• Title/Summary/Keyword: Dam Discharge

Search Result 401, Processing Time 0.026 seconds

Morphological Change in Seabed Surrounding Jinwoo-Island Due to Construction of New Busan Port - Qualitative Evaluation through Numerical Simulation (부산신항 건설이 진우도 주변 해저지형 변화에 미치는 영향 - 수치실험을 통한 정성적 평가)

  • Hong, Namseeg
    • Journal of Ocean Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.192-201
    • /
    • 2018
  • In this study, a qualitative evaluation of the morphological changes in the seabed surrounding Jinwoo-Island due to the construction of the new Busan port were determined through a numerical simulation. Various scenarios for the discharge of the Nakdong river estuary dam and construction stage of the new Busan port were established and utilized for an indirect and qualitative investigation through simulation using the numerical model implemented in this study. It was concluded through a qualitative study that the morphological changes in the seabed surrounding Jinwoo-Island were typical estuary seabed changes due to the discharge of the Nakdong river estuary dam and waves from the open sea. The effects from the construction of the new Busan port were relatively small.

Development of a Decision Support System for Turbid Water Management through Joint Dam Operation

  • Kim, Jeong-Kon;Ko, Ick-Hwan;Yoo, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.31-39
    • /
    • 2007
  • In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.

  • PDF

Hydraulic and structural considerations of dam's spillway - a case study of Karkheh Dam, Andimeshk, Iran

  • Faridmehr, Iman;Jokar, Mohammad Javadi;Yazdanipour, Mohammadreza;Kolahchi, Ali
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.1
    • /
    • pp.1-17
    • /
    • 2019
  • Preserving reservoir safety has recognized to be important for the public where a vast majority of dams are located upstream of greatly populated cities and industrialized areas. Buckling, floatation and cavitation have caused failure in the spillway gates and conveyance features during past catastrophic events; showed their vulnerability and need for regular inspection along with reviewing design calculations to ensure the spillway meet current design standards. This paper investigates the hydraulic and structural consideration of dam's spillway by evaluating the data of Karkheh Dam's. Discharge capacity, flood routings and cavitation damage risk were main features for hydraulic considerations where hydrostatic and hydrodynamic forces and stability conditions were considered in structural considerations.

Effect of Chungju Dam Operation for Flood Control in the Upper Han River (충주댐 방류에 따른 댐 상하류 홍수위 영향 분석)

  • Kim, Sang Ho;Kim, Ji-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.537-548
    • /
    • 2013
  • In this study, the hydraulic channel routing model was constructed to analysis the effect of flood control with the operation of Chungju Dam for 2006 flood. Study area was divided with up- and downstream of Chungju Dam in the upper Han River of Paldang Dam. The model was calibrated and verified for the flood event of 1995-2008. The effects of flood control of Chungju Dam were compared with the simulation results without the dam, and the rising effects of stage in the main observation stations were analyzed by the variation of released dam discharge. Consequently, the operation of Chungju Dam for 2006 flood was performed properly, but the effects of flood control of Chungju Dam were so focused in downstream of the dam that institutional complement was demanded to reduce the flood damage in the upper region of the dam. The limit of decision rule of downstream stage in the backwater region of dam was analyzed to solve the problem, and the decision rule of downstream stage was proposed to consider the discontinuity between the backwater region of dam and the design flood of upper stream. The proposed rule will be used to design the reduction of flood damage in upper stream of dam and to apply the analysis of region for flood damage.

Impact of a Flushing Discharge from an Upstream Dam on the NH3-N Concentrations during Winter Season in Geum River (상류 댐 플러싱 방류가 금강의 겨울철 암모니아성 질소 농도 저감에 미치는 효과분석)

  • Chung, Se Woong;Kim, Yu-kyung
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.6
    • /
    • pp.609-616
    • /
    • 2005
  • A high ammonia nitrogen ($NH_3-N$) concentration has been recursively observed every winter season in Geum River, which hindered chemical treatment processes at a water treatment plant. A flushing discharge from Daecheong Dam was often considered to dilute $NH_3-N$, but information on the quantitative effect of flushing on the downstream water quality was limited. In this study, the impact of a short-term reservoir flushing on the downstream water quality was investigated through field experiments and unsteady water quality modeling. On November 22, 2003, the reservoir discharge was increased from $30m^3/sec$ to $200m^3/sec$ within 6 hours for the purpose of the experiment. The results showed that flushing flow tends to reduce downstream $NH_3-N$ concentrations considerably, but the effectiveness was limited by flushing amount and time. An unsteady river water quality model was applied to simulate the changes of nitrogen concentrations in response to reservoir flushing. The model showed very good performance in predicting the travel time of flushing flow and the effect of flushing discharge on the reduction of downstream $NH_3-N$ concentrations at Maepo and Geumnam site, but a significant discrepancy was observed at Gongju site.

Numerical Simulation of Sand Bars downstream of Andong Dam (안동댐 하류 하천에서 사주의 재현 모의)

  • Jang, Chang-Lae;Shimizu, Yasuyuki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4B
    • /
    • pp.379-388
    • /
    • 2010
  • This study examined the physical effects on the river changes downstream of Andong dam and simulated the reproduction of sand bars and the geomorphic changes numerically. The river bed downstream of Aandong dam and Imha dam was decreased and the mean diameter of bed materials was increased, and the number of lower channels was increased. The vegetated area was slightly increased after Andong dam construction. Moreover, the area was abruptly increased after Imha dam construction. The bankfull discharges was estimated to 580 $m^3/s$ after the dams construction and 2,857 $m^3/s$ before the dams. A flood mitigation safety by the dams construction considering return period was increased to 5 to 10 times. As a result of meso-scale regime analysis by using banfull discharge, the regime between single bars and multiple row bars before the dams construction was changed to completely the regime of multiple row bars after the dams. The numerical simulation results showed that the sand bars and lower channels were developed before the dams, and braided river was developed after the dams. This meant that the patterns of sand bars was changed by variable discharge due to the dams construction.

Impact of Estuarine Dams on the Estuarine Parameter Space and Sediment Flux Decomposition: Idealized Numerical Modeling Study

  • Figueroa, Steven M.;Lee, Guan-hong;Chang, Jongwi;Lagamayo, Kenneth D.;Jung, Nathalie W.;Son, Minwoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.276-276
    • /
    • 2022
  • Estuarine dams are constructed for securing freshwater resources, flood control, and improving upstream navigability. However, their impact on estuarine currents, stratification, and sediment fluxes is not well understood. To develop a general understanding, an idealized modeling study was carried out. Tide and river forcing were varied to produce strongly stratified, partially mixed, periodically stratified, and well-mixed estuaries. Each model ran for one year. Next, the models were subject to the construction of an estuarine dam and run for another year. Then, the pre- and post-dam conditions were compared. Results showed that estuarine dams can amplify the tidal range and reduce the tidal currents. The post-dam estuaries tended to be a salt wedge during freshwater discharge and a bay during no freshwater discharge. For all estuaries, the estuarine turbidity maximum moved seaward, and the suspended sediment concentrations tended to decrease. In terms of sediment flux mechanisms, the estuarine dam increased the seaward river runoff for cases with strong river, and increased the landward tidal pumping for cases with strong tides.

  • PDF

Prediction of Water Quality of Youngwol Multipurpose Dam Using FEMWASP (FEMWASP 모형을 이용한 영월 다목적댐의 장래 수질 예측)

  • Kim, Joon Hyun;Han, Young Han
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.443-452
    • /
    • 1998
  • The future water quality of Youngwol Dam was predicted using FEMWASP. In the this study, point and non-point source in the basin was investigated in detail, and future pollutant loading was computed by various prediction technique. The water quality of 29 sites was analyzed over four seasons. FEMWASP was used to predict future water quality of Youngwol lake and downstream of proposed dam. Future water quality of Youngwol lake was predicted to configure eutrophication status, management criteria was suggested to minimize the pollution problems coming from future eutrophication. Discharge rate of dam was decided as 30CMS to conserve the water quality, and overall design of dam was changed.

  • PDF

The Estimation of the Uplift Pressure and Seepage Discharge under Gravity Dam: Development of a 3-D FDM Model in Heterogeneous Media (중력댐 하부 침투류에 의한 양압력과 누수량 산정 -비균질 3차원 FDM 모형의 개발 및 적용-)

  • Kim, Sang-Jun
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1221-1234
    • /
    • 2013
  • The purpose of this study is to suggest the methodology for the computation of uplift pressure and discharge of the seepage flow under gravity dam. A 3-dimensional FDM model is developed for this purpose and this model can simulate the saturated Darcian flow in heterogeneous media. For the verification of the numeric model, test simulation has been executed and the mass balance has been checked. The error does not exceed 3%. Using the developed model, The uplift pressure and seepage flow discharge under gravity dam has been calculated. The uplift pressure shows the similar pattern, comparing with the result of flow-net method. As the length of grout curtain increases, the uplift pressure decreases linearly, but the seepage flow discharge shows the non-linear decreasing pattern. The coefficients of the formulas in the dam-design criteria have been analysed, and ${\alpha}=1/3$ corresponds to the value when the length of curtain grout is 70% of the aquifer height. The uplift pressure near the pressure relief drain has the big curvature vertically and horizontally. The developed model in this study can be used for the evaluation of the effects of seepage flow under gravity dam.

Analysis of Hydraulic Characteristics Upstream of Dam and in Spillway Using Numerical Models (수치모형을 이용한 댐 상류 및 여수로 수리현상 해석)

  • Kim, Young-Han;Oh, Jung-Sun;Seo, Il-Won
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.761-776
    • /
    • 2003
  • Numerical models were employed to investigate the hydrodynamics of water flow in the lake behind a dam and the spillway where supercritical flows and negative pressures are likely to occur. In this study, 2-D model, RMA2 was employed to examine the upstream flow pattern and 3-D CFD model, FLUENT was used to evaluate the three-dimensional flow in the approaching region and flow distributions in the spillways and discharge culverts. The bathymetry and the details of structures were carefully taken into consideration in building the models. The results from applying the 2-D model for the planned Hantan River Dam show that large eddies, the velocity of which reaches up to 1 m/s are occurring in several places upstream of the dam. That means that the 2-D numerical model could be utilized to investigate the two-dimensional flow patterns after the construction of a dam. Three-dimensional numerical results show that the approach flow varies depending on stages and discharge conditions, and velocities at spillways, discharge culverts, and sediment flushing tunnels are differently distributed. The velocity distributions obtained from the numerical model and a hydraulic model at the centerline of spillways 100 m upstream of the dam show reasonably similar results. It is expected that 2-D and 3-D numerical models ate useful tools to help optimize the dam design through investigating the flow patterns in the spillway and at the upstream of the dam, which is not always feasible in hydraulic modeling.