• Title/Summary/Keyword: Delivery estimation

Search Result 138, Processing Time 0.03 seconds

Development and Evaluation of Sediment Delivery Ratio Equation using Clustering Methods for Estimation of Sediment Discharge on Ungauged Basins in Korea (국내 미계측 유역의 유사유출량 예측을 위한 군집별 유사전달율 산정식 도출 및 평가)

  • Lee, Seoro;Park, Sang Deog;Shin, Seung Sook;Kim, Ki-sung;Kim, Jonggun;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.5
    • /
    • pp.537-547
    • /
    • 2018
  • Sediment discharge by rainfall runoff affects water quality in rivers such as turbid water, eutrophication. In order to solve various problems caused by soil loss, it is important to establish a sediment management plan for watersheds and rivers in advance. However, there is a lack of sediment data available for estimating sediment discharge in ungauged basins.. Thus, reasonable research is very important to evaluate and predict the sediment discharge quantitatively. In this study, cluster analysis was conducted to classify gauged watersheds into hydrologically homogeneous groups based on the watershed characteristics. Also, this study suggests a method to efficiently predict the sediment discharge for ungauged basins by developing and evaluating the SDR equations based on the PA-SDR module. As the result, the SDR equations for the classified watersheds were derived to predict the most reasonable sediment discharge of ungauged basins with 0.24 % ~ 10.89 % errors. It was found that the optimal parameters for the gauged basins reflect well characteristic of sediment movement. SDR equations proposed in this study will be available for estimating sediment discharge on ungauged basins. Also it is possible to utilize establishing the appropriate sediment management plan for integrated management of watershed and river in Korea.

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Estimation of Attributes Affecting University Students to Select the Pizza Restaurant by Gender (성별에 따른 대학생의 피자전문점 선택에 영향을 미치는 속성 평가)

  • Kang, Jong-Heon;Jeong, In-Suk
    • Journal of the Korean Society of Food Culture
    • /
    • v.21 no.1
    • /
    • pp.57-64
    • /
    • 2006
  • The purpose of this study was to measure the pizza purchasing behavioral characteristics of respondents and importances of factors affecting pizza purchase, to estimate the effects of attributes on pizza restaurant choice, and to predict probability of selecting a particular pizza restaurant. The questionnaire consisted of two parts: The paired experimental profiles, purchasing behavior and importances of factors affecting pizza purchase. This study generated profiles of 16 hypothetical pizza restaurant based on the seven attributes. The profiles comprised 16 discrete sets of variables, each of which had two levels. For this study, researcher randomly selected 150 students of university as respondents. Twenty students did not complete the survey instrument, resulting in a final sample size of 129. All estimations were carried out using frequencies, $X^2$, independent samples t-test, phreg procedure of SAS package. The results are as follows. Some purchasing behavioral characteristics and importances of factors affecting pizza purchase were significantly different by gender. Based on the estimated models developed for male student group and female student group, the Chi-square statistics were significant at p<0.001. The parameter estimate for late delivery time with male student group was highest, and the parameter estimate for price with female student group was highest. The pizza restaurant that charged \20,000, offered 100% discount on eleventh pizza, promised to deliver pizza in 40 mins, usually delivered the pizza as promised time, offered only 1 type of pizza crust, delivered warm pizza, offered the money-back guarantee was favored by each of male student group and female student group. The results from this study suggested that there was an opportunity to increase market share and profit by improving operations so that customers receive discount and money-back guarantee simultaneously, and by reducing price, delivery time.

Estimation of Water Quality Environment in Youngsan and Seumjin River Basins (영산강과 섬진강 유역의 하천 수질환경 평가)

  • 양해근;최희철
    • Journal of the Korean Geographical Society
    • /
    • v.38 no.1
    • /
    • pp.16-31
    • /
    • 2003
  • The water quality environment in Youngsan and Seumjin river basins was investigated based on the concept of the comprehensive Water Quality Index (WQI) and a spacial pollution source. Artificial factors influencing to river water quality have been analyzed. The specific delivery load of Youngsan river basin was found to be 8.34~97.25 kg/day/$\textrm{km}^2$, Gomagwon stream and Gwangju stream showed the relatively high rates as 97.25 kg/day/$\textrm{km}^2$ and 86.06 kg/day/$\textrm{km}^2$, respectively. The specific delivery load in Seumjin river basin was estimated to be 10.98∼19.51 kg/day/$\textrm{km}^2$, Suggesting no Significant Contribution of pollution. WQI of Youngsan watershed revealed 1.36~3.45, whereas Seumjin watershed showed a relatively low value of 0.5~1.47 And it is concluded that the specific delivery load suggested in this study provides the essential core data of the upper limit of pollutants receptor in the watershed area studied. From this study, it is suggested that the integrated environmental management of river basin requires the analysis of pollutants generation rate of the basin and the receptor capability for the self-purification.

Evaluation of Discharge-Water Quality Characteristics and River Grade Classification of Jinwi River Unit Basin (진위천 단위유역의 유량-수질 특성 및 하천 등급화 평가)

  • Cho, Yong-Chul;Choi, Jin-Woo;Noh, Changwan;Kwon, Phil-Sang;Kim, Sang-hun;Yu, Soonju
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.6
    • /
    • pp.704-716
    • /
    • 2018
  • The aim of this study is to examine the characteristics analysis of the discharge and water quality based on TPLMS (Total Pollution Load Management System) in the Jinwi River unit basin, and to propose a management plan by selecting the point that needs improvement of water quality in order to achieve the target water quality. We evaluated the discharge and water quality characteristics, statistical analysis, daily delivery load and daily delivery density, grade classification, for 14 total pollution load site's from 2014 to 2016 year in Jinwi river unit basin. The average discharge of Jinwi river unit basin is $22.411m^3/s$ and discharge of Hwangguji River is 32.8% and the water quality characteristics along the tributary river were clarified spatially. As the result, it was analyzed that Seongeun River is an indirect indicator of organic pollutants, Gwanri River is a seasonal factor, Osan River and Hwangguji River both affect water quality. Estimation of delivered pollutant loads at the HG-3 site was 6,470.4 BOD kg/day, 6,846.7 TN kg/day and delivered pollutant loads density increased to $220.9BOD\;kg/day/km^2$, $22.4TP\;kg/day/km^2$ at the HG-4 site. This result demonstrates that the total pollution load site needed to improve water quality of the Jinwi River unit basin was HG-3 site.

A Manpower Distribution Model for Software Development Cycle (소프트웨어 개발주기 인력분포 모델)

  • 박석규;박중양;박재홍
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.1
    • /
    • pp.9-18
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project in addition to the schedule options that may be available. Existing software manpower estimation models present the total manpower and instantaneous manpower distribution for the software life cycle. Putnam's Rayleigh and Phillai et al.'s Gamma models present a model with assumption that the manpower is needed at the system delivery. This means that 40 percent of total manpower is applied at the software development, and the other 60% is applied during maintenance phase. However Warburton observes the manpower is needed during development phase with the peak at the completion of the software design phase. So, the existing models were not appropriate to be applied to practical projects. This paper suggests the Sigmoid model which does not consider the point of manpower peak to fix the problem above. The suggested model showed some improvement when practical data was applied. Therefore, the Sigmoid model can be used as alternative of Rayleigh and Gamma model to estimate distribution of manpower during software development phas.

  • PDF

Optimal Effort Allocation in Software Development Phase (소프트웨어 개발 단계별 최적의 노력 할당)

  • 박재흥;노명옥;하석운
    • Journal of the Korea Computer Industry Society
    • /
    • v.3 no.3
    • /
    • pp.295-306
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differ from project to project. This paper suggests the criteria for effort allocation in planning, specifying, building, testing and implementing phase followed by the project total effort. These criteria are derived from 183 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.

  • PDF

Quantitative Estimation of Nonpoint Source Load by BASINS/HSPF (BASINS/HSPF 모형을 활용한 비점오염부하의 정량적 평가)

  • Lee, Jae-Woon;Kwon, Hun-Gak;Yi, Youn-Jeong;Yoon, Jong-Su;Han, Kun-Yeun;Cheon, Se-Uk
    • Journal of Environmental Science International
    • /
    • v.21 no.8
    • /
    • pp.965-975
    • /
    • 2012
  • Loading of NPS pollutant was valued through simulation by using BASINS/HSPF model which can simulate runoff volume in rainfall by time. For the verification of the model, it was analyzed the scatter diagram of the simulation value and measure value of water quality and runoff volume in Dongcheon estuary. Using the built model, a study on the time-variant characteristics of runoff and water quality was simulated by being classified into four cases. The result showed the simulation value was nearly same as that of the measured runoff. In the result of fit level test for measured value and simulated value, correlation of runoff volume was computed high by average 0.86 and in the water quality items, fit level of simulation and measurements was high by BOD 0.82, T-N 0.85 and T-P 0.79.

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF

A Fundamental Study for a System Establishment of Advanced Practice Nursing for Gynecological Cancer Patients (부인암 전문간호사 제도 확립을 위한 기초조사)

  • Park, Chai-Soon
    • Women's Health Nursing
    • /
    • v.12 no.2
    • /
    • pp.87-96
    • /
    • 2006
  • Purpose: This study was conducted to provide fundamental information for a system establishment of advanced practice nursing for gynecological cancer patients (APN-GCP). Method: Data was collected by focus group and individual interviews and analyzed in the framework of the Grounded theory method mapped by Strauss and Corbin (1990). There were 13 subjects in this study (nurses, doctors, patient and her family). Result: We identified 87 concepts, 22 sub-categories, and 10 categories. Categories for role expectation were arrangement of diagnosis and treatment process, giving information of treatment course, support of treatment process, patients' right toward making a decision of treatment, counseling and teaching after discharge from hospital, medical insurance and financial problems, counseling about sexual problems and use of family and community resources. All subjects perceived the necessity of an APN-GCP. An APN-GCP requires over 2$\sim$7 years clinical experience and a master's degree. Services would be performed from initial registration to termination of treatment or death, and accomplished on an outpatient clinic basis. Conclusion: The nursing delivery system and curriculum should be developed for a women's health nurse practitioner including APN-GCP. As a further step, cost-effectiveness and projected estimation of manpower of APN-GCP should be studied in the future.

  • PDF