD, COD, TOC and SS, high values were detected at Keumho-river where industrial wastewater was discharged as high level concentration. In case of the main stream, Koryoung point where direct influence of Keumho-river and Seongseo industrial complex is evident showed high BOD, COD and TOC. Oxidized nitrogen compounds and total nitrogen showed similar patterns of BOD, COD, and TOC. Especially, nitrate nitrogen was relatively high at all points. However, in case of Chlorophyll-a, relatively high values were observed at mid- and downstream areas such as Koryoung, Namjee, Soosan, Moolkeum and Hakooeun. This could be caused by the slow flow rate and the abundant nutrient salts attributed by the side streams. Relatively better water quality was observed in 2002 when the flow was relatively abundant than that in 2001. Results of investigation during 2001-2002 showed that delivery load increased as the flow reaches downstream. In 2001, delivery loads at the downstream Soosan-bridge were BOD $22,152ton{\cdot}day^{-1}$, COD $45,467ton{\cdot}day^{-1}$, TN $22,062ton{\cdot}day^{-1}$, TP $926ton{\cdot}day^{-1}$. Delivery loads in 2002 were increased due to the increase of the rainfall. They are BOD $25,876ton{\cdot}day^{-1}$, COD $64,200ton{\cdot}day^{-1}$, TN $41,101ton{\cdot}day^{-1}$, and TP $1,362ton{\cdot}day^{-1}$.

The Simulation of Nutrients using SWAT Model and its Application to Estimate Delivery Ratio (SWAT 모형을 이용한 영양물질 모의 및 유달율 추정에의 적용)

  • Choi, Daegyu;Shin, Hyun Suk;Yoon, Young Sam;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.3
    • /
    • pp.375-385
    • /
    • 2009
  • The estimation of delivery ratio is a essential part of Korean Total Maximum Daily Loads (TMDL) procedure which needs a number of observed stream flow and pollutants data. If observed data were not sufficient, researchers have to find other alternatives. One of them is to make indirect data by using watershed models, such as Soil and Water Assessment Tool (SWAT) and Hydrological Simulation Program - FORTRAN (HSPF) and so on. In this study, indirect daily data was made by using SWAT model. To build the Byongseong-SWAT model accurately, crop cultures are reflected by handling the MGT.file in SWAT model. Especially, mass of manure and schedule of crop culture are inputted through investigating domestic research papers as well as fieldwork. After calibrating SWAT model in comparison with the 22-years flow and pollutants observed outlet data, the delivery ratio of Byongseong watershed is calculated by using daily simulated data during 2004-2007. Empirical equations for delivery ratio through multi-regression analysis are developed by using meteorological and physical factors such as flow, watershed area, stream length, catchment slope, curve number (CN) and subbasin's pollutant discharge loads.

Estimation of Pollutant Load Delivery Ratio for Flow Duration Using L-Q Equation from the Oenam-cheon watershed in Juam Lake (유량-부하량관계식을 이용한 주암호 외남천 유역의 유황별 유달율 산정)

  • Choi, Dong-Ho;Jung, Jae-Woon;Lee, Kyoung-Sook;Choi, Yu-Jin;Yoon, Kwang-Sik;Cho, So-Hyun;Park, Ha-Na;Lim, Byung-Jin;Chang, Nam-Ik
    • Journal of Environmental Science International
    • /
    • v.21 no.1
    • /
    • pp.31-39
    • /
    • 2012
  • The objective of this study is to provide pollutant loads delivery ratio for flow duration in Oenam-cheon watershed, which is upstream watershed of Juam Lake. To calculate the delivery ratio by flow duration, rating curves and discharge-loads curves using measured data were established, then Flow Duration Curve(FDC) and pollutant loads delivery ratio curves were constructed. The results show that the delivery ratios for $BOD_5$ for abundant flow($Q_{95}$), ordinary flow($Q_{185}$), low flow($Q_{275}$), and drought flow($Q_{355}$) were 23.9, 12.7, 7.1, and 2.9%, respectively. The delivery ratios of same flow regime for T-N were 58.4, 31.2, 17.2 and 7.1%, respectively. While, the delivery ratios T-P were 17.3, 7.5, 3.4, and 1.1% respectively. In general, delivery ratio of high flow condition showed higher value due to the influence of nonpoint source pollution. Based on the study results, generalized equations were developed for delivery ratio and discharge per unit area, which could be used for ungaged watershed with similar pollution sources.