A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.4
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

A Framework of Decommissioning Cost Estimation for Nuclear Research Facilities (원자력연구시설 해체비용 산정 구조)

  • Jeong Kwan-Seong;Lee Dong-Gyu;Lee Kune-Woo;Oh Won-Zin;Jung Chong-Hun;Park Jin-Ho
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.2
    • /
    • pp.171-178
    • /
    • 2006
  • Decommissioning cost estimation is a very important technique in designing and planning of nuclear facilities' decommissioning. Decommissioning cost estimation should be made according to the phases of decommissioning activities and installed components of nuclear facilities. In this paper, the basic framework necessary for decommissioning cost estimation is completed so that it could be used as a technique for decommissioning costs estimation by specifying cost items and group components and unit cost factors on which work time is calculated. Also, factors to be considered for decommissioning cost estimation of major activities and tasks are reviewed. Afterwards, these techniques will be utilized as a basic technology to establish methodology of decommissioning cost estimation and evaluation.

  • PDF

A Study of the Decommissioning Cost Estimation for Nuclear Facilities (원자력 시설 해체비용 산정에 관한 고찰)

  • 이동규;정관성;이근우;오원진
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.85-96
    • /
    • 2004
  • This paper is to study on the decommissioning cost estimation for nuclear facilities of advanced nuclear organizations and countries for deriving the cost factors to be taken considerations into accomplishing decommissioning projects. Of cost categories producing the factors of decommissioning costs, dismantling and waste processing & disposals activities are examined to increase the its costs. Of labor, materials and other costs categories, labor costs are summarized to have overall majorities in the decommissioning cost factors. The main parameters of all factors affecting the decommissioning costs are analyzed as work difficulty, regional labor costs, peripheral cost, disposal cost and final burial costs.

  • PDF

A Study on Decommission Cost Estimation Framework with Engineering Approach (공학적 접근을 통한 해체비용 산정 프레임워크에 대한 고찰)

  • Lee, Sun Kee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.57-67
    • /
    • 2012
  • It is the sensitivity and confidentiality of nuclear power plant decommissioning cost that prevent detailed cost information to be released to the public, which causes some limitation to analyze and reuse the costs. This limitation to access cost information means that the lessons learned from preceding cost estimating may not systematically feed back into following cost estimates. As an alternative, decommissioning cost estimation framework is indispensable to reflecting available experience and knowledge for decommission costs. This study provides the cost estimation framework including data flow and structuralization based on engineering and bottom up approach to enhance decommissioning cost estimation.

Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor (연구용원자로 해체비용 산정을 위한 단위비용인자 산출)

  • Jeong, Kwan-Seong;Lee, Dong-Gyu;Jung, Chong-Hun;Lee, Kune-Woo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.4
    • /
    • pp.385-391
    • /
    • 2006
  • The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  • PDF

A Study on the Configuration of Cost Items and the Identification of Cost Affecting Factors for the Decommissioning Cost Estimation of Nuclear Research Facilities (원자력연구시설 해체비용 산정을 위한 비용항목 구성 및 비용 영향인자 산출 방안)

  • Jeong Kwan-Seong;Lee Dong-Gyu;Lee Kune-Woo;Oh Won-Zin
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11a
    • /
    • pp.25-31
    • /
    • 2005
  • The decommissioning cost estimation is the very essential procedure to establish the decommissioning plans for Nuclear Research Facilities. The cost estimation must be made in accordance with activity phase and facility installations. This paper shows how to configuring the cost items and identifying the effecting cost factors. In the end, these methods will be utilized as a tool and technique to develop the methodology of cost estimation and calculation program.

  • PDF

A Study on the Method of Cost Estimation for the Decommissioning Plan by the Analysis of Domestic Cyclotron Dismantling Practices (국내 사이클로트론 해체 사례 분석을 통한 해체 계획 비용 산정 방법 연구)

  • Woo, Rina;Kim, Yongmin
    • Journal of the Korean Society of Radiology
    • /
    • v.8 no.3
    • /
    • pp.97-103
    • /
    • 2014
  • Decommission of medical cyclotron give rise to a lot of low-level radioactive waste and costs. Decommissioning cost should be reasonably calculated according to the decommissioning activities and installed components of facilities. In this paper, we investigated the experience on the cyclotron relocation from SNUH(Seoul National University Hospital) to SKKU(Sungkyunkwan University) and analyzed radioactive waste management costs by applying the disposal scenarios. Also considerations for decommissioning cost estimation are reviewed. The results could be utilized as a basic data for establishment on the methodology of decommissioning cost estimation and evaluation.

Decommissioning Cost Estimation of Kori Unit 1 Using a Multi-Regression Analysis Model (회귀 분석 모델을 이용한 고리 1호기 해체 비용 추정)

  • Joo, Han Young;Kim, Jae Wook;Jeong, So Yun;Moon, Joo Hyun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.18 no.2_spc
    • /
    • pp.247-260
    • /
    • 2020
  • A multi-regression model was developed to estimate the decommissioning cost for Kori unit 1 using foreign nuclear power plant (NPP) decommissioning cost data. First, the decommissioning cost data were collected for 13 boiling water reactors and 16 pressurized water reactors and converted into the values as of November 2019. Then, for the regression model, the decommissioning cost was chosen as the dependent variable, and two variables were selected as independent variables: a contamination factor that was designed to reflect the operational characteristics of the decommissioned NPP and the decommissioning period. A statistical package in the R language was used to derive the regression model. Finally, the regression model was applied to estimate the decommissioning cost for Kori unit 1. The estimated decommissioning cost for Kori unit 1 was 663.40~928.32 million US dollars (782,812~1,095,418 million Korean won).

Comparison of Compton Image Reconstruction Algorithms for Estimation of Internal Radioactivity Distribution in Concrete Waste During Decommissioning of Nuclear Power Plant (원전 해체 시 방사성 콘크리트 폐기물 내부 방사능 분포 예측을 위한 컴프턴 영상 재구성 방법의 비교)

  • Lee, Tae-Woong;Jo, Seong-Min;Yoon, Chang-Yeon;Kim, Nak-Jeom
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.18 no.2
    • /
    • pp.217-225
    • /
    • 2020
  • Concrete waste accounts for approximately 70~80% of the total waste generated during the decommissioning of nuclear power plants (NPPs). Based upon the concentration of each radionuclide, the concrete waste from the decommissioning can be used in the determination of the clearance threshold used to classify waste as radioactive. To reduce the cost of radioactive concrete waste disposal, it is important to perform decontamination before self-disposal or limited recycling. Therefore, it is necessary to estimate the internal radioactivity distribution of radioactive concrete waste to ensure effective decontamination. In this study, the performance metrics of various Compton reconstruction algorithms were compared in order to identify the best strategy to estimate the internal radioactivity distribution in concrete waste during the decommissioning of NPPs. Four reconstruction algorithms, namely, simple back-projection, filtered back-projection, maximum likelihood expectation maximization (MLEM), and energy-deconvolution MLEM (E-MLEM) were used as Compton reconstruction algorithms. Subsequently, the results obtained by using these various reconstruction algorithms were compared with one another and evaluated, using quantitative evaluation methods. The MLEM and E-MLEM reconstruction algorithms exhibited the best performance in maintaining a high image resolution and signal-to-noise ratio (SNR), respectively. The results of this study demonstrate the feasibility of using Compton images in the estimation of the internal radioactive distribution of concrete during the decommissioning of NPPs.