• Title/Summary/Keyword: Defects liability period

Search Result 15, Processing Time 0.033 seconds

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

The Rules of Law on Warranty Liability in Contracts for the International Sale of Goods - With Special Reference to CISG - (국제물품매매계약에 있어서 하자담보책임에 관한 법리 - CISG를 중심으로 -)

  • Hong, Sung-Kyu
    • Journal of Arbitration Studies
    • /
    • v.24 no.4
    • /
    • pp.147-175
    • /
    • 2014
  • In contracts for the international sale of goods, a seller must deliver appropriate goods and hand over relevant documents according to a contract, which will transfer the ownership of the goods to a buyer. In this case, if there are defects in the contracted goods, the warranty liability will occur. However, in the United Nations Convention on Contracts for the International Sale of Goods (CISG), a term-the conformity of the goods to the contract-is used universally instead of the warranty. According to the CISG, a seller must deliver goods in conformance with the relevant contract in terms of quantity, quality, and specifications, and they must be contained in vessels or in packages according to the specifications in the contract. In addition, a certain set of requirements for conformity will be applied implicitly except when there is a separate agreement between parties. Further, the base period of conformity concerning the defects of goods is the point when the risk is transferred to the buyer. A seller shall be obliged to deliver goods that do not belong to a third party or subject to a claim then, and such obligations shall affect the right or claim of a third party to some extent based on intellectual property rights clauses. If the goods delivered by the seller lack conformity, or incur right infringement or claim of a third party, then it shall be regarded as a default item per the obligation of the seller. Thus, the buyer can exercise diverse means of relief as specified in Chapter 2, Section 3 (Article 45-Article 52) of the CISG. However, such means of relief have been utilized in various ways for individual cases as shown in judicial precedents made until now. Contracting parties shall thus keep in mind that it is best for them to make every contract airtight and they should implement each contract thoroughly and faithfully to cope with any possible occurrence of a commercial dispute.

  • PDF

Life Cycle Costing: Maintenance and Repair Costs of Hospital Facilities Using Monte Carlo Simulation

  • Kim, Tae-Hui;Choi, Jong-Soo;Park, Young Jun;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.541-548
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

Review of 2010 Major Medical Decisions (2010년 주요 의료 판결 분석)

  • Lee, Jung-Sun;Seo, Young-Hyun;Yoo, Hyun-Jung
    • The Korean Society of Law and Medicine
    • /
    • v.12 no.1
    • /
    • pp.177-225
    • /
    • 2011
  • Verdicts related to major medical litigation given by the Seoul Central District Court, the Seoul High Court and the Supreme Court in 2010 were analyzed. It's shown that in cases of the medical negligence regarding the occurrence of neonatal cerebral palsy, the plaintiff claims were dismissed using criteria proposed by associations of Obstetrics and Gynecology and Pediatrics in US, and thereof the burden of plaintiffs to prove the medical negligence has increased. In addition, in case of that the expected survival period of infants gets longer, payments for treatment and nursing after survival period determined by judges are made and it was judged to compensate it as a periodical indemnity. In case for the explanation obligation the most frequently mentioned in the medical litigation, in addition to cases of invoking the existing theory of explanation obligation, verdicts to mention the instructions of theory regarding instruction explanation obligation and the possibility of compensation for damages on property are given. Particularly, in cases for a liability of reparation by exaggerating the effects and not disclosing the risks related to treatment with stem cells, even if the treatment not approved by Food and Drug Administration is in violation of the Pharmaceutical Affairs Law, it's not illegal as violation in Pharmaceutical Affairs Law itself. But there is a certain verdict to present the possibility of an extension of the theory of explanation obligation by acknowledging the liability of reparation caused by illegal acts with no explanations of effects and risks of treatment with stem cell by doctors and pharmaceutical companies. In an incident in which a mental patient fell and died through the opened door of the roof at the hospital, a liability of reparation was acknowledged due to defects in structure installation management and this verdict drew an attention since the overall management responsibility about patients including structures was acknowledged to the hospital besides the obligations on medical practice. In case of the verdict without giving the opportunity to state the opinion with respect to the main legal issues, the responsibility of the court was emphasized since the court did not fulfill the explanation obligations. There were some cases in which payments for nursing and caring to a patient in vegetative state during the plastic surgery was admitted. However, in dental-related incidents, the proportion of cases in which plaintiff won was low since the difficulty of proving may be reflected. In the area of administrative litigation, unlike the existing position regarding arbitrary medical charge cover collected from patients in hospital, the verdict to admit the legitimacy of collection of medical treatment was given and attracted the attention of people. Verdict in which the expression related to medical advertisement was not exaggerated disposed the original verdict and pointed out the problem of excessive regulations on medical advertisement. The effort to analyze the trend of verdicts of court through reviewing the decisions and to organize should be continued, but the full decision should be disclosed as a base, and people and systems to enable the all time monitoring should be prepared.

  • PDF