• Title/Summary/Keyword: Defense Project Management

Search Result 121, Processing Time 0.023 seconds

Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project (군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구)

  • Junho Park;Chie Hoon Song
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

A Study on the Organization and Procedures for Acquiring Power Support System and the Development of Collaborative System (전력지원체계 획득조직 및 절차와 협업체계 발전방안 연구)

  • Kyojoon Choo;Myoungjin Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.304-311
    • /
    • 2023
  • The 4th Industrial Revolution and the continuous development of Science and Technology have also required a speedy business promotion method in the defense industry. Advanced countries including the United States are already boldly innovating the existing high-cost and long-term acquisition system with the highest priority in weapons development to cope with the military rise of Russia and China. The Ministry of National Defense and the Defense Acquisition Program Administration have also recently introduced a quick acquisition system and are applying it to business promotion. In addition, some small-scale projects and weapons systems are being reorganized so that they can be managed by the units demanding them. After an organizational diagnosis of the Project Acquisition Group by the Ministry of National Defense in 2020, it has been reassigned as a subordinate unit of the Army Logistics Command from a direct unit managed by the Army HQ. As a result, problems such as work conflict or redundancy have been identified. In addition, a system has been implemented to shorten the acquisition period by applying a rapid acquisition program in the field of weapons systems by benchmarking the rapid acquisition program of advanced countries. The force support system project process will also need to introduce such a quick acquisition system. In addition, the Ministry of National Defense is considering ways to delegate some weapon systems to each military, which will then carry out tasks ranging from requirements determination to project management. Accordingly, it is now time to expand the organization for the management of the Army's weapons system acquisition project. Therefore, in this paper, the Army Project Acquisition Group was analyzed on its organization, acquisition procedures, and cooperation systems, with presentations of development plans for each field.

An Analysis of Effect and Limitation when Adapting Earned Schedule Method for Schedule Management and Estimation in Korean Defense Research & Development Projects (한국 국방 연구개발 프로젝트 일정 관리 및 예측을 위한 Earned Schedule 기법의 적용 효과와 한계 분석)

  • Cho, Jungho;Lim, Jaesung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.3
    • /
    • pp.396-402
    • /
    • 2018
  • Earned Value Management(EVM) has been used to manage and forecast defense project schedule and cost over the last two decades in the world. However to support the lacking ability of schedule analysis in traditional EVM, earned schedule(ES) has been introduced as a tool to more accurately estimate schedule performance. This paper compares which method EVM or ES, provides more accurate schedule predictors in 32 Korean defense research and development projects. As a result of comparison, the ES method can predict the future schedule more reliably than the EVM method. We also analyze early warning function of schedule performance index considering project duration extension point. Through the analysis results, we confirm that both the EVM and the ES method lack the ability of the early warning in terms of the current schedule management criterion.

Economical & Technological Ripple Effects in Acquiring New Weapon System : Focused on Ground·Sea·Air Weapon System (국방무기체계 연구개발 기반 경제적·기술적 파급효과 : 지상·해상·공중 무기체계를 중심으로)

  • Shin, Sang-Wook;Oh, Cheon-Kyun;Yim, Dong-Soon;Choi, Bong-Wan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.111-122
    • /
    • 2018
  • The private sector is currently reviewing the feasibility of the project or deciding economic policies by analyzing the economic ripple effects. However, the arms acquisition project focuses on the need for the national defense weapons system by analyzing the costs and the effectiveness of the analysis and reviewing the necessity and feasibility of the project. In order to analyze the economic ripple effects, KB (the Bank of Korea) prepares and publishes an analysis table of industrial associations in a given unit. IAAR (the industrial association analysis report) is difficult to apply directly to the defense weapons system. Therefore, research on the economic ripple effects applicable to the defense arms procurement project was needed. In this study, we propose the generic methodology for estimating economical and technical ripple effects resulted in acquiring new weapon systems. Based on the analysis of inter-industrial relations, economical ripple effects are estimated with production inducing effects, value-induced effects, employment-induced effects and export-induced effects. Also, the technological ripple effects are estimated with technological intensity represented by investment cost in research and development. To show the validity of proposed methodology, a case study of acquiring new weapon systems such as GR (guided rocket), destroyer, and helicopter is accomplished. From the case study, it is concluded that these economical & technological ripple effects can be used as a reference to decision making in the course of acquiring major future defense weapons systems.

Stepwise process of Military force acquisition strategy considering Defense Planning and Management System (국방기획관리체계를 고려한 단위사업획득전략의 단계화 작성방안 - '사업추진기본전략'을 중심으로 -)

  • Shin, Hee-Rae
    • Journal of National Security and Military Science
    • /
    • s.13
    • /
    • pp.109-136
    • /
    • 2016
  • Define the importance and role of the acquisition strategy based on the Defense Acquisition Management System, diagnose and analyze the actual state of document preparation. We analyzed the timing and details of the basic strategy of the project in 2015 and suggested a supplementary plan to improve the efficiency of Military force improvement projects in conjunction with the Defense Planning and Management System. It is necessary to reduce the preparation period including the policy decision making process and then divide it into planning and programming stages to complement the role of acquisition strategy. In order to apply these improvements, the necessary revision of laws and regulations to be reviewed is referred to, enabling continuous research.

  • PDF

Calculation TRL using Integration Readiness Between Technologies for Supporting Technology-transition of Defense Technologies to the Defense Weapons System (국방시스템 기술전이지원을 위한 기술성숙도 도출에 관한 연구)

  • Bae, Yoon-Ho;Choi, Seok-Cheol
    • Korean Management Science Review
    • /
    • v.26 no.3
    • /
    • pp.157-167
    • /
    • 2009
  • Technology transition from defense technology to weapon system is an important process for defense acquisition program. Many countries such as USA, UK, Australia and Republic of Korea use technology readiness level (TRL) as a tool for technology transition by identifying critical technology elements (CTEs) and assessing the technology maturity. In this paper we review a transition process for the defense acquisition. Then we suggest a method to evaluate system's TRL using each component TRL and integration readiness level (IRL) between each technologies. We apply the method to an ACTD project. A result show that technology maturity is influenced by integration between technologies.

Determination of Key Elements Using FTA/FMEA Safety Techniques for Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법 FTA/FMEA의 활용을 통한 핵심요소의 결정)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.50-61
    • /
    • 2018
  • A precedent defense project study was carried out in the early stage of the project to support efficient determination of the acquisition method of the determined weapons system. A precedent study in the early stage of the project has been neglected, but lack of performance and increased costs are continuing problems. In a precedent study on a number of items within a limited time frame, expected risks during project implementation were not identified and reduced by failing to review the key review element in depth. Therefore, in this paper, we studied the application of the FTA/FMEA technique used in the system safety analysis process to identify key factors to be considered when carrying out the defense research project. The methodology for the development of the key review items was established through the improvement of the FTA/FMEA technique in order to meet specific conditions and given conditions. Based on the results of this study, we redefined core key factors in the precedent study stage, thereby eliminating unnecessary and anticipated risks that may arise in the future project management aspects of the defense project. It is anticipated that this will reduce costs and time in terms of the lifecycle of the weapon system and promote stable operation of the project through reduction of risk.

Case Study and Performance Analysis of IT Convergence Business Models for Defense Sector (국방 IT융합 비즈니스 모델 사례와 성과 분석)

  • Sim, Seungbae;Yoo, Cheonsoo;Hong, Sumin
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.275-287
    • /
    • 2015
  • Information technology (IT) convergence have been recognized one of the key drivers in the industry perspective. Especially, IT convergence have been one of the most important innovative way for defense sector. Korea government established IT convergence policy in 2008 and have been applying it to the core industry such as automotive, shipbuilding and defense industries. Recently, the creative vitamin project has been launched. Vitamin 'D' means the way to create the value of defense industry. This research analyzes and evaluates various IT convergence business models based on an operation of defense IT convergence center from 2011 to 2014, which is the industry IT convergence centers. Defense IT convergence business models can be classified into four types of mission area as follows : weapon acquisition and management, military intelligence, military power construction, and resources management. We define the concept of defense IT convergence and describe the framework and processes for applying IT to the defense sector. We analyzes and evaluates various business models designed through defense IT convergence framework and processes.

A Study on Trend of Technology Development for Part Localization of Weapon System through Patent Information (특허정보를 이용한 무기체계 부품국산화 개발기술 동향조사 및 분석)

  • Kim, Sung-Kyu;Choi, Chung-Seok;Choi, Yoon-Hyeok;Kim, Jin-Ha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.524-533
    • /
    • 2021
  • Recently, due to the increasing necessity of developing core parts for weapons systems, the project for localization of parts for weapons systems is expanding. In order to apply the developed core parts to the domestic weapon system and advance into the overseas market, it is necessary to plan a project that reflects the technology trends in advance. This study derived trend of technology development through conducting the patent research and analysis. Also, suggested plan for applying the analysis results when project planning and selecting. As a detailed method, patents related to the 2019 year selection project were investigated. The number of patent applications by year and number of applicants from the time of the first application to the present were analyzed. And the growth stage of the technology market was derived. The comprehensive result was derieved through the portfolio analysis by arranging the parts localization technology in each area of the matrix consisting of market growth stage and the criteria for the selection of parts localization project. This research suggested the applying plan for improving project selection process. we expect the promotion of defense industry and the effective task planning.

Analysis of EVMS Implementation to Korean Defence R&D Project (국방무기체계 연구개발사업의 EVMS 적용실태 분석)

  • Min, Won-Bea;Kang, Seok-Joong;Song, Woon-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.1
    • /
    • pp.242-250
    • /
    • 2010
  • EVMS(Earned Value Management System) is a project management method for analysis of current state of project and estimation of future state by the periodic tracking of schedule and value that activated by the project manager of government and contractor. Some countries, such as U.S.A and Austria, require the use of an EVMS for all major defense R&D project and many cases have proved that EVMS ensures that cost, schedule, and technical aspects of the contract are truly integrated and estimated, and actual progress of the project can be identified. However, the recent implementation of EVMS on Korean defense R&D project has shown number of challenges. In this paper, we defind the cancept of EVMS and analyzed EVMS implementation m order to conduct their problem.