• 제목/요약/키워드: Deepwater installation

검색결과 7건 처리시간 0.028초

Integrated Simulations of a Floating Crane Installation Vessel with DP systems in Waves

  • Nam, B.W.;Hong, S.Y.;Kim, Y.S.;Kim, J.W.
    • Journal of Advanced Research in Ocean Engineering
    • /
    • 제1권2호
    • /
    • pp.85-93
    • /
    • 2015
  • The nonlinear time-domain analysis method was implemented to carry out a series of integrated simulations for a deep-water crane vessel system composed of four sub components, including a floating vessel, lifted equipment, hoisting cable and dynamic positioning (hereinafter DP) system. The analysis of the coupled dynamics consists of the crane vessel and equipment connected using the crane wire, and the DP is modeled according to the wind, wave and current conditions. The DP systems were numerically implemented using a classical PD feedback controller, and various simulations of the deepwater installation were conducted using different conditions in order to evaluate the global performance of the floating crane vessel combined with the DP system.

Buckling response of offshore pipelines under combined tension and bending

  • Gong, Shun-Feng;Ni, Xing-Yue;Yuan, Lin;Jin, Wei-Liang
    • Structural Engineering and Mechanics
    • /
    • 제41권6호
    • /
    • pp.805-822
    • /
    • 2012
  • Offshore pipelines have to withstand combined actions of tension and bending during deepwater installation, which can possibly lead to elliptical buckle and even catastrophic failure of whole pipeline. A 2D theoretical model initially proposed by Kyriakides and his co-workers which carried out buckling response analysis of elastic-plastic tubes under various load combinations, is further applied to investigate buckling behavior of offshore pipelines under combined tension and bending. In association with practical pipe-laying circumstances, two different types of loadings, i.e., bent over a rigid surface in the presence of tension, and bent freely in the presence of tension, are taken into account in present study. In order to verify the accuracy of the theoretical model, numerical simulations are implemented using a 3D finite element model within the framework of ABAQUS. Excellent agreement between the results validates the effectiveness of this theoretical method. Then, this theoretical model is used to study the effects of some important factors such as load type, loading path, geometric parameters and material properties etc. on buckling behavior of the pipes. Based upon parametric studies, a few significant conclusions are drawn, which offer a theoretical reference for design and installation monitoring of deepwater pipelines.

Analytical Research of Topside Installation in Mating phase with Crane Vessel

  • Lee, Jong-Hyun
    • 한국해양공학회지
    • /
    • 제25권4호
    • /
    • pp.1-6
    • /
    • 2011
  • The installation of a topside structure can be categorized into the following stages: start, pre-lifting, lifting, lifted, rotating, positioning, lowering, mating, and end of installation. The transfer of the module onto the floating spar hull occurs in the last three stages, from lowering to the end. The coupled multi-body motions are calculated in both calm water and in irregular waves with a significant wave height (1.52m). The effects of the hydrodynamic interactions between the heavy lifting vessel and the spar hull during the lowering and mating stages are considered. The internal forces caused by the load transfer and ballasting are derived for the mating phases. The results of the internal forces for the calm water condition are compared with those in the irregular sea condition. Although the effect of the pitch motion on the relative vertical motion between the deck of the floating structure and the topside module is significant in the mating phases, the internal force induced pitch motion is too small to have this influence. However, the effect of the internal force on the wave-induced heave responses in the mating phases is noticeable in the irregular sea condition because transfer mass-induced draught changes for the floating structure are observed to have higher amplitudes than the external force induced responses. The impacts of the module on the spar hull in the mating phase are investigated.

Advanced procedure for estimation of pipeline embedment on soft clay seabed

  • Yu, S.Y.;Choi, H.S.;Park, K.S.;Kim, Y.T.;Kim, D.K.
    • Structural Engineering and Mechanics
    • /
    • 제62권4호
    • /
    • pp.381-389
    • /
    • 2017
  • In the present study, the advanced procedure has been proposed to estimate higher accuracy of embedment of pipes that are installed on soft clay seabed. Numerical simulation by OrcaFlex simulation code was performed to investigate dynamic seabed embedment, and two steps, i.e., static and dynamic analysis, were adopted. In total, four empirical curves were developed to estimate the seabed embedment including dynamic phenomena, i.e., behaviour of vessel, environmental condition, and behaviour of nonlinear soil. The obtained results were compared with existing methods (named general method) such as design code or guideline to examine the difference of seabed embedment for existing and advance methods. Once this process was carried out for each case, a diagram for estimating seabed embedment was established. The applicability of the proposed method was verified through applied examples with field survey data. This method will be very useful in predicting seabed embedment on soft clay, and the structural behaviours of installed subsea pipelines can be changed by the obtained seabed embedment in association with on-bottom stability, free span, and many others.

Subsea System 최적 설계 요소에 관한 연구 (Study on Parameters for Optimum Design of Integrated Subsea System)

  • 최한석;도창호;이승건
    • 대한조선학회논문집
    • /
    • 제49권4호
    • /
    • pp.340-349
    • /
    • 2012
  • The mitigation of gap between technology and it's applicability in the oil and gas industry has led to a rapid development of deepwater resources. Historically, subsea wells have good track records. However, an ever increasing water depths and harsher environments being encountered are currently posing challenges to subsea production. Complex subsea systems are now being deployed in ways rarely encountered in previous development schemes. These increasingly complex systems present a number of technical challenges. This study presents the challenges in subsea production systems, considering the technical and safety issues in design and installation associated with current development modality.

해양 시추시스템 구성요소에 대한 이해 및 동향분석 (Understanding of Offshore Drilling System and Trend Analysis)

  • 우남섭;권재기;박종명;김상식;김영주
    • 대한기계학회논문집 C: 기술과 교육
    • /
    • 제1권1호
    • /
    • pp.33-38
    • /
    • 2013
  • 해상에서의 시추작업은 해저면을 통해서 시추되는 유정에서 이루어지는 일련의 기계적 프로세스라 할 수 있다. 해양 시추설비는 해저에 매장된 석유나 가스의 매장량 확인을 위한 테스트 유정(well)과 이를 경제성 있는 생산용 유정으로 만들기 위해 사용되는 시설로 해양에서의 시추작업은 대부분 타 지역으로의 이동을 위해 이동식으로 제작되며, 작업 해역의 수심에 따라 크게 리그(jack-up, semi-submersible)와 드릴십(drillship)으로 구분할 수 있다. 최근에는 석유와 가스의 개발을 위한 시추작업이 급진적으로 심해로 옮겨가고 있으며 작업 가능 수심이 3,000 m에 이르고 있다. 본 논문에서는 이러한 해상 시추설비에 탑재되는 대표적 해양플랜트 기자재인 시추시스템을 소개하고 최근의 기술개발 동향을 알아보고자 한다.