• 제목/요약/키워드: DB construction

검색결과 607건 처리시간 0.029초

A Study on Construction and Utilization Plan of Underground Spatial Information DB for Earthquake Disaster Prevention (지진방재를 위한 지하공간정보 DB 구축 및 활용 방안 연구)

  • Kim, Soogyeom;Jang, Yonggu;Kim, Changkyu;Kang, Injoon
    • Journal of the Korean GEO-environmental Society
    • /
    • 제14권9호
    • /
    • pp.49-56
    • /
    • 2013
  • Looking at the changes in the earthquake of 33 years of South Korea, earthquake in the magnitude of 3.0 or stronger have been conducted about nine times a year on average, and the epicenter of the earthquake is moving towards the inland from the coast. As the possibility of earthquakes increase, it is time to require utilization of underground space integrated information for earthquake disaster prevention. But, now the data related to the characterization of the ground and geology in the areas weak against earthquakes is insufficient, so we need to collect new geology and the ground survey data on nationwide scale and have to establish earthquake disaster prevention plans through the joint use of the existing underground space information. In this study, we determined the scope of construction of underground space DB information that is needed for earthquake disaster prevention, presented the construction plan of DB static and dynamic information of underground space. It also suggested the utilization of underground space scheme information for built earthquake disaster prevention. The underground space information for earthquake disaster prevention that was built through determining the scope and constructing, planning the utilization of underground space information is supposed to used as DB of the integrated management system of underground space and steep slopes information for steep slopes and earthquake prevention by Emergency Management Agency.

The Welding/Welding History DB Construction of OLP System For the Multi-Layer Welding on the Thick Steel Plates In Low Speed Diesel Engines (대형 저속 디젤엔진의 후판 다층 용접을 위한 OLP 시스템의 용접 용접/용접이력 DB 구축)

  • 김장규;이승환
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 한국정밀공학회 2004년도 추계학술대회 논문집
    • /
    • pp.760-763
    • /
    • 2004
  • This work presents OLP system made independently in HSD for sub-assembly welding robot system set already and assembly welding robot system developed lately on the low speed diesel engines. This paper focuses on the DB module and the job creation based upon it. Also, It contains the welding history DB that saves the information of jobs executed after welding.

  • PDF

A Study on the Construction of the Framework Spatial DB of Watershed (유역단위 Framework 공간데이터베이스의 구축에 대한 고찰)

  • Kim, Kyung Tak;Choi, Yun Seok;Kim, Joo Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 한국수자원학회 2004년도 학술발표회
    • /
    • pp.1219-1222
    • /
    • 2004
  • 임의의 유역에서 유역을 관리할 목적으로 GIS DB를 구축할 경우 DEM을 이용하여 유역의 Framework 공간 DB를 구축하는 절차에 대해 고찰해 보고자 한다. 유역의 Framework 공간 DB를 DEM을 이용하여 구축할 경우는 DEM을 이용하여 유역의 수문지형학적 특성인자를 손쉽게 추출할 수 있으며 이들이 자동으로 공간 DB의 속성으로 입력되어 관리될 수 있다. 본 연구에서는 유역정보를 관리하기 위한 기반정보인 Framework 공간 DB의 형성 과정에 대해 정의하고 HyGIS를 개발하여 Network 기반의 수자원 통합 유역관리시스템의 개발 방향을 제시하고자 한다.

  • PDF

Construction of PANM Database (Protostome DB) for rapid annotation of NGS data in Mollusks

  • Kang, Se Won;Park, So Young;Patnaik, Bharat Bhusan;Hwang, Hee Ju;Kim, Changmu;Kim, Soonok;Lee, Jun Sang;Han, Yeon Soo;Lee, Yong Seok
    • The Korean Journal of Malacology
    • /
    • 제31권3호
    • /
    • pp.243-247
    • /
    • 2015
  • A stand-alone BLAST server is available that provides a convenient and amenable platform for the analysis of molluscan sequence information especially the EST sequences generated by traditional sequencing methods. However, it is found that the server has limitations in the annotation of molluscan sequences generated using next-generation sequencing (NGS) platforms due to inconsistencies in molluscan sequence available at NCBI. We constructed a web-based interface for a new stand-alone BLAST, called PANM-DB (Protostome DB) for the analysis of molluscan NGS data. The PANM-DB includes the amino acid sequences from the protostome groups-Arthropoda, Nematoda, and Mollusca downloaded from GenBank with the NCBI taxonomy Browser. The sequences were translated into multi-FASTA format and stored in the database by using the formatdb program at NCBI. PANM-DB contains 6% of NCBInr database sequences (as of 24-06-2015), and for an input of 10,000 RNA-seq sequences the processing speed was 15 times faster by using PANM-DB when compared with NCBInr DB. It was also noted that PANM-DB show two times more significant hits with diverse annotation profiles as compared with Mollusks DB. Hence, the construction of PANM-DB is a significant step in the annotation of molluscan sequence information obtained from NGS platforms. The PANM-DB is freely downloadable from the web-based interface (Malacological Society of Korea, http://malacol.or/kr/blast) as compressed file system and can run on any compatible operating system.

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • 제12권2호
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

Study of Shoreline Surveying and DB Construction (해안선 조사 측량 및 DB구축 연구)

  • Kim, Byung-Guk;Lee, Jong-Ki
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 한국지형공간정보학회 2002년도 춘계학술대회 논문집
    • /
    • pp.61-65
    • /
    • 2002
  • 오늘날 해안선은 육지와 바다의 경계이상의 의미를 가지고 있다. 지표면상에서 가장 독특한 공간 속성을 가지고 있는 해안선은 그 위치정보와 속성정보로 다양한 사용자와 공동체에게 귀중한 정보를 제공한다. 그러나 국가적 관심부족으로 육상부문 지리정보에 비해 해안선부근 해역 및 육역에 대한 과학적 정보가 빈약하고 해안선 조사와 관련한 학술 및 기술적 기초조사 자료의 DB구축이 부진한 상태이다. 본 논문에서는 2001년에 수행된 태안지역 해안선 조사 측량 및 DB구축 연구를 통해 앞으로 수행할 전국 해안선 조사 측량 및 DB구축의 기본계획을 수립하였고, 얻어진 데이터를 연안관리를 위한 기초데이터로 활용할 수 있는 방안을 연구하였다.

  • PDF

A Framework for Guaranteed Maximum Price and Contingency Development for Integrated Delivery of Transportation Projects

  • Gransberg, Douglas D.;Shane, Jennifer S.;Ahn, Jun-Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.1-10
    • /
    • 2011
  • This paper discusses the components of a guaranteed maximum price (GMP) and proposes a framework for the development of GMPs as contract payment provisions for construction manager-at-risk (CMR) and design-build (DB) contracts for transportation projects. The framework is the synthesis of a comprehensive literature review, a content analysis of CMR and DB solicitation documents and contracts, and case study project output from twelve projects in nine states worth $3.1 billion. The research also discusses the development of three common types of contingencies that are often utilized in projects with GMPs. The study concludes that owners should specify the structure of the GMP and its components to enhance clarity and understanding of the GMP's composition. It recommends that this structure be included in the CMR and DB solicitation documents so that pricing proposals can be formulated in a manner that is consistent with the contract payment provisions that will be useful to practitioners that need to implement GMP-based contracts.