• Title/Summary/Keyword: DWOPER model

Search Result 18, Processing Time 0.022 seconds

Numerical Model for Flood Inundation Analysis in a River(I) : GIS Application (하천 홍수범람해석을 위한 수치모형의 개발(I) : GIS와의 연계해석)

  • Lee, Hong-Rae;Han, Geon-Yeon;Kim, Sang-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.415-427
    • /
    • 1998
  • FIAS (Flood Inundation Analysis System) using Arc/Info is developed and applied to the South Han River basin. The DWOPER model is revised and expanded to handle simultaneous multiple overtopping and/or breaking and to estimate the inundation depth and extents. The model is applied to an actual levee overtopping case, which occurred on August 23~27, 1995 in the South Han River. Stage hydrographs inside and outside of the levee are compared, then inundated discharges from overbank spilling are computed. The Graphic User Interface is developed with AML(Arc/Info Macro Language). Two-and three-dimensional inundation maps by Arc/Info are presented. The computed inundation extends agree with observations in terms of inundation depth and flooded area. Keywords : River, Floodwave, Flood Inundation, Geographic Information System.

  • PDF

A Research on the Daily Runoff Simulation for the Downstream Region of Multipurpose Dams in the Han River (漢江水系 다목적댐 下流 日 流出 模擬 硏究)

  • Lee, Sang-Ho;Kim, Yeong-Seong;Sin, Yong-No
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.6
    • /
    • pp.575-585
    • /
    • 1997
  • A daily runoff system was constructed to support decision making for water use in the downstream region of multipurpose dams in the Han River. The daily runoff system used the modified model from NWSRFS by Tabios III et al. (1986), and potential evapotranspiration was computed from Penman equation. DWOPER was used for channel routing. While the North Han River is the main river reach in the channel routing system, the South Han River and the Soyang River became tributaries. The rainfall-runoff model was calibrated and verified for five subbasins. Daily runoffs were simulated with the hydrometeorological data in 1986 and1990. The simulations were performed from April to November, and the sum of computed discharges for seven or thirty days were compared with actual releases of the downstream dams. It showed the average absolute errors of 8.7 ~31.6%. The sum of total discharges were 10% or less. While stage errors were produced by 0.5 m or less at Yoju station in the ease of simulation from April to August in 1986, the errors kept under 0.2 m since September. In the simulation for 1990, we compared two simulation results. One is produced from real internal and downstream boundary conditions and the other is one from internal and downstream boundary conditions fixed arbitrarily. The two cases showed similar results.

  • PDF

Improvement of QUAL2E Model using Nonuniform Flow Analysis (부등류해석을 이용한 QUAL2E 모형의 개선)

  • Kim, Sang Ho;Choi, Hyun Sang
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.6
    • /
    • pp.1144-1150
    • /
    • 2006
  • Recently, as water pollution accidents in rivers have increased, there is an increased interest in water quality forecast with accurate simulation. QUAL2E model, widely used for water quality analysis, uses the same hydraulic characteristics, such as depth and velocity, in a reach. The flow of the river is changed by various hydraulic constructions or by topography in a real river channel. In this study, a hydraulic connection module is developed to consider flow variations of river channels in QUAL2E model. The module uses the simulations results of non-uniform flow of a 1-D hydraulic model such as DWOPER or HEC-RAS. The improved QUAL2E model with this module was applied to a downstream section of Paldang Dam on the Han River. The results show the variation of water quality very well in a reach where flowing vary abruptly, like the Jamsil submerged weir.

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Development of Numerical Model for Flood Inundation Analysis in a River with GIS Application

  • Lee, Hong-Rae;Han, Kun-Yeun;Kim, Sang-Ho;Choi, Hyun-Sang
    • Korean Journal of Hydrosciences
    • /
    • v.10
    • /
    • pp.59-72
    • /
    • 1999
  • FIAS(Flood Inundation Analysis System) using Arc/Info is developed and applied to the Namhan River basin. The DWOPER model is revised and expanded to handle simultaneous multiple overtopping and/or breaking, and to estimate the inundated depth and extents. The model is applied to an actual levee overtopping case, which occurred on August 23∼27, 1995 in the Namhan River. Stage hydrographs inside and outside of the levee are compared, then inundated discharges from overbank spilling are computed. The Graphic User interface is developed with AML. Two- and three-dimensional inundation map by Arc/Info are presented. The computed inundation extends agree with observations in terms of inundated depth and flooded area. The FIAS is useful for the analysis of flood hazards and preparation of inundation map for river basins.

  • PDF

Improvement of Hydraulic Parameters for QUAL2E Model (QUAL2E 모형에 대한 수리인자의 개선)

  • Kim, Sang-Ho;Lee, Eul-Rae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.436-440
    • /
    • 2006
  • 하천에 대한 수질해석을 위해 범용적으로 사용되는 QUAL2E 모형은 대상구간에 유사한 수리 특성을 가지는 구간(reach)을 설정하여 주어진 유량에 대해 동일한 수심과 유속을 가지도록 구성되어 있다. 하지만 실제 자연하도에서는 여러 가지 수공구조물이나 지형변화로 인해 흐름변화가 매우 다양하게 발생하고 있다. 본 연구에서는 범용적으로 사용되고 있는 DWOPER 모형이나 HEC-RAS 모형과 같은 1차원 수리해석모형의 부등류 모의결과를 QUAL2E 모형에서 활용함으로써 실제 하천에서 발생하는 국부적인 흐름특성을 수질해석에 반영할 수 있는 수리연계모듈을 개발하였으며, 이를 한강의 팔당댐 하류구간에 대해 적용하였다.

  • PDF

Application of Hydrodynamic Model for Flood Analysis in Namhan River (남한강 홍수해석을 위한 동수역학 모형의 적용)

  • Kim, Sang-Ho;Hwang, Shin-Bum;Kim, Keuk-Soo;Kim, Ji-Sung;Park, Sang-Geun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.592-596
    • /
    • 2009
  • 남한강 유역의 홍수 방어능력 검토와 홍수방어대책 강구에 필요한 동수역학적 홍수추적 모형을 구축하였다. 남한강 유역을 충주댐을 중심으로 상 하류구간으로 나누어 수리학적 모형을 구축하였으며, 모형에 대한 보정을 위해 집중호우로 많은 홍수피해가 발생됐던 2006년 홍수사상과 2007년, 2008년 사상을 활용하였으며, 1990년부터 2005년까지 발생하였던 주요 홍수사상을 대상으로 모형의 검증을 실시하여 모형의 정확도를 검토하였다. 상 하류구간의 경계조건인 충주댐의 방류량과 저수위의 증가 및 감소에 따른 주요지점의 수위변화를 검토하였다.

  • PDF

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • v.5
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF