• 제목/요약/키워드: Defense R&D project cost

검색결과 18건 처리시간 0.027초

국방 R&D프로젝트의 일정-비용분석모델의 연구 (A study on a schedule-cost analysis model for defense R&D project planning)

  • 황홍석;류정철;정덕길
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

군용항공기 연구개발 사업의 리스크 관리 (Risk Management for R&D Projects in the Military Aircraft Systems)

  • 김성훈;이현철
    • 산업경영시스템학회지
    • /
    • 제44권4호
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 - (A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness)

  • 박경일;편완주;박영원
    • 시스템엔지니어링학술지
    • /
    • 제4권2호
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구 (A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program)

  • 변형균;이상우
    • 시스템엔지니어링학술지
    • /
    • 제8권1호
    • /
    • pp.51-62
    • /
    • 2012
  • The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.

원가변동과 원가 비목 간 영향력에 관한 연구 -국방연구개발사업을 중심으로- (A study on the relationship between cost fluctuation and cost elements -focused on defense R&D project-)

  • 강경목
    • 한국융합학회논문지
    • /
    • 제9권3호
    • /
    • pp.223-230
    • /
    • 2018
  • 본 연구는 국방연구개발사업의 자료를 통하여 사업 수행 간 원가가 변동되는 양상을 분석하였다. 2가지 형태의 모형을 활용한 실증분석을 통하여 원가변동(개산원가 대비 정산원가)에 영향을 미치는 원가비목과 그 영향력을 확인하였다. 모형1(17개 원가 비목)을 활용한 검증 결과, 17개 원가 비목 중 감가상각비, 관세 등 4개 원가 비목을 제외하고 정산원가 차액과 상관관계를 가지는 것을 확인하였다. 대표적으로 직접노무비의 영향력은 1.022이고 외주가공비의 영향력은 0.942로 확인되었다. "직접노무비 중심의 원가 계산"을 고려한 모형2(직접비)를 이용한 검증 결과, 모든 직접 원가 비목이 정산원가 차액과 상관관계를 가지는 것을 확인하였다. 대표적으로 직접노무비의 영향력은 2.014이고 외주가공비의 영향력은 1.068로 확인되었다. 이 연구의 결과를 통해 "직접노무비 중심의 원가계산"을 실증분석 하였고, 외주가공비를 활용한 원가 절감 유인 또한 발견하였다.

Assessing the Value of Research and Exploratory Development Stage of an R&D project under Duopoly and Oligopolistic Competition

  • 최돈호;김지수
    • 기술혁신연구
    • /
    • 제4권1호
    • /
    • pp.165-183
    • /
    • 1996
  • In acquiring and transferring a superior knowledge assesing the intermediate result value of a competitive R&D project is very important for a firm engaging in R&D. Most existing literatures on R&D evaluation are concerned with project selection and resource allocation. In this paper the stage of an R&D project is classified into research, exploratory development, and development. And a model is suggested which evaluates the intermediate result value before completion of development stage under duopoly and oligopolistic competition. Assessed value of the intermediate result transferred to the next tier company can be used as a minimum acceptable price to the inventor when more advanced knowledge acquired through R&D is transferred to the next tier one. The model suggested is composed of structural variables including research cost, success rates, potential profits, discount rate degree of competition. By using exponential distribution for invertion process time in each stage, we derive a formula that can assess the value of the intermediate result, and we demonstrate how the model can be applied to a competitive R&D situation through an example.

  • PDF

국방무기체계 획득절차 발전방향 - 미국 국방획득절차 개선노력을 중심으로 - (A Study for Defense Acquisition System Improvement)

  • 고심재
    • 한국국방경영분석학회지
    • /
    • 제31권2호
    • /
    • pp.86-104
    • /
    • 2005
  • During the 'Cold War', DoD had focused on the high performance and timely acquisition which enabled quick field out the superior weapons than the enemy regardless of acquisition cost. But, after the cold war, the focus has been changed to the 'cost effective acquisition' of weapon systems because of tremendous investment cost & economic theory. The U.S. DoD has been tried to make 'the most effective acquisition system'(AR, Acquisition Reform) from mid-80's with their enough experienced program data, and as a result, they had launched the new acquisition procedure - DoD 5000 series - in 1996. DoD is continuously doing the study and making several improvements on the procedure after it had been once announced. On Oct 30. 2002, DoD noticed that they cancelled the DoD 5000 series documents(5000.1, 5000.2, 5000.2-R) and 5000.2-R will be reissued as a guide. The most recent version which focused on 1) evolutionary acquisition and spiral development, 2) procedure for future technology systems including software and IT, 3) supplement on the area of efficiency, flexibility, creativity and innovation of old system was issued by May 12. 2003. This article suggests a 'good idea' based on the reviewing of these DoD efforts for our defense acquisition regulation and procedure to go. It includes the CAIV concept application, IPT utilization, T&E method, cost or price based contract etc-all for the effective acquisition.

기동무기체계 개발에서 외형 디자인 결정 프로세스에 관한 연구 (The Study on the Exterior Design Decision Process of the Maneuver Weapon System Development)

  • 윤병조;이호
    • 시스템엔지니어링학술지
    • /
    • 제13권2호
    • /
    • pp.1-8
    • /
    • 2017
  • The Core in Weapon system R&D is to realize the user required capabilities in limited schedule and cost. Therefore, the design of weapon system focuses to functional design for realization of requirement capabilities. However, the weapon system should not only basically bring the confidence to friendly forces bring fear to enemy forces to maximize the operational effectiveness of weapon systems and we consider the exterior design as the important factor to compete with foreign systems in international defense market besides capabilities and cost. For that reason, we made study case about the visual design decision process applied to the LVT(light tactical vehicle) project which was recent successful deployment among the many R&D projects of auto industry. Based on this case, this study suggests the necessity of the exterior design decision process the maneuver weapon system is developed.

국방무기체계 연구개발사업의 EVMS 적용실태 분석 (Analysis of EVMS Implementation to Korean Defence R&D Project)

  • 민원배;강석중;송운호
    • 한국정보통신학회논문지
    • /
    • 제14권1호
    • /
    • pp.242-250
    • /
    • 2010
  • EVMS(Earned Value Management System)는 사업을 관리하는 정부나 사업을 수행하는 업체의 관리자들이 비용과 일정을 주기적으로 추적함으로써 현재의 사업진행 상태를 파악하고 미래를 예측할 수 있는 관리기법이다. 이 관리기법은 미국, 호주 등에서 국방연구개발 사업에 의무적으로 적용해오고 있으며, 그 효율성이 이미 입증된 기법이다. 그러나 외국에서 수행하고 있는 EVMS를 그대로 우리나라에 도입하는 것은 환경적 차이로 인해 많은 문제점을 가지고 있기 때문에 우리나라에 환경에 적합한 EVMS 적용을 위해 연구를 꾸준히 수행하고 있다. 본 논문에서는 먼저 EVMS에 대한 개념을 먼저 고찰 해보고, 저자가 직접 관리하고 있는 차기경구난차량 연구개발사업에 적용한 EVMS 적용실태 분석을 통해 문제점을 도출하고자 한다.

기술난이도와 기술성숙도를 이용한 핵심기술 연구개발 위험도 관리에 관한 연구 (A Study on the Risk Management of Core Technology R&D Project using Degree of Difficulty and Technology Readiness Level)

  • 이태형
    • 한국군사과학기술학회지
    • /
    • 제19권6호
    • /
    • pp.789-796
    • /
    • 2016
  • In the Core Technology R&D of the defence area, the development of the related core element technology could be the foundation to develop advanced weapon system in the future. But it might make various problems if you can not accurately define the TRL of the element technology. In other words, if the technology is not sufficiently mature and then the project starts, it might require an increase in the development period and additional cost. Finally the system will be in an incomplete state and result in user dissatisfaction and the project failure. Therefore it is a very important task to properly assess the TRL for a successful project. In this study, We propose the method for risk management of core technology R&D project of the defence area using the QFD process with degree of difficulty and technology readiness level. It is also presented the process to determine the risk level using TRL and Degree of difficulty. Finally We apply this method to UGV system for verifying the result of this study.