• Title/Summary/Keyword: Delay period

Search Result 738, Processing Time 0.031 seconds

Some Considerations of the Ignition Delay Period in D.I Diesel Engine (직접분사식 디젤기관의 착화지연기간에 대한 고찰)

  • Bang, Joong-Cheol
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.18 no.2
    • /
    • pp.97-103
    • /
    • 2010
  • The four combustion stages in a diesel engine have close correlation among them. Especially, the ignition delay period has significant effect on the following combustion stage. And the period is also one of inevitable combustion processes in the diesel engine. For example, the diesel knocking is a well-known phenomenon due to the long ignition delay period. The interval of the ignition delay period is affected by the mixture formation process in the cylinder. However, in the case of the D.I. diesel engine, the available duration to make the mixture formation of air-fuel is very short. In addition, the means of the mixture formation mainly depends on the injection characteristics and properties of the fuel. It is difficult to make complete mixture. Therefore, an early stage of combustion is violent, which leads to the weakness of noise and vibration. In this study, using the visible engine, we measured the ignition delay period by photo sensor which detect occurrence of flame and presented the factors of the injection characteristics such as kinds of injection system, the injection pressure and the injection timing. The relation between the ignition delay period and cylinder pressure diagram which was concurrently obtained was also estimated.

Performance Tradeoff Between Control Period and Delay: Lane Keeping Assist System Case Study

  • Cha, Hyun-Jun;Park, Seong-Woo;Jeong, Woo-Hyuk;Kim, Jong-Chan
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.11
    • /
    • pp.39-46
    • /
    • 2015
  • In this paper, we propose a performance-aware workload model for efficient implementation of control systems. When implementing a control algorithm as an embedded computer system, the control code executes periodically. For such systems, its control performance depends on not only the accuracy of the control algorithm itself but also temporal parameters such as control period and sensing to actuation delay. In this regard, this paper studies the relation between control period and delay by measuring and analyzing the control performance of LKAS (Lane Keeping Assist System) with varying period and delay combinations. Through this experimental study, this paper shows that the two timing parameters, i.e.,control period and delay, has a tradeoff relation in terms of control performance.

Precise Delay Generation using a Delay Chain Locked by Multiple Clock Period (다중 클락 주기의 지연체인을 이용한 정밀한 지연발생 회로)

  • Park, Jun-Young;Kang, Jin-Ku
    • Journal of IKEEE
    • /
    • v.3 no.1 s.4
    • /
    • pp.50-56
    • /
    • 1999
  • This paper presents a new technique for generating precise clock delays. The technique can obtain finer timing resolution less than the gate delay of the delay chain by locking in multiple clock period. Using this technique, a 250ps of timing resolution could be achieved from a 750ps delay of the single delay stage in a DLL(Delay Locked Loop) structure. The delay chain of the proposed circuit is locked on three times of the clock period and a finer delay resolution than the absolute gate delay is achieved and verified through the simulation.

  • PDF

An Experimental Study on the Performance of Turbocharged Diesel Engine (터보과급 디이젤기관의 성능에 관한 실험적 연구)

  • Chae, J.O.;Chung, S.C.;Baek, J.H.
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.2 no.6
    • /
    • pp.76-86
    • /
    • 1994
  • Combustion of diesel engine depends on the mixing of air and evaporating fuel during ignition delay greatly. Variation of air-fuel mixing rate and ignition delay for engine operating condition causes difference of combustion, performance and exhaust emissions. This study is investigated in a turbocharged diesel engine of IDI swirl chamber type. In the results, As injection timing is advanced until $12.6^{\circ}$ BTC, ignition delay decreases. NOx concentration and smoke level in exhaust gas increases for advanced injection timing Ignition delay, combustion period, pressure rise rate and exhaust gas temperature are increased with increasing engine speed. And ignition delay at high load is more decreased than that at low load. Ignition delay and combustion period are decreased with increasing intake pressure. Power increases, temperature and CO, NOx concentration in exhaust gas decreases as intake pressure increases. With increasing load, ignition delay is decreased and combustion period, motoring pressure are increased.

  • PDF

Clock period optimaization by gate sizing and path sensitization (게미트 사이징과 감작 경로를 이용한 클럭 주기 최적화 기법)

  • 김주호
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.35C no.1
    • /
    • pp.1-9
    • /
    • 1998
  • In the circuit model that outputs are latched and input vectors are successively applied at inputs, the gate resizing approach to reduce the delay of the critical pathe may not improve the performance. Since the clock period is etermined by delays of both long and short paths in combinational circuits, the performance (clock period) can be optimized by decreasing the delay of the longest path, or increasing the delay of the shortest path. In order to achieve the desired clock period of a circuit, gates lying in sensitizable long and short paths can be selected for resizing. However, the gate selection in path sensitization approach is a difficult problem due to the fact that resizing a gate in shortest path may change the longest sensitizable path and viceversa. For feasible settings of the clock period, new algorithms and corresponding gate selection methods for resizing are proposed in this paper. Our new gate selection methods prevent the delay of the longest path from increasing while resizing a gate in the shortest path and prevent the delay of the shortest path from decreasing while resizing a gate in the longest sensitizable path. As a result, each resizing step is guaranteed not to increase the clock period. Our algorithmsare teted on ISCAS85 benchmark circuits and experimental results show that the clock period can beoptimized efficiently with out gate selection methods.

  • PDF

Development of Delay Compensator for Network Based Real-time Control Systems (네트워크 기반 실시간 제어 시스템을 위한 지연 보상기 개발)

  • Kim, Seung-Yong;Kim, Hong-Ryeol;Kim, Dae-Won
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.82-85
    • /
    • 2004
  • This paper proposes the development of delay compensator to minimize performance degradation caused by time delays in network-based real-time control systems. The delay compensator uses the time-stamp method as a direct delay measuring method to measure time delays generated between network nodes. The delay compensator predicts the network time delays of next period in the views point of time delays and minimizes performance degradation from network through considering predicted time delays. Control output considering network time delays is generated by the defuzzification of probable time delays of next period. The time delays considered in the delay compensator are modeled by using a timed Petri net model. The proposed delay prediction mechanism for the delay compensator is evaluated through some simulation tests by measuring deviation of the predicted delays from simulated delays.

  • PDF

Construction of Delay Predictine Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구)

  • 김정훈;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.131-140
    • /
    • 1999
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the objectives of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the ramp junctions of freeway with 70mph speed limit. From the traffic analyses, and model constructions and verifications for delay prediction on the ramp junctions of freeway, the following results were obtained: ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junction of freeway. ⅲ) The speed-occupancy curve showed a remarkable shift based on the occupancies observed ; Od < 9% and Od$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under Od$\geq$9%, but lowly for delay predicion on the ramp junctions of freeway under Od<9%. Rather, the driver characteristics or transportation conditions around the freeway were through to be a little higher explanatory for the delay perdiction under Od<9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

The Effect of Mixture Component in a Gasoline Engine on Output (The Effect of Ignition Delay and Combustion Period) (가솔린 기관(機關)의 혼합기(混合氣) 성분(成分)이 출력(出力)에 미치는 영향(影響) (점화지연(点火遲延) 및 연소(燃燒) 기간(期間)에 미치는 영향(影響)))

  • Song, J.I.
    • Journal of ILASS-Korea
    • /
    • v.3 no.1
    • /
    • pp.19-26
    • /
    • 1998
  • The effect of mixture component makes a nelay time and a long total combustion period $\tau_{p\;max}$. The flame propagation delay $\tau_{df}$ was determined by the record of current ion. The pressure release delay $\tau_{dp}$ and $\tau_{p\;max}$ were determined by the indicated pressure diagram in constant volume of the combustion chamber. The results are as follows: 1) The ignition delay $\tau_t$ time takes the minimum value around $\Phi=1.15$. 2) $\tau_{df}$ and $\tau_t$ time increased according to the increases of the concentrated dilution gases, because the adiabatic flame temperature decreased due to the increases of the heat capacity. But dilution gases have little effect on flame nucleus formation delay 3) The relation between $\tau_t$ time and reciprocal laminar burning velocity is almost linear. 4) The increase of the propagation length is accompanied with increased ratio of the $\tau_{df},\;\tau_{dp},\;\tau_{t},\;\tau_{p\;max}$.

  • PDF

Variable Rate Limiter in Virus Throttling for Reducing Connection Delay (연결설정 지연 단축을 위한 바이러스 쓰로틀링의 가변 비율 제한기)

  • Shim, Jae-Hong
    • The KIPS Transactions:PartC
    • /
    • v.13C no.5 s.108
    • /
    • pp.559-566
    • /
    • 2006
  • Virus throttling technique, one of many early worm detection techniques, detects the Internet worm propagation by limiting the connect requests within a certain ratio. The typical virus throttling detects worm occurrence by monitoring the length of delay queue with the fixed period of rate limiter. In this paper, we propose an algorithm that controls the period of rate limiter autonomically by utilizing the weighted average delay queue length and suggest various period determination policies that use the weighted average delay queue length as an input parameter. Through deep experiments, it is verified that the proposed technique is able to lessen inconvenience of users by reducing the connection delay time with haying just little effect on worm detection time.

Time Delay Compensation for Output Voltage Vector Selection in Direct Torque Control of Induction Machine (유도전동기의 직접토크제어 시스템에서 출력전압벡터선정을 위한 시간지연의 보상)

  • 최병태;박철우;권우현
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.8
    • /
    • pp.632-639
    • /
    • 2003
  • This paper proposes a simple compensation scheme for the time delay caused by measurement, calculation and selection of voltage vector in Direct Torque Control (DTC) of an induction motor. In general scheme, it is difficult to know the exact delay time, furthermore the delay time can be varied by program routines for calculation and processing of measured data. In this proposed scheme, by applying voltage vector at the beginning of next sampling period, a fixed delay time is achieved and its compensation becomes much simpler. Furthermore, with the simple compensation algorithm, an improved performance can be achieved by shortening sampling period. Experimental results prove the feasibility of the proposed scheme in induction motor control.