• Title/Summary/Keyword: D&D빌딩

Search Result 117, Processing Time 0.024 seconds

BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city - (BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 -)

  • Lee, Hae-Chan;Kim, Jin-Man;Choi, Cheol-Ho;Song, Sang-Hoon
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

Measurement method for control valve noise (콘트롤 밸브의 소음 측정 방법)

  • Lee Y. B.;Yoon B. R.;Park K. A.;Lee D. H.;Yoo S. H.
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • spring
    • /
    • pp.515-518
    • /
    • 2002
  • 콘트롤밸브는 지역 냉${\cdot}$난방 및 APT, 대형 빌딩의 냉온수, 중온수 및 공조배관 시스템에 사용되어 유체적 바란스를 이루는데 사용된다. 이와같이 유체의 흐름을 조절하기 위하여 사용되는 콘트롤 밸브가 때로는 소음 문제를 일으키기도 한다. 최근 들어 밸브의 소음이 문제가 되는 경우가 빈번해 지고 있다. 밸브의 기본적 기능을 충족시키기 위해서는 영구적인 수두 손실이 필요하며 이러한 수두손실을 발생시키는 과정에서 유체 흐름에 의해 발생한 난류가 커다란 밸브 소음을 유발하게 된다. 본 연구에서는 콘트롤 밸브 소음 특성 평가 방법을 검토하였다. 밸브 및 배관으로 이루어진 시스템에서 발생되는 소음을 예측하는 절차를 살펴보았다. 밸브의 음향 파워레벨을 측정하고 유량 및 차압의 변화에 따른 소음 예측식을 결정 하였다. 본 연구에서 제시한 밸브 소음 측정 방법은 새로운 밸브의 소음특성 평가, 밸브 소음의 예측 그리고 서로 다른 밸브 사이의 성능비교 등에 사용될 수 있을 것이다.

  • PDF

A Study on Analysis of the Template Component for the Development of BIM Template (BIM 템플릿 개발을 위한 템플릿 구성요소 분석에 관한 연구)

  • Lee, Sang Heon;Kim, Mi Kyoung;Choi, Hyun Ah;Jun, Han Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.123-130
    • /
    • 2011
  • BIM based design methodology requires more information than traditional design methodology in order to insure efficiency throughout the project. BIM based design not only requires all building data in the form of 3D shapes, but also all other relevant data regarding building components. Information is typically grouped in a standard classification system such as by standardized material names. The development of a domestic BIM based standard classification system is yet to be created and deployed in the industry. Each designer is specifying their own building information classification systems which is causing inconsistency in the industry. Therefore BIM based designs, are causing confusion in the industry as each designer follow no guidelines for material standardization classification. The lack of information regarding this in the BIM template will continue to cause confusion about a projects building information data consistently. This study is that of preliminary research to develop a BIM template. First, overseas BIM templates were analyzed regarding BIM standards and documentation. Examination then followed regarding the element and characteristics needed for the development of a BIM template, a suggested hierarchy of elements required for a BIM template were then made. The result of this research is that it will be used to develop a "BIM template prototype", to support the generation of building information data regarding neighborhood facilities.

The Design of Scene Modeler Component for 3D GIS Software (3차원 GIS 소프트웨어를 위한 장면 모델러 컴포넌트 설계)

  • Kim, Sung-Soo;Choe, Seung-Keol;Lee, Jong-Hun;Yang, Young-Kyu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2001.10a
    • /
    • pp.81-84
    • /
    • 2001
  • 3 차원 GIS 소프트웨어를 개발하기 위한 기술로는 공간데이터처리 및 공간분석기술, 컴퓨터그래픽스 및 가상현실 기술에 이르기까지 다양한 연구가 요구된다. 지리정보 가시화(Visualization)에 관한 연구는 여러 GIS 응용분야에서 주요한 부분이 된다. 현재 2 차원 기 구축된 데이터를 이용하여 3차원으로 가시화 및 분석을 수행할 수 있다는 것은 데이터와 소프트웨어 재사용 및 비용측면에서 중요한 의미를 가진다. 본 논문에서는 2차원 데이터와 최소한의 3차원 부가정보(빌딩높이, 도로폭등)를 이용하여 규칙기반 모델링(Rule-Based Modeling)을 통해 3 차원으로 모델링 해 낼 수 있는 3 차원 장면 모델러 컴포넌트 설계 방법을 제안한다. 시설물의 다양한 상세도 제어가 가능한 LOD(level-of detail) 모델러와 3 차원 장면을 효율적으로 관리하기 위한 장면 그래프(scene graph) 컴포넌트 설계 기술을 소개한다. 장면 모델러 컴포넌트 분석을 위해 처리하는 입력 데이터, 수작업 3 차원 모델링 여부, 소프트웨어 재사용성, 상호운용성, 구축 비용 등을 기준으로 분석하였다.

  • PDF

Using Drone and Laser Scanners for As-built Building Information Model Creation of a Cultural Heritage Building (드론 및 레이저스캐너를 활용한 근대 건축물 문화재 빌딩정보 모델 역설계 구축에 관한 연구)

  • Jung, Rae-Kyu;Koo, Bon-Sang;Yu, Young-Su
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.11-20
    • /
    • 2019
  • The use of drones and laser scanners have the potential to drastically reduce the time and costs of conventional techniques employed for field survey of cultural heritage buildings. Moreover, point cloud data can be utilized to create an as-built Building Information Model (BIM), providing a repository for consistent operations information. However, BIM creation is not a requisite for heritage buildings, and their technological possibilities and barriers have not been documented. This research explored the processes required to convert a heritage university building to a BIM model, using existing off-the-shelf software applications. Point cloud data was gathered from drones for the exterior, while a laser scanner was employed for the interior of the building. The point clouds were preprocessed and used as references for the geometry of the building elements, including walls, slabs, windows, doors, and staircases. The BIM model was subsequently created for the individual elements using existing and custom libraries. The model was used to extract 2D CAD drawings that met the requirements of Korea's heritage preservation specifications. The experiment showed that technical improvements were needed to overcome issues of occlusion, modeling errors due to modeler's subjective judgements and point cloud data cleaning and filtering techniques.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

Analysis of BIM Technology Structure and Core Technology Using Patent Co-classification Network Analysis (특허 동시분류 네트워크 분석을 활용한 BIM 기술구조와 핵심기술 분석)

  • Park, Yoo-Na;Lee, Hye-Jin;Lee, Seok-Hyoung;Choi, Hee-Seok
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.1-11
    • /
    • 2020
  • BIM(Building Information Modeling) is a salient technology for influential innovation in the construction industry. The patent network analysis is useful for suggesting the direction of technology development and exploring the research and development field. Therefore, the purpose of this study is to analyze the BIM technology structure and core technologies according to the convergence of BIM technology and market expansion. In this study, social network analysis was conducted by establishing a co-classification IPC network for the United States BIM patent. In particular, the characteristics of the major technical areas in the BIM technology network were identified through centrality analysis. G06F017/00, digital computing or data processing method, is a core technology field in the BIM network. Arrangements, apparatus or systems for transmission of digital information, H04L029/00 is an influential technology across the network. B25J009/00 for program controlled manipulators is an intermediary technology field and G06T019/00, manipulating 3D models or images for computer graphics, is an important field for technological development competitiveness.

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Evaluation of Shear Load-transfer Barrette Pile in Sandy Soils (사질지반에서의 바렛말뚝의 주면하중전이 거동 평가)

  • Lee, Sang-Rae;Park, Seong-Wan;Lim, Dae-Sung
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.9
    • /
    • pp.5-13
    • /
    • 2010
  • Recently, the use of barrette pile has remarkably increased for high-rise building and bridge foundations. However, relatively few studies have been made for analyzing barrette pile behavior by considering shear load transfer on interface between pile and soils. Therefore, in this paper, an empirically derived equation is proposed. This equation correlates the load transfer curve of barrette piles with the N value from field standard penetration test based on full-scale load tests. The results from all procedures are presented. In addition, the effect of interface on pile-soil is evaluated using 3-D non-linear finite element method and verified with the field data.

Prediction and Evaluation on Inequality Shortening and Long-term Deflection of High-rise Flat Plate Structure using 3D Finite Element Analysis (3차원 유한요소해석을 이용한 고층 무량판 슬래브 구조물의 부등축소량 및 장기처짐 예측 평가)

  • Shim, Hak-Bo;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.159-160
    • /
    • 2020
  • Flat plate structures are designed in the form of long span due to the development of construction materials and the improvement of construction technology. However, a high-rise structure of a flat plate of 50 less floors is constructed without detailed review of the inequality shortening, long-term deflection of the slab, and cracks. Therefore, it is possible to examine the case of defects in the structure due to deformation and damage of non-structures such as crack and leak, deflection of the door frame, and deformation of equipment ducts. In this study, it is a high-rise structure, and the inequality shortening and long-term deflection of the slab of the flat plate structure were evaluated through finite element analysis, and it was confirmed that prior precision analysis and correction during construction is necessary.

  • PDF