• 제목/요약/키워드: DBR Scheduling

검색결과 21건 처리시간 0.035초

안정된 수요를 갖는 생산라인에서 Kanban을 사용한 DBR 시스템 구현 (Implementation of DBR System with Kanban in a Production Line of Static Demand)

  • 고시근;김재환
    • 산업공학
    • /
    • 제15권1호
    • /
    • pp.99-106
    • /
    • 2002
  • A recently developed alternative to traditional production planning and control systems such as material requirement planning(MRP) and just-in-time(JIT) is the drum-buffer-rope(DBR). The DBR now being implemented in growing number of manufacturing organizations enables better scheduling and decision making on the shop floor. In implementing the DBR, however, an information system is usually needed to transmit the signal that runs from the constraint to material release. In this paper we propose a different mechanism to transmit the signal in the case that the demand of product is stable, which uses the well-known Kanban system. To improve the reality, this paper shows and example of the Kanban format, its operation, and calculation of the number of Kanbans.

직렬 생산라인에 대한 DBR 방식의 평가 (Evaluation of DBR system in a serial production line)

  • 고시근
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.470-475
    • /
    • 2002
  • An alternative to traditional production planning and control systems such as MRP and JIT is the drum-buffer-rope (DBR). Using the DBR system, companies can achieve a large reduction of work-in-process (WIP) and finished-goods inventories (FGI). significant improvement in scheduling performance, and substantial earnings increase. The purpose of this paper is to analyze the effect of the DBR system in a serial production line. Using Markov process, we modeled a DBR system with three stages. For the model developed we analyze the system characteristics and then present an optimization model for system design. The system performance is also analyzed through sensitivity analysis.

  • PDF

DBR 기반의 APS 시스템 상세 설계 (A Detailed Design for DBR Based APS System)

  • 최정길;김수진;주정민;정선화;정남기
    • 산업공학
    • /
    • 제14권4호
    • /
    • pp.348-355
    • /
    • 2001
  • This paper suggests a detailed design of APS(Advanced Planning & Scheduling) system using the DBR (Drum-Buffer-Rope) which is a finite capacity scheduling logic of TOC(Theory of Constraints). Our design is composed of four modules; Network, Buffer, Drum and Subordination. The Network module defines the Product Network which is built from BOM and routings. The Buffer module inserts the Buffers into the Product Network. The Drum module describes detail procedures to create Drum Schedule on the CCR(Capacity Constraint Resource). The Subordination module synchronizes all non-constraints to the constraints by determining the length of Rope. This design documented by ARIS.

  • PDF

재투입공정 하에서 DBR 기법 적용 방안 및 효과분석 (An Application Method and Effect Analysis of the DBR(Drum-Buffer-Rope) Method Under the Re-entrant Process)

  • 양현준;정석재;윤성욱
    • 한국시뮬레이션학회논문지
    • /
    • 제29권1호
    • /
    • pp.57-69
    • /
    • 2020
  • DBR(Drum-Buffer-Rope)은 하나의 병목공정이 존재하는 생산라인을 드럼, 버퍼 그리고 로프로 구성하여 제약설비인 병목공정을 중심으로 효과적인 스케줄링을 수립하는 데 좋은 전략으로 알려져 있다. 하지만 최근 제품의 다양성이 증가되면서 공정의 복잡성이 높아지고, 자재 및 중간재의 재투입을 요구하는 공정이 많아지고 있다. 재투입 공정은 원자재가 완제품으로 생산될 때까지 동일한 설비에서 반복적으로 작업처리가 되어야 하므로 복잡한 작업환경을 가지게 된다. 본 연구는 기존의 흐름공정에서 우수한 성능을 보인 DBR 기반의 스케줄링 방법이 재투입이 있는 공정에서도 효과적으로 적용 가능한지 여부와 이를 위해서 추가적으로 검토되어야 할 전략들을 다루었다. 본 연구의 핵심은 재투입 공정에 DBR 방법을 적용하기 위하여 재투입 공정을 여러 개로 쪼개어 하나의 병목공정을 갖는 임의의 흐름공정(루프)으로 재구성한다는 점이다. 이러한 구조를 기반으로 본 연구에서는 두 가지 의사결정에 초점을 맞추어 생산 스케줄링 전략을 구성하였다. 첫째, 흐름공정마다 적정 수준의 재고수준과 안정적 생산성을 유지하기 위해 자재 투입시점과 적절한 투입량을 결정한다. 둘째는 각 공정별 상이한 작업 우선순위를 결정하는 방법이다. 본 연구는 실험을 위해 HP사의 TRC(Technology Research Center) 공정에 대한 시뮬레이션 모델을 설계하였고, DBR 기반 루프 스케줄링을 적용한 결과, cycle time의 감소 및 재공품재고의 루프 간 균형을 유지하는 것을 확인하였다.

제약이론을 활용한 업무프로세스의 효율적 실행 방법 (Efficient Execution Method for Business Process Management using TOC Concepts)

  • 이승현;배혜림;원형준;김훈태;강석호
    • 한국전자거래학회지
    • /
    • 제10권1호
    • /
    • pp.61-80
    • /
    • 2005
  • 업무프로세스관리(BPM) 시스템은 업무프로세스의 효율적인 실행, 통제 및 관리를 지원하는 소프트웨어 시스템으로서, 복잡한 프로세스를 자동화하고, 이를 효과적으로 관리하여 기업의 생산성 향상에 기여한다. 그러나, 상용시스템은 주로 프로세스의 자동화에 초점을 두고 있어 프로세스와 업무참여자 관점에서 효율적인 관리 방법을 제공하지 못하고 있다. 따라서, BPM 시스템은 프로세스 참여자와 전체 프로세스 효율성 향상의 관점에서 개선의 여지가 있다. 이에 본 논문에서는 업무프로세스를 보다 효율적으로 관리하는 새로운 방법을 제안한다. 제안한 방법은 업무참여자의 업무부하를 고려하여 전체 프로세스를 실행하는 방식으로서, 프로세스 참여자원 가운데 가장 큰 제약요소를 집중관리한다. 이러한 방식은 경영혁신이론으로 알려진 제약이론(Theory of Constraints)의 DBR (Drum-Buffer-Rope) 방법론을 기반으로 하고 있다. DBR 방법론을 활용하기 위해 우선, 업무프로세스와 DBR의 주적용모델의 차이점을 분석하고 업무프로세스에 적합한 드럼, 버퍼, 로프를 개발한다. 이를 토대로, 업무참여자의 업무부하와 프로세스 인스턴스 발생 패턴을 통제하는 BPM만의 DBR 방법론(BP-DBR, Business Process-DBR)을 제안한다. BP-DBR은 업무참여자의 업무환경과 전체프로세스의 효율성 개선에 기여할 것으로 기대한다. 이러한 기대효과를 증명하기 위해 기존 BPM의 프로세스 관리방법과 제안한 방법의 효과를 시뮬레이션 실험을 통해 비교한다.

  • PDF

주문형 생산에서의 실시간 납기 산정 (Real-time Delivery Estimation in Build-to-order Manufacturing)

  • 홍태영;강무진;박세형;이상봉
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.101-104
    • /
    • 2002
  • Leading companies have embraced the new economy with new and innovative BTO models. Instead of conventional company-oriented manufacturing scheduling, customer-oriented scheduling method attracts more and more attention. To evaluate the delivery of customer order in advance, the real production capacity as well as procurement lead time should be taken into account. This paper describes a quasi-real-time order delivery estimation system using TOC(Theory of Constraints) based scheduling method.

  • PDF

THE APPLICATION OF THEORY OF CONSTRAINT IN SCHEDULING

  • Tsung-Chieh Tsai;Min-Lan Young
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.902-907
    • /
    • 2005
  • This study was undertaken to develop a comprehensive scheduling method which applied the core concept(DBR) of TOC to PERT, and to combine Monte Carlo Simulation to revise the uncertainties of activities then to eliminate project duration uncertainty. Most of the project duration overlooks the fact that in spite of minimizing the project duration, the uncertainty of constrained resources still puts the reliability of project duration in jeopardy. For the contractor, however, the most important thing is to comply the project scheduling with the planning to reduce the uncertainty of the project activities, operational interaction and project duration. In order to demonstrate that the model can be used in construction project, the scheduling of a steel-structure project was used as a case study to verify the validity of this model.

  • PDF

시뮬레이션 방식을 이용한 리드 타임 개선 사례 연구 (A Case Study on Lead Time Improvement Using a Simulation Approach)

  • 노원주;심재훈
    • 산업경영시스템학회지
    • /
    • 제44권2호
    • /
    • pp.140-152
    • /
    • 2021
  • During the shift from gasoline vehicles to electric ones, auto parts manufacturing companies have realized the importance of improvement in the manufacturing process that does not require any layout changes nor extra investments, while maintaining their current production rate. Due to these reasons, for the auto part manufacturing company, I-company, this study has developed the simulation model of the PUSH system to conduct a process analysis in terms of production rate, WIP level, and logistics work's utilization rate. In addition, this study compares the PUSH system with other three manufacturing systems -KANBAN, DBR, and CONWIP- to compare the performance of these production systems, while satisfying the company's target production rate. With respect to lead-time, the simulation results show that the improvement of 77.90% for the KANBAN system, 40.39% for the CONWIP system, and 69.81% for the DBR system compared to the PUSH system. In addition, with respect to WIP level, the experimental results demonstrate that the improvement of 77.91% for the KANBAN system, 40.41% for the CONWIP system, and 69.82% for the DBR system compared to the PUSH system. Since the KANBAN system has the largest impacts on the reduction of the lead-time and WIP level compared to other production systems, this study recommends the KANBAN system as the proper manufacturing system of the target company. This study also shows that the proper size of moving units is four and the priority allocation of bottleneck process methods improves the target company's WIP and lead-time. Based on the results of this study, the adoption of the KANBAN system will significantly improve the production process of the target company in terms of lead-time and WIP level.

DBR 스케줄링을 이용한 공급체인에서의 전자 상거래 방안 연구 (A Study on Electronic Commerce in Supply Chain sing Drum-Buffer-Rope Scheduling)

  • 김효용;한영근
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.754-757
    • /
    • 2000
  • 인터넷을 이용한 사이버 거래가 빠른 속도로 증가함으로써 기업에게 있어 인터넷 쇼핑몰 구축은 더 이상 선택사항이 아닌 필수 사항이 되었다. 하지만 현재 사이버 거래 수준은 전통적 상거래 수준에 못 미칠뿐더러 거래 항목에 있어서도 매우 제한적인 것이 사실이다. 앞으로 사이버 거래는 계속적으로 증가하리라 전망되지만 제품의 특성 혹은 고객의 기호에 따라 전통적 상거래도 그 영역을 차지하며 함께 양립하여 발전할 것이다. 이에 본 연구에서는 기존의 상거래 시스템에 사이버 거래기능을 추가하는 모델을 제시한다. 먼저 지리적으로 멀리 떨어져 있는 유통망의 정보화를 위하여 인터넷 기술을 이용하고 공급체인(Supply Chain) 전체에 걸친 동기화를 위해 TOC(Theory of Constraint)의 DBR(Drum-Buffer-Rope) 스케줄링을 응용한다. 모든 생산 및 유통의 흐름 속도가 최종 분배 센타에 접수되는 고객의 요구에 따라 이루어지게 함으로써 공급체인 전체에 걸친 동기화를 이룰 수 있고 지속적인 버퍼 관리를 통하여서 재고의 절감은 물론 미출고의 발생도 최소화할 수 있다. 만약 분배 센타에 재고부족 현상이 일어날 경우에는 공급체인 상의 능력제약자원(Capacity Constraint Resource . CCR)을 찾아 개선 활동을 수행하며 공급체인의 흐름 속도를 능력제약자원에 맞추어 조절한다. 분배 센타에서 대리점 혹은 사이버 고객으로의 배송은 부분적 분할납품 Partial Transshipment : PT) 전략을 적용한다. 즉 각 분배 센타가 관리하는 수요지 중 인접한 지역을 부분적 분할납품 전략 적용 수요지로 선택하고 사이버 거래를 통해 생성된 물류가 부분적 분할납품 전략 적용 수요지에 분배되게 함으로써 각 분배 센타의 재고 완충역할을 수행하게 한다. 이에 따라 안전 재고 및 역 배송을 최소화 할 수 있을 뿐 아니라 미 출고로 인한 손실을 최소화하며 고객의 서비스를 일정하게 유지시킬 수 있을 것으로 기대된다.

  • PDF

TOC와 통계적 분석에 의한 플라스틱보트 제조공정 개선에 관한 연구 (A Study on the Improvement of Plastic Boat Manufacturing Process Using TOC & Statistical Analysis)

  • 윤건구;김태구;이동형
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.130-139
    • /
    • 2016
  • The purpose of this paper is to analyze the problems and the sources of defective products and draw improvement plans in a small plastic boat manufacturing process using TOC (Theory Of Constraints) and statistical analysis. TOC is a methodology to present a scheme for optimization of production process by finding the CCR (Capacity Constraints Resource) in the organization or the all production process through the concentration improvement activity. In this paper, we found and reformed constraints and bottlenecks in plastic boat manufacturing process in the target company for less defect ratio and production cost by applying DBR (Drum, Buffer, Rope) scheduling. And we set the threshold values for the critical process variables using statistical analysis. The result can be summarized as follows. First, CCRs in inventory control, material mix, and oven setting were found and solutions were suggested by applying DBR method. Second, the logical thinking process was utilized to find core conflict factors and draw solutions. Third, to specify the solution plan, experiment data were statistically analyzed. Data were collected from the daily journal addressing the details of 96 products such as temperature, humidity, duration and temperature of heating process, rotation speed, duration time of cooling, and the temperature of removal process. Basic statistics and logistic regression analysis were conducted with the defection as the dependent variable. Finally, critical values for major processes were proposed based on the analysis. This paper has a practical importance in contribution to the quality level of the target company through theoretical approach, TOC, and statistical analysis. However, limited number of data might depreciate the significance of the analysis and therefore it will be interesting further research direction to specify the significant manufacturing conditions across different products and processes.