• 제목/요약/키워드: Decision Cost

검색결과 1,968건 처리시간 0.029초

어류양식장 생산계획에 관한 연구 (Production planning in fish farm)

  • 어은양
    • 수산경영론집
    • /
    • 제46권3호
    • /
    • pp.129-141
    • /
    • 2015
  • Because land based aquaculture is restricted by high investment per rearing volume and control cost, good management planning is important in Land-based aquaculture system case. In this paper master production planning was made to decide the number of rearing, production schedule and efficient allocation of water resources considering biological and economic condition. The purpose of this article is to build the mathematical decision making model that finds the value of decision variable to maximize profit under the constraints. Stocking and harvesting decisions that are made by master production planning are affected by the price system, feed cost, labour cost, power cost and investment cost. To solve the proposed mathematical model, heuristic search algorithm is proposed. The model Input variables are (1) the fish price (2) the fish growth rate (3) critical standing corp (4) labour cost (5) power cost (6) feed coefficient (7) fixed cost. The model outputs are (1) number of rearing fish (2) sales price (3) efficient allocation of water pool.

A decision support system (DSS) for construction risk efficiency in Taiwan

  • Tsai, Tsung-Chieh;Li, Hsiang-Wen
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.249-255
    • /
    • 2018
  • Many studies in risk management have been focused on management process, contract relation, and risk analysis in the past decade, but very few studies have addressed project risks from the perspective of risk efficiency. This study started with using Fault Tree Analysis to develop a framework for the decision-making support system of risk management from the perspective of risk efficiency, in order for the support system to find risk strategies of optimal combination for the project manager by the trade-off between project risk and cost of project strategies. Comprehensive and realistic risk strategies must strive for optimal decisions that minimize project risks and risk strategies cost while addressing important data such as risk causes, risk probability, risk impact and risk strategies cost. The risk management in the construction phase of building projects in Taiwan upon important data has been analyzed, that provided the data for support system to include 247 risk causes. Then, 17 risk causes were extracted to demonstrates the decision-making support system of risk management from the perspective of risk efficiency in building project of Taiwan which could reach better combination type of risk strategies for the project manager by the trade-off between risk cost and project risk.

Case-Based Reasoning Cost Estimation Model Using Two-Step Retrieval Method

  • Lee, Hyun-Soo;Seong, Ki-Hoon;Park, Moon-Seo;Ji, Sae-Hyun;Kim, Soo-Young
    • 토지주택연구
    • /
    • 제1권1호
    • /
    • pp.1-7
    • /
    • 2010
  • Case-based reasoning (CBR) method can make estimators understand the estimation process more clearly. Thus, CBR is widely used as a methodology for cost estimation. In CBR, the quality of case retrieval affects the relevance of retrieved cases and hence the overall quality of the reminding capability of CBR system. Thus, it is essential to retrieve relevant past cases for establishing a robust CBR system. Case retrieval needs the following tasks to obtain appropriate case(s); indexing, search, and matching (Aamodt and Plaza 1994). However, the previous CBR researches mostly deal with matching process that has limits such as accuracy and efficiency of case retrieval. In order to address this issue, this research presents a CBR cost model for building projects that has two-step retrieval process: decision tree and nearest neighbor methods. Specifically, the proposed cost model has indexing, search and matching modules. Features in the model are divided into shape-based and scale-based attributes. Based on these, decision tree is established for facilitating the search task and nearest neighbor method was utilized for matching task. In regard to applying nearest neighbor method, attribute weights are assigned using GA optimization and similarity is calculated using the principle of distance measuring. Thereafter, the proposed CBR cost model is developed using 174 cases and validated using 12 test cases.

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권1호
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발 (Developing a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipment)

  • 이주현;배기호;안선응
    • 산업경영시스템학회지
    • /
    • 제41권2호
    • /
    • pp.24-31
    • /
    • 2018
  • As a system complexity increases and technology innovation progresses rapidly, leasing the equipment is considered as an important issue in many engineering areas. In practice, many engineering fields lease the equipment because it is an economical way to lease the equipment rather than to own the equipment. In addition, as the maintenance actions for the equipment are costly and need a specialist, the lessor is responsible for the maintenance actions in most leased contract. Hence, the lessor should establish the optimal maintenance strategy to minimize the maintenance cost. This paper proposes two periodic preventive maintenance policies for the leased equipment. The preventive maintenance action of policy 1 is performed with a periodic interval, in which their intervals are the same until the end of lease period. The other policy is to determine the periodic preventive maintenance interval minimizing total maintenance cost during the lease period. In addition, this paper presents two decision-making models to determine the preventive maintenance strategy for leased equipment based on the lessor's preference between the maintenance cost and the reliability at the end of lease period. The structural properties of the proposed decision-making model are investigated and algorithms to search the optimal maintenance policy that are satisfied by the lessor are provided. A numerical example is provided to illustrate the proposed model. The results show that a maintenance policy minimizing the maintenance cost is selected as a reasonable decision as the lease term becomes shorter. Moreover, the frequent preventive maintenance actions are performed when the minimal repair cost is higher than the preventive maintenance cost, resulting in higher maintenance cost.

건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석 (An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost)

  • 이성구;신현인
    • 한국건축시공학회지
    • /
    • 제7권1호
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

메가프로젝트 원가 자료 분석에 관한 연구 (A Study of cost data modeling for Megaproject)

  • 지성민;조재경;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.253-256
    • /
    • 2009
  • To the success of the megaproject including various and complex facilities, it is needed to establish a database system. Developments in data collection, storage and extracting technology have enabled iPMIS to manage various and complex information about cost and time. Especially, when we consider that both the go and no go decision in feasibility, Cost is an important and clear criteria in megaproject. Thus, Cost data modeling is the basis of the system and is necessary process. This research is focus on the structure and definition about CBS data which is collected from sites. We used four tools which are Function Analysis in VE, Casual loop Diagram in System Dynamics, Decision Tree in Data-mining, and Normalization in SQL to identify its cause and effect relationship on CBS data. Cost data modeling provide iPMIS with helpful guideline.

  • PDF

다목적의사결정 기법을 이용한 품질비용의 최적화에 관한 연구 (Optimization of Quality Cost using Multiobjective Decision Making Method)

  • 송종대
    • 산업경영시스템학회지
    • /
    • 제16권28호
    • /
    • pp.21-29
    • /
    • 1993
  • We want to know the interrelationship among the four components of Total Quality Cost. So that we will be able to say what changes will occur in one when another is changed Even though the relationship among the component Cost is as varied as there are companies keeping such cost systems, existence of some general pattern is hypothesized at least among similar companies doing similar business or producing similar products. The purpose of this study is to drive Optimum Quality Cost on base of the result of the quality cost analyses in N business, after multiple regression model with failure cost as dependent variable is established. Vector Optimization (VOP) method were used for solving multiobjective decision ploblem.

  • PDF

Application of Cost-Volume-Profit Analysis in Decision-Making by Public Universities in Vietnam

  • LE, Oanh Thi Tu;TRAN, Phong Thi Thu;TRAN, Thuan Van;NGUYEN, Cong Van
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권6호
    • /
    • pp.305-316
    • /
    • 2020
  • This paper aims to examine the application of cost-volume-profit (CVP) analysis by public universities in Vietnam. In the context where Vietnam is gradually transferring financial autonomy to public universities, the conduct of a CVP analysis in relation to these public universities is particularly urgent. Research samples were collected in 2018 and 2019 by surveying Vietnamese public universities. After collection, the data is synthesized by excel file, conformity check, data cleansing and data analysis on SPSS software by tools such as Frequency statistics, price statistics, and means. The results show that: (1) universities used the CVP analysis in decision-making, (2) information related to the CVP analysis used for decision-making by administrators remained simplistic and lacked cost-control details, and (3) the application of the CVP analysis by university administrators for decision-making was neither comprehensive nor coordinated. The findings also show that, given the current conditions in Vietnam, increasing the governance in public universities is essential, as is contributing to reducing costs, increasing universities'income, providing the best service to students, and improving the quality of training. The study calls for the flexible application of the CVP analysis, which will provide information to help managers at Vietnamese public universities make the best decisions.

에지 및 상대적 RMD 비용을 고려한 HEVC 고속 화면내 부호화 모드 결정 방법 (Edge and Relative RMD Cost based Fast Intra Prediction Mode Decision in HEVC)

  • 권대혁;최해철
    • 전자공학회논문지
    • /
    • 제51권10호
    • /
    • pp.154-163
    • /
    • 2014
  • 본 논문에서는 HEVC를 위한 고속 화면내 부호화 모드 결정 방법을 제안한다. 제안방법은 화면내 부호화의 RMD(Rough Mode Decision) 및 RDO(Rate-Distortion Optimization) 과정에서 고려하는 각 후보 수를 줄여 화면내 부호화 과정에서의 복잡도를 감소시킨다. RMD가 고려하는 후보 수를 줄이기 위하여 영상의 에지 방향성 및 강도를 활용하며, RDO가 고려하는 후보수를 줄이기 위하여 상대적 RMD cost 차이를 이용한다. 실험결과에서는 제안방법이 약 0.79% BD-rate의 부호화 손실만으로 26.81%의 부호화 복잡도를 감소시켰음을 보인다.