Kim, Yongguk;Jo, Byung Gak;Baek, Gwang Hoon;Ryu, Heung-Gyoon
The Journal of Korean Institute of Communications and Information Sciences
/
v.37A
no.10
/
pp.895-902
/
2012
In this paper, we propose a novel equalizer to compensate for the group delay including AM/PM nonlinear distortion characteristics by the nonlinear power amplifier (PA). The group delay characteristic is a nonlinear non-constant time delay that appears differently depending on each frequency component. The phase distortion by AM/PM characteristics arising from the power amplifier is a major factor to increase group delay. By the group delay distortion, the signal in the constellation expands and is rotated. Considering the problem mentioned above, the nonlinear time delay that appears differently depending on each frequency component is classified as a static group delay and AM/PM characteristic of PA, the different phase transitions depending on the size of input signal as a dynamic group delay. Static group delay estimates and compensate for phase distortions in the frequency domain with type-based method and dynamic group delay compensates for phase rotation in the time domain. We confirmed that the group delay compensation techniques were enough to compensate the group delay characteristics including AM/PM characteristics of the power amplifier.
The purpose of this study was to examine the relationships among delay gratification, delay strategy, and parents' child-rearing attitude. The participants of the study were 62, 18-36 month old infants, who demonstrated individual differences in the level of delay gratification and their mothers. The instruments of the study were infant's delay gratification and delay strategy were assessed by Mischele(1974) and the parents' responded to the parents' child-rearing attitude(Cho et al., 1999). Data were collected by menas of conducting observations on infants in experimental settings and completing questionnaires with mothers. The results of this study were as follows: 1. The delay gratification of infants differed accordingly to their age. Older infants displayed increased time in showing their delay gratification, while younger infants relatively exhibited shortened time. There was no significant difference in infants' sex and the order of the birth. 2. Following the age factor, the distraction strategy in the delay strategy played a significant difference to infants. Older infants required a frequent use of the distraction strategy in comparison to younger infants. 3. The previous two factors - delay gratification and distraction strategy-showed a positive relationship. 4. The delay gratification was significantly influenced by infants' age, parents' attitude, direct facing strategy, and infants' distraction strategy. However, the delay gratification was insignificantly accounted for by infants' sex.
HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
Nuclear Engineering and Technology
/
v.47
no.3
/
pp.362-379
/
2015
In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.
The delay on two-lane, Two-way roads is a very important factor which tends to cause relatively high driver loads and too much delay often leads to traffic accidents. In this study a generalized form of delay estimation model was developed based on constant slow moving vehicle speeds, 100% no-passing zone, and flat terrain highway sections. To validate the model, a comparison was made with John Morrall's SMV(Slow Moving Vehicle)model as well as with TWOPAS model. Also a sensitivity analysis was performed to check accuracy of the model. It was found that the model was easy to apply and yet provided reasonable results for experimental conditions specified in the study. It was recommended that speed calculation procedure of the model be improved by further studies, so that the effect of speed acceleration or deceleration according to highway geometries on delay could be analyzed more accurately.
In this paper, we study how to achieve the maximum capacity under delay constraints for large mobile wireless networks. We develop a systematic methodology for studying this problem in the asymptotic region when the number of nodes n in the network is large. We first identify a number of key parameters for a large class of scheduling schemes, and investigate the inherent tradeoffs among the capacity, the delay, and these scheduling parameters. Based on these inherent tradeoffs, we are able to compute the upper bound on the maximum per-node capacity of a large mobile wireless network under given delay constraints. Further, in the process of proving the upper bound, we are able to identify the optimal values of the key scheduling parameters. Knowing these optimal values, we can then develop scheduling schemes that achieve the upper bound up to some logarithmic factor, which suggests that our upper bound is fairly tight. We have applied this methodology to both the i.i.d. mobility model and the random way-point mobility model. In both cases, our methodology allows us to develop new scheduling schemes that can achieve larger capacity than previous proposals under the same delay constraints. In particular, for the i.i.d. mobility model, our scheme can achieve (n-1/3/log3/2 n) per-node capacity with constant delay. This demonstrates that, under the i.i.d. mobility model, mobility increases the capacity even with constant delays. Our methodology can also be extended to incorporate additional scheduling constraints.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.125-129
/
2010
The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
Han, Younghoon;Shin, Mi Young;Ko, Jaeyoung;Cho, Deuk Jae
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.12
/
pp.1690-1696
/
2014
Network RTK generates spatial corrections by using differenced measurements from reference stations in the network, and the corrections are then provided to a rover. The rover, generally, uses linear interpolation, which assumes that the corrections at each reference station are spatially correlated, to obtain a precise correction of its location. However, an irregularity of the tropospheric delay is a real-world factor that violates this assumption. Tropospheric delay is a result of weather conditions, such as humidity, temperature and pressure, and it can cause spatial decorrelation when there are changes in the local climate. In this paper, we have defined the non-linear characteristics of the tropospheric delay between reference stations or user within a region as the "irregularity of tropospheric delay". Such an irregularity can negatively impact the network RTK performance. Therefore, we analyze the influence of the irregularity of tropospheric delay in network RTK based on meteorological data.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.496-501
/
2006
Work delay is the one of facts that make the reliability of construction business decrease. Building a causal classification system of work delay and deducing the managemental item for it gives a great competition to the construction industry. It is, however, so rare to study about work delay so far. Therefore, this research analyzed a questionnaire, which is focussing on the public apartment construction, to look into the causal root factors and deduce the work delay factors. Finally, we suggest a major managing point to remove effectively the work delay factors.
Journal of the Korean Society of Clothing and Textiles
/
v.32
no.5
/
pp.766-776
/
2008
The purpose of this study was 1) to identify the reasons for delay of decision making and the shopping information in internet shopping, 2) to classify consumers based on the clothing benefits, 3) and to examine the differences among consumer groups in the reasons for delay of decision making and the shopping information. The data were collected from a sample of 500 internet shopper aged from 20 to 40. This study used factor analysis, multiple regression analysis, Pearson's correlation analysis, cluster analysis and ANOVA. The results showed that the reasons for delay of decision making consisted of eight factors: Performance risk, Comparison shopping, Economic shopping, Social risk, Uncertainty, Expecting of market change, Product unsatisfaction, Passive shopping. The shopping information consisted of three factors: Product variety, Product information, Additional information. Five factors of clothing benefits were Economy, Figure compensation, Social position, Individuality, and Comfort. The respondents were classified into four groups by five factors of clothing benefits; Individuality seeking group, Low-benefits seeking group, Economy seeking group, Figure compensation/comfort seeking group. There were significant differences among groups in the reasons for delay of decision making and the shopping information among groups. Therefore, marketers need to provide different shopping information for delay closure by target groups.
The Journal of Economics, Marketing and Management
/
v.6
no.1
/
pp.9-16
/
2018
Purpose - Benefit delay type services have a characteristic of benefit delay that does not immediately appear at the time of delivery of service. Due to a characteristic of benefit delay, the customer's participation in the service delivery system is hindered, and the quality of service declines. As a result, customer satisfaction would be reduced. The purpose of this study is to construct an analytical framework to analyze a mechanism that promotes customer participation in benefit delay type services. Research design, data, and Methodology - Existing research has considered only the performance of service companies to enhance the quality of service and customer satisfaction. This study focused on customer participation as a factor affecting the quality of service and customer satisfaction and attempted to construct an analytical framework based on a theoretical perspective of motivational research. Results - By adopting the motivation theory, this research derived three concepts, the possibility of gaining benefits, the emotional experience, and the desire of benefit. And motivation is created when the three factors interact with each other. Conclusions - This paper has constructed an analytical framework for analyzing factors that promote customer participation in the benefit delay service and finally has proposed case study for further research.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.