• Title/Summary/Keyword: Dam collapse

Search Result 48, Processing Time 0.02 seconds

A Study on the Development of Rapidly Hardening Grouting Method for the Effective Filling in the Underground Cavity (지하공동의 효율적 충전을 위한 급결 충전 그라우트공법개발에 관한 연구)

  • Kim, Soo-Lo;Kim, Tae-Heok;Shin, Dong-Chun;Kwon, Hyun-Ho
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.534-544
    • /
    • 2009
  • The collapse of the underground cavity can cause the abrupt local subsidence of the ground surface. It can be hazardous to the stability of road and building for human activity. Therefore it is necessary to develop reinforcement methods for the filling of the underground cavity. This study was executed to improve the material quality and systems to fill the calcium-aluminate mineral $(C_{12}A_7)$ environmentally, and minimize the loss of filling materials for the steep underground cavity. Filling material which was developed in this study is composed of rapid hardening material and additives. The developed material had rapid hardening and non-separation ability in the water cavity condition, so it made the effective underground dam in the cavity with prevention of material loss when it was poured in the water cavity. Results of heavy metal leaching test for environmental assessment showed that it was environmentally suiTable material for the filling in the mine cavity.

Development of 2D inundation model based on adaptive cut cell mesh (K-Flood) (적응적 분할격자 기반 2차원 침수해석모형 K-Flood의 개발)

  • An, Hyunuk;Jeong, Anchul;Kim, Yeonsu;Noh, Joonwoo
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.10
    • /
    • pp.853-862
    • /
    • 2018
  • An adaptive cut-cell grid based 2D inundation analysis model, K-Flood, is developed in this study. Cut cell grid method divides a grid into a flow area and a non-flow area depending the characteristics of the flows. With adaptive mesh refinement technique cut cell method can represent complex flow area using relatively small number of cells. In recent years, the urban inundation modeling using high resolution and fine quality data is increasing to achieve more accurate flood analysis or flood forecasting. K-Flood has potential to simulate such complex urban inundation using efficient grid generation technique. A finite volume numerical scheme of second order accuracy for space and time was applied. For verification of K-Flood, 1) shockwave reflex simulation by circular cylinder, 2) urban flood experiment simulation, 3) Malpasset dam collapse simulation are performed and the results are compared with observed data and previous simulation results.

An Experimental Study on the Collapse Phase of a River Leeves(II) -Effect of the Soil Properties and Compactness (하천제방 붕괴 양상의 실험적 연구(II) - 축조재료 및 다짐도의 영향)

  • Lee, Jong-Tae;Lee, Sang-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.2
    • /
    • pp.155-167
    • /
    • 2001
  • The effects of bank crest width, slope steepness, soil properties, and soil compactness on the characteristics of levee breach due to overlfow were investigated through a series of experiments. Generally, the major factors influencing the breach phenomenon are compactness, soil properties. crest width, and slope steepness, in that order. Using proper soil, and ensuring enough compactness in bank construction are very essential for extending breach duration and reducing peak overflow ranges for the values of breach duration, breach width, width-to-depth ratio, and side slope of the breach section, proposed by Singh, MacDonald and Fread based on the field data for earth dam breaks were reasonable. We found that those criteria could also be applied to the phenomenon of levee breaching.

  • PDF

Estimation of sediment deposition rate in collapsed reservoirs(wetlands) using empirical formulas and multiple regression models (경험공식 및 다중회귀모형을 이용한 붕괴 저수지(습지) 비퇴사량 추정)

  • Kim, Donghyun;Lee, Haneul;Bae, Younghye;Joo, Hongjun;Kim, Deokhwan;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.23 no.4
    • /
    • pp.287-295
    • /
    • 2021
  • As facilities such as dam reservoir wetlands and agricultural irrigation reservoir wetlands are built, sedimentation occurs over time through erosion, sedimentation transport, and sediment deposition. Sedimentation issues are very important for the maintenance of reservoir wetlands because long-term sedimentation of sediments affects flood and drought control functions. However, research on resignation has been estimated mainly by empirical formulas due to the lack of available data. The purpose of this study was to calculate and compare the sediment deposition rate by developing a multiple regression model along with actual data and empirical formulas. In addition, it was attempted to identify potential causes of collapse by applying it to 64 reservoir wetlands that suffered flood damage due to the long rainy season in 2020 due to reservoir wetland sedimentation and aging. For the target reservoir, 10 locations including the GaGog reservoir located in Miryang city, Gyeongsangnam province in South Korea, where there is actual survey information, were selected. A multiple regression model was developed in consideration of physical and climatic characteristics, and a total of four empirical formulas and sediment deposition rate were calculated. Using this, the error of the sediment deposition rate was compared. As a result of calculating the sediment deposition rate using the multiple regression model, the error was the lowest from 0.21(m3km2/yr) to 2.13(m3km2/yr). Therefore, based on the sediment deposition rate estimated by the multi-regression model, the change in the available capacity of reservoir wetlands was analyzed, and the effective storage capacity was found to have decreased from 0.21(%) to 16.56(%). In addition, the sediment deposition rate of the reservoir where the overflow damage occurred was relatively higher than that of the reservoir where the piping damage occurred. In other words, accumulating sediment deposition rate at the bottom of the reservoir would result in a lack of acceptable effective water capacity and reduced reservoir flood and drought control capabilities, resulting in reservoir collapse damage.

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.

Modeling of Dam collapse using PMF and MCE conditions (PMF 및 MCE조건을 적용한 댐 붕괴 모델링)

  • Lee, Dong Hyeok;Jun, Kye Won;Lee, Byung Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.368-368
    • /
    • 2020
  • 최근 초대형화 되어 나타나고 있는 이상홍수와 지진 등에 의한 저수지 붕괴와 같은 대규모 비상상황 발생으로 하류지역 주민의 생명과 재산의 피해가 발생하고 있다. 국내의 경우 1996년 이후로 지속적으로 발생하고 있는 이상홍수로 인해 1998년에는 40개,1999년에는 5개의 소규모 저수지가 붕괴되었으며 최근 2013년과 2014년에도 저수지가 붕괴되는 상황이 발생했다. 댐붕괴의 원인은 구조물의 자연적 노화, 극심한 강우나 홍수, 지진, 제체전도, 파이핑, 침윤발생, 월류 및 파랑 등에 의한 자연적 상황 등이 요인이 될 수 있으며, 시공결함, 사고 또는 전쟁과 같은 인위적인 요인으로 발생할 수도 있다. 과거에 설계 및 시공기술이 부족하였거나 경제적인 이유로 부실하게 건설되어 있는 댐이 세계적으로 산재되어 있어 잠재적인 위험을 상당수 내재하고 있는 실정이다. 본연구는 댐의 점진적인 파괴에 의해 발생하는 유출수문곡선을 구하고 파괴의 성질을 예측 및 홍수파를 수리학적으로 추적하기위해 BREACH 모형과 DAMBRK 모형을 사용했으며 극한홍수(PMF)조건과와 최대지진발생(MCE)조건을 적용하여 원주시 관내 저수지 붕괴 모의 시나리오를 구축했다. 저수지 붕괴에 따른 유출수문곡선을 유도하기 위해서 본 연구에서는 기존의 EAP보고서 자료를 참고하여 붕괴지속시간, 붕괴부 평균폭, 붕괴부 측벽면 경사의 변화에 따라 다양한 모의를 수행함으로써 발생되는 붕괴부 유량 수문곡선을 도출하여 각각의 조건들이 붕괴파 형성에 미치는 영향에 대한 분석을 실시하였다. 그 결과 저수지의 붕괴시 첨두유출량에 민감한 영향을 주는 인자는 붕괴지속시간과, 붕괴부 평균폭으로서 이들 값이 붕괴유출량 변화에 많은 영향을 주는 것으로 나타났다. 최대지진발생(MCE)조건 해석결과 홍수류의 범람으로 인해 홍수파가 하류측으로 진행할수록 완만히 감소하며, 하천 중·상류부 인근 제내지로 홍수류의 범람이 발생하는 것으로 검토되었으며, 극한홍수(PMF)조건 해석결과 최대지진발생(MCE)조건과 같이 홍수파가 하류측으로 진행할수록 완만히 감소하는 특성을 보이며, 하천 전체 구간에서 인근제내지로 홍수류의 범람이 발생하는 것으로 검토되었다. 본 연구는 침수구역 피해규모 산정 및 비상대처계획도를 작성시 기초데이터가 되어 상황별 피해예상지역에 대해 응급행동요령, 주민대피계획비상대처계획을 수립하여 지역 주민생활에 안정을 기여하고자 한다.

  • PDF

Development and assessment of pre-release discharge technology for response to flood on deteriorated reservoirs dealing with abnormal weather events (이상기후대비 노후저수지 홍수 대응을 위한 사전방류 기술개발 및 평가)

  • Moon, Soojin;Jeong, Changsam;Choi, Byounghan;Kim, Seungwook;Jang, Daewon
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.11
    • /
    • pp.775-784
    • /
    • 2023
  • With the increasing trend of extreme rainfall that exceeds the design frequency of man-made structures due to extreme weather, it is necessary to review the safety of agricultural reservoirs designed in the past. However, there are no local government-managed reservoirs (13,685) that can be discharged in an emergency, except for reservoirs over a certain size under the jurisdiction of the Korea Rural Affairs Corporation. In this case, it is important to quickly deploy a mobile siphon to the site for preliminary discharge, and this study evaluated the applicability of a mobile siphon with a diameter of 200 mm, a minimum water level difference of 6 m, 420 (m2/h), and 10,000 (m2/day), which can perform both preliminary and emergency discharge functions, to the Yugum Reservoir in Gyeongju City. The test bed, Yugum Reservoir, is a facility that was completed in 1945 and has been in use for about 78 years. According to the hydrological stability analysis, the lowest height of the current dam crest section is 27.15 (EL.m), which is 0.29m lower than the reviewed flood level of 27.44 (EL.m), indicating that there is a possibility of lunar flow through the embankment, and the headroom is insufficient by 1.72 m, so it was reviewed as not securing hydrological safety. The water level-volume curve was arbitrarily derived because it was difficult to clearly establish the water level-flow relationship curve of the reservoir since the water level-flow measurement was not carried out regularly, and based on the derived curve, the algorithm for operating small and medium-sized old reservoirs was developed to consider the pre-discharge time, the amount of spillway discharge, and to predict the reservoir lunar flow time according to the flood volume by frequency, thereby securing evacuation time in advance and reducing the risk of collapse. Based on one row of 200 mm diameter mobile siphons, the optimal pre-discharge time to secure evacuation time (about 1 hour) while maintaining 80% of the upper limit water level (about 30,000 m2) during a 30-year flood was analyzed to be 12 hours earlier. If the pre-discharge technology utilizing siphons for small and medium-sized old reservoirs and the algorithm for reservoir operation are implemented in advance in case of abnormal weather and the decision-making of managers is supported, it is possible to secure the safety of residents in the risk area of reservoir collapse, resolve the anxiety of residents through the establishment of a support system for evacuating residents, and reduce risk factors by providing risk avoidance measures in the event of a reservoir risk situation.

Soil Quality Assessment for Environmentally Sound Agriculture in the Mountainous Soils; Analysis of Sediment Data and Suggestion of Best Management Practices (산지에서의 환경보전형 농업을 위한 토양의 질 평가;유사자료의 분석과 최적영농방법의 제안)

  • Choi, Joong-Dae;Park, Ji-Sung;Kim, Jeong-Je;Yang, Jae-E;Jung, Yeong-Sang;Yun, Sei-Young
    • Korean Journal of Environmental Agriculture
    • /
    • v.19 no.3
    • /
    • pp.201-205
    • /
    • 2000
  • Eleven runoff $plots(3{\times}15\;m)$ were built on a sloping field of a high plateau in Kangwon Province, Korea. The plots were treated with different tillage, residue covers and fertilizers, corn and potato were cultivated, and sediment discharge was measured from the plots for 3 years. Agricultural management practices were monitored around the plots to develop adequate best management practices. The least sediment occurred from the plots with no-till and 100% residue cover $(corn,\;0.1{\sim}2.2\;t/ha/year)$ and with contour tillage and vinyl sheet cover plots $(potato,\;0.1{\sim}0.2\;t/ha/year)$. The largest sediment was measured from the plots with up-and-down till and no cover ($11{\sim}33$ and $16{\sim}31\;t/ha/year$ from corn and potato plots, respectively). The type of organic and commercial fertilizers seemed not to affect sediment discharge. Sediment discharge from contour plots were largely dependent on the collapse of ridges due to the flush of water stored in furrows. The sediment discharge from contour corn and potato plots with no residue cover was $10{\sim}27$ and $16{\sim}24\;t/ha/year$, respectively. No-till with residue cover, vinyl cover for tuber crops, construction of furrow dam, frost heave research, furrow and ridge tillage with furrow dam after tuber crop harvest, limited stalk harvest of row crops, use of winter cover crops, and other common best management practices were recommended to minimize the sediment discharge from a high plateau sloping land culture.

  • PDF