• Title/Summary/Keyword: Dam construction upstream

Search Result 79, Processing Time 0.022 seconds

Operation of an Experimental Watershed for River Water Quality Management (하천수질관리를 위한 시험유역의 운영)

  • Kim, Sang Ho;Choi, Hung Sik
    • Journal of Wetlands Research
    • /
    • v.7 no.1
    • /
    • pp.81-91
    • /
    • 2005
  • We construct the hydrology-water quality monitoring system which can watch the variations of river flow and water quality in real time. We also construct the river management system through the hydrology-water quality monitoring system that can observe water quality and its variations for preparing for the accident of river pollution. The Gyecheon basin which is located at the upstream of Heoengseong dam is selected as an experimental watershed for the system construction. The real time monitoring system for getting more correct hydrological and water quality data consists of 3-rainfall gauge station, 3-water level gauge station, and 1-water quality gauge station. We intend that the data such as rainfall, water level, velocity, flow, and water quality will be collected and we try that the data may be used for practical and other purposes.

  • PDF

A Study on the Site Selection Method for the Creation of a Flood Buffer Section Considering the Nature-based Solution - Case Study from Upstream of Daecheong Dam to Downstream of Yongdam Dam (자연성기반기술의 홍수완충구간 조성을 위한 입지 선정 방법에 관한 연구 - 대청댐 상류부터 용담댐 하류구간 사례 연구)

  • Ji, Un;Jang, Eun-kyung;Bae, Inhyeok;Ahn, Myeonghui;Bae, Jun
    • Ecology and Resilient Infrastructure
    • /
    • v.9 no.3
    • /
    • pp.131-140
    • /
    • 2022
  • The magnitude and frequency of extreme floods are increasing owing to the effects of climate change. Therefore, multipurpose flood management techniques incorporating nature-based solutions have been introduced to mitigate the limitations of flood management and river design methods relying on existing observation data. Nature-based solutions to prepare for such extreme flooding events include ways to retreat the embankment, expand the floodplain, and reduce flood damage. To apply these technologies, adopting appropriate location selection methods based on various evaluation factors, such as flood damage reduction effects, sustainable ecological environments, river connectivity, and physical channel structure enhancements, should be prioritized. Therefore, in this study, the optimal location for implementing the multipurpose floodplain construction project was determined by selecting the location of the floodplain expansion with objectivity in the river waterfront area upstream of Daecheong Dam to downstream of Yongdam Dam. Through the final location determination, the Dongdaeje and Jeogokje sections were included in the optimal location considering both flood damage reduction and water environment improvement.

A Study on the Efficiency Improvement of Existing Pool-and-Weir Type Fishway in Namgang Weir (남강수중보의 기존 전면월류형 계단식 어도의 효율성 개선에 관한 연구)

  • Lee, Hyeong-Rae;Kim, Ki Heung;Park, Ho Chul
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.17 no.2
    • /
    • pp.61-71
    • /
    • 2014
  • A river fishway is a hydraulic structure enabling fish to overcome stream obstructions such as dams and weirs. The main aim of this paper is to investigate the collectibility of upstream-migrating fishes and hydraulic problems in pool-and-weir type fishway which has been established for upstream-migration at Namgang weir in the downstream of Namgang dam, and to grope for improvement measures which pool-and-weir type fishway can be switched to pool-and-partial weir type fishway through hydraulic field experiment. Exsisting fishway had problems which upstream-migrating fishes can not take a rest due to the seiche and vortex phenomena in pools and migrate to upstream because of height difference in entrance pool. In order to prevent hydraulically the seiche and vortex phenomena and establish rest area for fishes in each pool, we carried out hydraulic field experiments. In the fishway, it was to improve pool-and-weir into pool-and-partil weir, to decrease the height difference in entrance pool, and to reduce oriffice velocity of each pool. Also, we investigated fishes collectibility of after improving fishway for 6 days in September 2013. To resolve chronic problems(seiche-vortex phenomena and rest area for fishes), as weirs were remodeled into partial weir only which central part of weirs was part of non-overflow weir, we confirmed results that pool-and-weir type fishway could be switched to efficient pool-and-partial weir type fishway with relatively simple construction and low cost. Type-B which has the closed oriffices and the parts of non-overflow has the ideal conditions, but this conditions are limited to fishway of Namgang weir used in this study. Representative Ice-habor type fishway is pool-and-partial weir type fishway which has together parts of overflow and oriffices, and has excellent ability of upstream-migration. To switch from pool-and-weir type fishway to pool-and-partial weir type fishway, the size of oriffice has to be regulated by the discharge of fishway and the dimension on parts of non-overflow and overflow in weirs. Entrance pool is important facility which upstream-migrating fishes have to not only be collect but also charge with energy. In this study, entrance-pool is temporary and roughly-built, but fishes gather together more than the case of no entrance-pool. In the case of fishway which was protruded to downstream, as entrance of fishway turns toward or parallels to weir, the collectibility of fishway was excellent by attraction water.

Analysis of Erosion Risk in a Catchment using Projected Rainfall Data and Spatial Rainfall-Erosion Model

  • Felix, Micah Lourdes;Kim, Joocheol;Choi, Mikyoung;Jang, Ning;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.316-316
    • /
    • 2021
  • Erosion in a watershed is one of the main sources of sediment inflow in dams. While sediment management practices can be performed to reduce and manage sedimentation in reservoirs, managing the sediment inflow before it reaches the reservoir should also be consider. The accurate location of areas with high erosion and deposition rates should be determined in order to propose an appropriate sediment management procedure such as the construction of check dams. In this study, the projected rainfall from HadGEMRA-3 for RCP 8.5, was used in C-SEM, a distributed rainfall-erosion model, to determine the projected spatial erosion patterns in Cheoncheon catchment, which is located in the upstream part of Yongdam Dam.

  • PDF

Analysis of Streamflow Characteristics of Boryeong-dam Watershed using Global Optimization Technique by Infiltraion Methods of CAT (CAT 모형의 침투해석방법별 전역최적화기법을 이용한 보령댐 유역의 유출 특성 변화 분석)

  • Park, Sanghyun;Kim, Hyeonjun;Jang, Cheolhee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.412-424
    • /
    • 2019
  • In this study, the changes of the streamflow characteristics of the watershed were analysed depending on the infiltration methods of CAT. The study area, Boryeong-dam watershed located in Chungcheongnam-do area, has been suffered from severe drought in recent years and stabilized regarding on the storage rate through efforts such as constructing a channel connecting the upstream of Boryeong-dam from the downstream of the Geum river. In this study, the effects of soil infiltration parameters on the watershed streamflow characteristics were analyzed by the infiltration methods of CAT such as Rainfall Excess, Green&Ampt and Horton. And the parameter calibrations were conducted by SCEUA-P, a global optimization technique module of the PEST, the package for parameter optimization and uncertainty analysis, to compare the yearly variations of soil parameters for infiltration methods of CAT. In addition, the streamflow characteristics were analyzed for three infiltration methods by applying three different scenarios, such as applying calibrated parameters for every years to simulate the model for each years, applying calibrated parameters for the entire period to simulate the model for entire period, and applying the average value of yearly calibrated parameters to simulate the model for entire period.

Dataset of Long-term Monitoring on the Change in Hydrology, Channel Morphology, Landscape and Vegetation Along the Naeseong Stream (I) (내성천의 수문, 하도 형태, 경관 및 식생 특성에 관한 장기모니터링 자료 (I))

  • Lee, Chanjoo;Kim, Dong Gu;Ji, Un;Kim, Jisung
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.1
    • /
    • pp.23-33
    • /
    • 2019
  • Naeseong Stream is a sand-bed river that flows through the northern area of Gyeongbuk province. It is characterized by dynamic sandy bedforms developed in response to the seasonal hydrological fluctuation and by its unique riverine landscape called "white river." However, changes including construction of Yeongju Dam from 2010 and the extensive vegetation establishment around 2015 occurred along the Naeseong Stream. This paper aims to analyze climate, hydrology, and water quality as factors and to examine the possibility of channel changes accordingly. The second least precipitation during the last 60 years happened in 2015, which led to the lowest peak discharge in 50 years. The sediment characteristics of Naeseong Stream were not significantly different along the upstream and downstream reaches, but it was confirmed that annual minimum water level of the stream decreased continuously regardless of the dam construction. This suggests that intermittent drought and change in water quality are likely to provide favorable conditions for riparian vegetation establishment and the resulting physical changes have affected riverbed degradation. Therefore, it is necessary to conduct diversified monitoring in connection with river vegetation change in order to analyze the causes of river changes.

Numerical analysis of the morphological changes by sediment supply at the downstream channel of Youngju dam (댐 하류하천에서 유사공급에 의한 하도의 지형변화 수치모의 분석(영주댐을 중심으로))

  • Kang, Ki-Ho;Jang, Chnag-Lae;Lee, Gi Ha;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.8
    • /
    • pp.693-705
    • /
    • 2016
  • In this study, the effects of sediment supply on the downstream of a large dam are investigated using a numerical model. The model simulation shows a good agreement with laboratory experiment results of sediment transport and diffusion from sediment pulses. The water surface changes from the various sediment bed elevations are also simulated using the model. The site which has a relatively stiff bed slope and meandering of a channel is selected as an appropriate location for sediment supply because of its shear stress enough to supply the sediment downstream. The model simulation shows the decrease of channel bed elevation through the simulation period with time. The well-deposition of sediment supplied from the downstream of dam is found in the location where the flow rate is relatively low. A bed relief index is increased with time and it is relatively greater in downstream compared to upstream. The channel bed variability increases as flow rate increases with a greater bed relief index. The results of this study demonstrate the importance of increasing water discharge of a large dam to increase the dynamic of channel bed and thus to enhance the efficiency of channel bed restoration by sediment supply.

Potential damage assessment of inland wetlands by topsoil erosion (표토침식에 따른 내륙습지 훼손 가능성 평가)

  • Kim, Seongwon;Jeong, Anchul;Lee, Daeeop;Lee, Giha
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.521-531
    • /
    • 2020
  • The purpose of this study is to suggest a quantitative assessment of wetland damage considering the effects of topsoil erosion and deposition from rainfall. In the Cheoncheon Basin located upstream of the Yongdam Dam, 16 wetlands are located, but the lacustrine and small palustrine wetland were analyzed for possible damage to erosion and deposition. As a result of applying typhoon events in 2002 and 2003, the sediment load from the upper basin was the highest at 2.30% (22,548 ㎥) of low water capacity. The average sediment load in the mountain areas was found to be 0.03% of the low water capacity, and it was analyzed to be less damaging than the lacustrine with relatively large watershed. as a result of the model, the lacustrine wetland, where a large area is used as agricultural land, shows a high probability of sediment yield, so it is highly likely to damage the wetland by topsoil erosion.

Pollutant Removal Efficiency of Sedimentation Basin at Inlet of an Irrigation Reservoir (저수지 내 유입부 침강지의 수질정화 효율)

  • Jang, Jeong-Ryeol;Choi, Sun-Hwa;Kwun, Soon-Kuk
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.473-479
    • /
    • 2004
  • A sedimentation basin (SB) at the inlet of an irrigation reservoir which was constructed using an auxiliary dam was monitored to evaluate its pollutant removal efficiency. Water sampling at three points, i.e., inflow stream, upstream and downstream of the reservoir, were taken 5 times before and after the construction of the SB in 1999 and 2003, respectively. No significant water quality variations in inflow stream were observed during these periods. The COD, T-N, T-P and SS removal efficiencies were 38, 24, 35 and 49%, respectively. The results indicated that those removal efficiencies significantly increased during the rainy season and COD removal efficiency, especially, was higher than others studies. The scale of SB in this study was rational as aspects of pollutant removal efficiency and hydraulic detention time. And it is recommended that SB, at inlet of an reservoir, should be constructed as completely separated structure from reservoir water body and having SAR Index from 0.7% to 1.0%.

An Assessment of Flow Characteristic and Riverbed Change by Construction of Hydraulic Structure (수리구조물 설치에 따른 흐름특성 및 하상변동 연구)

  • Kwak, Jaewon;Jin, Hwansuk;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.19 no.4
    • /
    • pp.542-550
    • /
    • 2017
  • The estimations of flow characteristics and river-bed erosion or sedimentation are very important for hydraulic structure design, floodplain management, and especially, river management. The objective of the study is therefore to estimate the change of flow characteristics and river-bed change due to a hydraulic structure construction. With 11.65 km study area of the Geum River which are located in downstream of Daecheong Dam, flow characteristics and river-bed change were estimated based on the RMA2 and SED2D model. As the result of the study, the increase of river-bed sedimentation in upstream and river-bed erosion in downstream were occurred by the construction of hydraulic structure.