• Title/Summary/Keyword: Daily load curve

Search Result 67, Processing Time 0.029 seconds

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds (부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Kim, Eunkyoung;Ryu, Jichul;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

A Study on the Estimation Method of Daily Load Curve for the Optimization Design and Economic Evaluation of Stand-alone Microgrids Based on HOMER Simulation in Off-Grid Limiting the Supply of Electricity (제한급전하는 오프그리드의 독립형 마이크로그리드 최적 설계 및 경제성 평가를 위한 일부하곡선 추정 방안에 관한 연구)

  • Nam, Yong-Hyun;Youn, Seok-Min;Kim, Jung-Hoon;Hwang, Sung-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.68 no.1
    • /
    • pp.27-35
    • /
    • 2019
  • There is a growing interest in various microgrid solutions that supply electricity 24 hours a day to off-grid areas where are not connected with the main grid, and Korea has many positive effects by constructing overseas microgrids as a country operating the emission trading scheme. Since it is not clear how to obtain load curves that is one of the inputs of the HOMER used to design a microgrid optimization plan, or it is necessary to examine whether electricity is supplied to the peak load level of the areas where have not received the electricity benefits from the viewpoint of the demand management, a methodology should be developed to know the load composition ratio and the shape of the daily load curve. In this paper, the relative coefficient and average load information for each load group obtained from the survey are used besides peak load and total average load. A mathematical model is proposed to derive the load composition ratio in the form of a Quadratic Programming and the load forecasting is performed using simple linear regression with future indicators. The effectiveness of the proposed method is confirmed for the Philippine island region supported by Korea Energy Agency and the Asian Development Bank.

Relationship between the Flow data on the Unit Watersheds and on the Stream Flow Monitoring Network (수질오염총량관리 단위유역 유량자료와 하천유량 측정망 자료의 연계성 분석)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.55-65
    • /
    • 2013
  • It is very difficult to apply stream flow data directly to the management of Total Maximum Daily Loads because there are some differences between the unit watershed and the stream flow monitoring network in their characteristics such as monitoring locations and its intervals. Flow duration curve can be developed by linking the daily flow data of stream monitoring network to 8 day interval flow data of the unit watershed. This study investigated the current operating conditions of the stream flow monitoring network and the flow relationships between the unit watershed and the stream flow monitoring network. Criteria such as missing and zero value data, and correlation coefficients were applied to select the stream flow reference sites. The reference sites were selected in 112 areas out of 142 unit watersheds in 4 river basins, where the stream flow observations were carried out in relatively normal operating conditions. These reference sites could be utilized in various ways such as flow variation analysis, flow duration curve development and so on for the management of Total Maximum Daily Loads.

Methodology for the Identification of Impaired Waters Using LDC for the Management of Total Maximum Daily Loads (오염부하지속곡선(LDC)을 이용한 수질오염총량관리 단위유역 목표수질 달성여부 평가방법)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.5
    • /
    • pp.693-703
    • /
    • 2012
  • Load Duration Curve(LDC) is a useful tool for analyzing water quality characteristics under various stream flow conditions. This study investigated the methods to identify impaired waterbodies in the assessment of water quality goal attainment by using LDC for the management of Total Maximum Daily Loads (TMDLs). Three methods were proposed. Non-typical regime exclusion method is a method to exclude water quality observations in the non-typical extreme flow conditions in order to minimize the influence of non-ordinary water quality. Flow regime weighted average method is a method to calculate weighted mean water quality instead of arithmetic mean in order to consider water characteristics properly on stream flow regime in addition to the effect of Non-typical regime exclusion method. Load exceeded interval comparison method is a method to compare the intervals between the attained and non-attained load duration periods on the LDC. The assessment of water quality goal attainment can be performed more reasonably and precisely considering water quality variations on stream flow conditions by applying these proposed methods.

Development and Application of Coliform Load Duration Curve for the Geum River (금강에 대한 대장균 부하 지속곡선의 개발 및 적용)

  • Kim, Geonha;Yoon, Jaeyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.5
    • /
    • pp.516-519
    • /
    • 2005
  • An useful protocol coiled load duration curve methodology to estimate contaminant loading to a river on an exceedance probability scale was developed in this research. The technique was further applied to estimate total coliform loading to the Geum River, using the daily mean flow rate and total coliform concentration data during January, 1996 and July, 2004 for the Gongju where an automated monitoring station is located. Drought flow of the Gongju (=50.3 cms) was equivalent to 40% on an exceedance probability scale. Load duration curve for total coliform loading at the Gongju was constructed. Standard duration curve was constructed with the water quality criteria for the class 2 (total coliform concentration = 1000 MPN/100 mL). By plotting load duration curve with standard duration curve, it could be revealed that water quality do not meet the desired water quality for 47% on an exceedance probability scale. If linearity between flow rate and coliform concentration is assumed, it can be interpretated that water quality exceeds desired criteria when average mean flow rate is over 51 cms.

Evaluation of Daily Load Curve by taking into consideration PEVs Charging·Discharging Station (전기 자동차의 충·방전 장소를 고려한 도시별 일부하 곡선 산출)

  • Choi, Sang-Bong;Lee, Jae-Jo;Sung, Back-Sub
    • Journal of Energy Engineering
    • /
    • v.29 no.3
    • /
    • pp.64-73
    • /
    • 2020
  • This paper presented a methodology for calculating daily load curves per city by taking into account the charging/discharging location of electric vehicle. In other words, this is the daily load curve calculation algorithm by city, which takes into account the charging/discharging location of electric vehicles, so that the impact of loads generated by charging/discharging of electric vehicles on the power grid can be easily understood in certain cities. Specifically, in accordance with the PEVs share scenario, the PEVs discharge power was calculated to reflect both the characteristics of the arriving vehicle in the morning and the SMP plan after establishing a assumption that the electric vehicle arrived at work in the morning and the electric vehicle arrived at home in the afternoon for each of the charging/discharging locations, that is, work and home, of electric vehicles in the city. After calculating the daily load curve for each charging/discharging power type for the PEVs charging strategy, which takes into account both the characteristics of the vehicle arriving at home in the afternoon and the TOU fare system, it was analyzed by comparing the impact assessment on the grid by adding the existing load.

A Daily Maximum Load Forecasting System Using Chaotic Time Series (Chaos를 이용한 단기부하예측)

  • Choi, Jae-Gyun;Park, Jong-Keun;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.578-580
    • /
    • 1995
  • In this paper, a method for the daily maximum load forecasting which uses a chaotic time series in power system and artificial neural network. We find the characteristics of chaos in power load curve and then determine a optimal embedding dimension and delay time, For the load forecast of one day ahead daily maximum power, we use the time series load data obtained in previous year. By using of embedding dimension and delay time, we construct a strange attractor in pseudo phase plane and the artificial neural network model trained with the attractor font mentioned above. The one day ahead forecast errors are about 1.4% of absolute percentage average error.

  • PDF

Development of Load Duration Curve Methodology for TMDL Evaluation (오염총량평가를 위한 부하지속곡선 개발 및 적용)

  • Kang, Du-Kee;Kang, Soon-Ku;Kim, Sang-Dan;Shin, Hyun-Suk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.652-656
    • /
    • 2007
  • The major streams in South Korea have established the TMDL(Total Maximum Daily Loads) regulation for just 4 years. Traditional concepts in water quality management in South Korea are based upon the selection of a design streram flow which is 10-year averged flow exeedance probability 75%(Q275). That is, a single flow value based upon average long term flow conditions is chosen for application in dilution calculations, permit design, water quality modeling, etc. While these TMDLs seems to satisfy the requirement of the target water quality regulations, they have contributed little to any watershed/waterbody assessment and restoration plans. These types of TMDLs do little to characterize the problems the TMDLs are intended to address. For TMDLs to be more beneficial in the assessment and implementation process, TMDLs should reflect adequate water quality across flow conditions rather than at a single flow value such as average daily flow. In this paper, we developed LDC (load duration curve) methodology for theevaluation of Korean TMDL evaluation based on watershed scaled, physically based on SWAT(Soil and Water Assessment Tool) model.

  • PDF

Overload Analysis of Distribution Systems make use of PEVs Charging Modeling (전기 자동차의 충전 모델링을 이용한 배전계통 과부하 분석)

  • Choi, Sang-Bong;Lee, Jae-Jo;Sung, Back-Sub
    • Journal of Energy Engineering
    • /
    • v.29 no.3
    • /
    • pp.74-85
    • /
    • 2020
  • This paper presents an algorithm that evaluated the overload influence by bus upon the distribution system by calculating the daily load curve of PEVs charging by bus based on the daily charging patterns of PEVs according to PEVs penetration scenarios. The proposed algorithm calculates the number of PEVs to estimate the number of households by bus; the probability density function of the charging start time of PEVs, considering driving characteristics of PEVs and the daily load curve of PEVs charging by bus considering battery characteristics according to PEVs penetration scenarios. To verify the evaluation of the overload influence by bus on the distribution system in terms of the proposed algorithm, the cases were reviewed on the target bus(apartment and detached houses) among the feeders of the distribution systems at Dongtan new-town in Korea.

Application of the Load Duration Curve (LDC) to Evaluate the Rate of Achievement of Target Water Quality in the Youngsan · Tamjin River Watersheds (부하지속곡선(LDC)을 이용한 영산강 · 탐진강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Cheong, Eunjeong;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.349-356
    • /
    • 2016
  • Total Maximum Daily Loads (TMDLs) System has been used to improve water quality in the Youngsan·Tamjin river basin since 2004. The Basic Policy of TMDLs sets up the standard flow based on the average dry condition or mid-range flow during the last 10 years. However, Target Water Quality (TWQ) assessment on TMDLs has been used to evaluate water quality through eight-day intervals over 36 times a year. The results for allocation evaluation and target water quality evaluation were different from each other in the same unit watershed during the first period. In order to improve the evaluation method, researchers applied Load Duration Curve (LDC) to evaluate water quality in nine unit watersheds of the Youngsan·Tamjin river basin. The results showed that achievement rates of TWQ assessment with the current method and LDC were 67~100% and 78~100%, respectively. Approximately 11% of the achievement rates with use of LDC were higher than those with use of the current method. In conclusion, it is necessary to review the application of the LDC method in all Four Major River Watersheds.