Choi, Jaisung;Lee, Jong-Hak;Chong, Sang Min;Cho, Won Bum;Kim, Sangyoup
International Journal of Highway Engineering
/
v.15
no.6
/
pp.103-111
/
2013
PURPOSES : Previous Speed Profile reflects the patterns of speeds in sections of tangents to curves in the roads. However these patterns are uniform of speeds and Acceleration/Deceleration. In oder to supplement these shortcomings. this study made a new profile which can contain factors of Acceleration/Deceleration through theories of Previous Speed Profiles. METHODS : For sakes, this study developed the speed prediction model of Rural Multi-Lane Highways and calculated Acceleration/Deceleration by appling a Polynomial model based on developed speed prediction model. Polynomial model is based on second by second. Acceleration/Deceleration Profile is developed with the various scenarios of road geometric conditions. RESULTS : The longer an ahead tangent length is, The higher an acceleration rate in curve occurs due to wide sight distance. However when there are big speed gaps between two curves, the longer tangent length alleviate acceleration rate. CONCLUSIONS : Acceleration/Deceleration Profile can overview th patterns of speeds and Accelerations/Decelerations in the various road geometric conditions. Also this result will help road designer have a proper guidance to exam a potential geometric conditions where may occur the acceleration/deceleration states.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.17
no.6
/
pp.54-66
/
2018
In this study, vehicle speeds at acceleration and deceleration lanes of rest areas for drowsy drivers were investigated to analyze effects of acceleration and deceleration lane lengths, grades and curve radius. In addition, we used VISSM to analyze proper lengths of rest area's acceleration and deceleration lanes. Several VISSIM scenarios with different lengths of acceleration and deceleration lane were constructed. Through VISSIM simulation, we collected individual vehicle speed data to analyze speed changes by different lengths of acceleration and deceleration lanes. As a result of the vehicle speed change investigation, grades and curve radii of the rest area affected the speed, most of all lengths of acceleration and deceleration lane showed a great effect on the vehicle speed. In the case of short lengths of acceleration and deceleration lane, speed variation among vehicles was significant. If the deceleration lane length is short, the vehicle enters a state in which the speed is not sufficiently reduced, and if the acceleration lane length is short, the vehicle enters a state in which the speed is not sufficiently accelerated showing high risks of conflicts and accidents. It is recommended that 245m length of deceleration lane and 370m length of acceleration lane should be installed at least to secure safety and manage conflicts relevantly.
PURPOSES: To analyze the specific factors of drivers behaviors that amount of cause the greenhouse gas emissions per vehicle. METHODS: Drivers behaviors at intersections are analyzed on the conditions of acceleration and deceleration. RESULTS : First, it is resulted greenhouse gas emissions per vehicle is produced more at intersections than at the main lines of highway. Second, it is resulted that the average speed, the average acceleration rate and the maximum speed are three major factors to produce greenhouse gas per vehicle in acceleration sections. Third, it is resulted that rapid deceleration 20m before entering intersections is the major factor to produce greenhouse gas per vehicle in deceleration sections. CONCLUSIONS: At intersections, sudden acceleration and deceleration is not good for greenhouse gas emissions. Thus, and the average speed, the average acceleration rate and the maximum speed are the chosen as factors to be controlled for drivers' behavior to reduce vehicles' greenhouse gas at intersections.
Proceedings of the Korean Society of Precision Engineering Conference
/
2002.05a
/
pp.382-386
/
2002
The tapping is machining process that makes a female screw on the parts to be assembly together. It is used for the high-speed tapping machine with synchronizing function for the high productivity. This paper describes the development of the ultra high-speed tapping machine with 10,000rpm. The key factors in the tapping speed are the acceleration/deceleration velocity and the synchronizing errors between the spindle motor and feeding motor. To minimizing acceleration/deceleration time, the low inertia spindle with synchronous built-in servo motor is developed. To minimizing synchronizing errors, the tapping cycle algorithm under open architecture CNC environment is optimized. The developed tapping machine has 0.13sec/10,000rpm in acceleration/deceleration time and the synchronizing error below 4.0%. It has 0.55sec for cycle time of one female screw, M3 tap, 2 times depth of tap diameter.
If a wind speed decreases during inertial control of a wind turbine generator (WTG), the rotor speed might decrease below the minimum operating limit, which is called over-deceleration (OD). When OD occurs, inertial control should be disabled and then the output power of a WTG significantly decreases. This significant power reduction causes a subsequent frequency drop. This paper proposes the stepwise inertial control to prevent OD when a wind speed decreases during inertial control. To do this, the proposed scheme changes the additional power output based on the rotor speed. The performance of the proposed scheme is investigated using an EMTP-RV simulator. The results show that the proposed inertial control scheme prevent OD even when the wind speed decreases during inertial control.
Journal of the Korean Society for Precision Engineering
/
v.19
no.11
/
pp.221-227
/
2002
Tapping is a machining process that makes a female screw on parts to be assembly together. Recently, as the number of small and compact products increases the radius of tap as small as 1 mm is not unusual and more accurate tapping is needed. In complying with those needs, some high-speed tapping machines with synchronizing function have been developed. This paper describes the development of an ultra high-speed tapping machine up to 10,000rpm. The key factors in the tapping speed are the acceleration/deceleration and the synchronizing errors between spindle motor and fred motor. To minimize the acceleration/deceleration time, a low inertia spindle with a synchronous built-in servo motor was developed. To minimize the synchronizing errors, the tapping cycle algorithm was optimized on an open architecture CNC. The developed tapping machine has the acceleration/deceleration time of 0.13sec/10,000rpm for rigid tapping and the synchronizing error below 4.4%. The cycle time for tapping a female screw of M3 and depth 2 times diameter was 0.55sec.
I study for design criteria and research about Interchange diverging area of express highway and freeway, the most recent, at interchange diversion of express highway and freeway, design criteria and researches are focus on safety guarantee a point of view movement dynamics of vehicle and road geometric as to transition section, deceleration section, curve radius, nose section, outflow angle etc, that is, design criteria and research of Interchange diverging area have not consider a point of view movement dynamics of vehicle and road geometric and driver, so that I will be focus characteristic of runing speed on trasion curve. and I will consider vehicle running speed characteristics and study problem of Interchange diverging area design criteria. For this study, First, analysis meaning about theory of now design criteria, Second, look at vehicle running speed and traffic accident characteristics of Interchange diverging area, Third, propose new deceleration transition curve design method get along vehicle running speed characteristics of Interchange diverging area. new deceleration transition curve design method put out new outcoums, that is, I definite cause to safety new deceleration transition curve design method better than pressently, used design criteria of Interchange diverging area, especially, deceleration transition curve design criteria produced good result in the running speed 50km/h, 40km/h, that is inertia better than inertia of present used design criteria. and deceleration transition curve is extended better than present transition curve criteria, so that new deceleration transition curve design method safety is good better than the past method safety.
Proceedings of the Korean Society of Precision Engineering Conference
/
2000.11a
/
pp.184-187
/
2000
This paper describes action of synchronous error between z axis and spindle axis on rigid tapping. Because rigid tapping cuts the threads synchronizing the movement of z axis to spindle rotation, synchronous error between z axis and spindle is very important. Increase of synchronous error degrades the accuracy of thread and crushes the tap in worst case. So we developed the realtime measurement system of synchronous error in order to know the action of synchronous error on rigid tapping. In result, we have known that synchronous error was increased according to rise of spindle speed and z axis speed. And because the cutting torque(M3-30Ncm∼M10-300Ncm) on rigid tapping are less than maximum motor torque(3500Ncm), it specially doesn't affect the synchronous error. The most important parameter which has affected the increase of synchronous error was acceleration/deceleration time. On worst case, spindle motor was tripped because of the excess of synchronous error. Because the acceleration/deceleration time ocuupies the most of the total cutting time, in order to move on the high speed rigid tapping, the acceleration/deceleration time of spindle must be remarkably reduced.
Journal of the Korean Society of Manufacturing Technology Engineers
/
v.7
no.5
/
pp.15-28
/
1998
Recently may investigations have been studied on the high-speed machining by using machine tools. A CNC machine tool makes some tool path errors caused by software acceleration/deceleration. The faster a cutting feedrate is, the bigger the tool path errors are. Some known methods reduce these kinds of errors, but they make the total cutting time increased. This paper presents a feed-forward algorithm that can be generated by distorting the original tool path, and reduces the tool path errors and the total cutting time. The algorithm to generate a new tool path is represented as following; 1)calculating each distance of software acceleration/deceleration between two adjacent blocks, 2) estimating the distorted distance which is the adjacent-ratio-constant(k1, k2) multiply the distance of software acceleration/deceleration, 3) generating a 3-degree Bezier curve approximating the distorted tool path, 4) symmetrically transforming the Bezier curve about the intersection point between two blocks, and 5) connecting the transformed Bezier curve with the original tool path. The algorithm is applied to FANUC 0M. The study is to promote the high-precision machining and to reduce the total cutting time.
PURPOSES : Ambiguous decision on whether rural or urban area for road design can increase the construction cost and restrict the land use of surrounding area. However, administrative classification on rural and urban area is not directly related to road design because of this classification is not based on the engineering viewpoint, so method which can explain the road design context is required. METHODS : Method which enables to identify the area for road design is suggested based on the deceleration expected to be experienced by drivers who use the road section concerned. Deceleration rate corresponding to the area such as rural or urban suggested in Road Design Guideline is used as the criteria to identify the area by comparing this value with the estimated deceleration rate at the road section concerned. Speed profile method is utilized to derive the deceleration rate, and speed estimation way for reflecting both road geometry and intersection is suggested using stopping sight distance concept. RESULTS : The procedure of the method application is suggested, and the design example utilizing the method is provided. CONCLUSIONS : The method is expected to be used to identify the area for road design with engineering viewpoint, and design consistency among the roads with similar driving environment can be made.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.