• Title/Summary/Keyword: Delay Change

Search Result 678, Processing Time 0.023 seconds

Reduction of Channel Change Delay Using Adjacent Channel Delivery in P2P Based IPTV Systems (P2P방식의 IPTV시스템에서 인접채널 전송방식을 이용한 채널변경 지연시간의 단축)

  • Kim, Ji-Hoon;Kim, Young-Han
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.46 no.5
    • /
    • pp.115-121
    • /
    • 2009
  • In this paper, we propose an algorithm that reduces channel change delay time in the P2P based IPTV system. Channel change delay time is considered to be one of the most important performance measures in IPTV system. Proposed algorithm presents a method to reduce the channel change delay time effectively. The algorithm eliminates the first channel change delay time and reduces delay time on a continuous channel surfing. We will show the mathematical models to evaluate the performance of proposed scheme with respect to the channel change delay time.

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

Periodic Properties of a Lyapunov Functional of State Delay Systems

  • Young Soo Suh
    • KIEE International Transaction on Systems and Control
    • /
    • v.2D no.2
    • /
    • pp.92-96
    • /
    • 2002
  • This paper is concerned with properties of a Lyapunov functional of state delay systems. It is shown that if a state delay system has a pure imaginary pole for some state delay, then no Lyapunov functional satisfying a Lyapunov condition exists periodically with respect to change of the state delay. This periodic property is unique in state delay systems and has been well known in the frequency domain stability conditions. However, in the time domain stability conditions using a Lyapunov functional, the periodic property is not known explicitly.

  • PDF

Effects of Flame Transfer Function on Modeling Results of Combustion Instabilities in a 3 Step Duct System (3단 덕트 시스템에서 화염전달함수가 연소불안정 모델링 결과에 미치는 영향)

  • Hong, Sumin;Kim, Daesik
    • Journal of ILASS-Korea
    • /
    • v.25 no.3
    • /
    • pp.119-125
    • /
    • 2020
  • In this paper, we used Helmholtz solver based on 3D finite element method to quantitatively analyze the effects of change of gain, time delay and time delay spread, which are the main variables of flame transfer function, on combustion instability in gas turbine combustor. The effects of the variable of flame transfer function on the frequency and growth rate, which are the main results of combustion instability, were analyzed by applying the conventional heat release fluctuation model and modified one considering the time spread. The analysis results showed that the change of gain and time delay in the same resonance mode affected the frequency of the given resonance modes as well as growth rate of the feedback instability, however, the effect of time delay spread was not relatively remarkable, compared with the dominant effect of time delay.

Stability of Time-Varying Discrete State Delay Systems (이산 시변 상태지연시스템의 안정성)

  • Suh, Young-Soo
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.2
    • /
    • pp.43-47
    • /
    • 2002
  • Stability conditions of time-varying discrete state delay systems are proposed. The time-varying state delay is assumed that (i) the magnitude is known to lie in a certain interval (ii) the upper bound of the rate of change is known. Under these conditions, new stability conditions are derived based on switched Lyapunov functions. Stability conditions for both fast time-varying and slowly time-varying delay are considered.

Analysis of the Lateral Motion of a Tractor-Trailer Combination (II) Operator/Vehicle System with Time Delay for Backward Maneuver

  • Mugucia, S.W.;Torisu, R.;Takeda, J.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.1147-1156
    • /
    • 1993
  • In order to analyze lateral control in the backward maneuver of a tractor -trailer combination , a kinematic vehicle model and a human operator model with time delay were utilized for the operator/vehicle system. The analysis was carried out using the frequency domain approach. The open-loop stability of the vehicle motion was analyzed through the transfer functions. The sensitivity of the stability of the vehicle motion. to a change in the steering angle, was also analyzed. A mathematical model of the closed -loop operator/vehicle system was then formulated. The closed -loop stability of the operator /vehicle system was then analyzed. The effect of the delay time on the system was also analyzed through computer simulation.

  • PDF

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

The Effect of the Delayed Resolution of Cognitive Conflict on Middle School Students' Conceptual Change in Science (인지갈등 해소 지연이 중학생의 과학 개념변화에 미치는 효과)

  • Choi, Han-Yong;Kim, Ji-Na;Choi, Hyuk-Joon;Kwon, Jae-Sool
    • Journal of The Korean Association For Science Education
    • /
    • v.24 no.2
    • /
    • pp.408-415
    • /
    • 2004
  • The purpose of this study is to investigate the effect of the delayed resolution of cognitive conflict on middle school students' conceptual change in learning the concept of the action and reaction with cognitive conflict strategy. The subjects were divided into 3 groups according to the time in which teacher tried to resolve cognitive conflict: instant resolution group, 2-day delay resolution group, and 7-day delay resolution group. Pretest, just before test, posttest, and delayed posttest were examined to measure the degree of conceptual change. Delay resolution groups' students answered the questionnaire asking what they had done to resolve cognitive conflict during the period which had been delayed resolution of cognitive conflict. The results of this study were as follows. First, instant resolution group showed significantly more scientific conceptual change than delay resolution groups. Secondly, most of delay resolution groups' students who tried to resolve cognitive conflict interacted with their peers. Also, delayed resolution of cognitive conflict was not helpful to resolve cognitive conflict. Thirdly, in delay resolution groups, we found the tendency that students who spent more than 30 minutes trying to resolve cognitive conflict altered their preconceptions into scientific concepts more easily than the others did. According to the results of this study, instant resolution of cognitive conflict is more effective on scientific conceptual change than delayed resolution of cognitive conflict.

A Study on the Characteristics of MS Delay Blasting Considering Cooperating Charge (협동장약을 고려한 MS 지발 발파 특성 연구)

  • Kang Choo-Won;Kim Jong-In;Park Joung-Bong
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.11-18
    • /
    • 2005
  • The waveform at the blasting pattern using k13 delay electronic detonator depends on the interference of adjacent delay time according to the degree of distance and frequency. The degree of interference affects the size of blasting vibration at a measuring point. This study analyzed the cooperating change characteristics of MS delay blasting separately detonated at intervals of 40m and presented through frequency the delay time design method that is able to reduce the cooperation of blasting vibration at the MS delay blasting.

Global Finite-Time Convergence of TCP Vegas without Feedback Information Delay

  • Choi, Joon-Young;Koo Kyung-Mo;Lee, Jin S.;Low Steven H.
    • International Journal of Control, Automation, and Systems
    • /
    • v.5 no.1
    • /
    • pp.70-78
    • /
    • 2007
  • We prove that TCP Vegas globally converges to its equilibrium point in finite time assuming no feedback information delay. We analyze a continuous-time TCP Vegas model with discontinuity and high nonlinearity. Using the upper right-hand derivative and applying the comparison lemma, we cope with the discontinuous signum function in the TCP Vegas model; using a change of state variables, we deal with the high nonlinearity. Although we ignore feedback information delay in analyzing the model of TCP Vegas, the simulation results illustrate that TCP Vegas in the presence of feedback information delay shows very similar dynamic trends to TCP Vegas without feedback information delay. Consequently, dynamic properties of TCP Vegas without feedback information delay can be used to estimate those of TCP Vegas in the presence of feedback information delay.