• Title/Summary/Keyword: Cut and Cover

Search Result 149, Processing Time 0.026 seconds

Development of a trench shield machine for the near-surface railway construction (저심도 철도 건설을 위한 트렌치 쉴드 장비 개발연구)

  • Lee, So-Oh;Sagong, Myung;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.175-187
    • /
    • 2015
  • In this paper, the development of trench shield machine for near-surface railway construction were presented. The Near-surface railway can be constructed by cut and cover construction method, because it is installed at the depth of 5~7 m below roads. The cut and cover construction method mostly use temporary supports. The limitation of the cut and cover method is high installation cost and long construction period. To overcome these disadvantages, development of the trench shield machine is proposed and expected to shorten the construction time and cost of near-surface railway system. The sliding retaining wall of trench shield equipment replaces the role of temporary support (solider piles and lagging) and excavator equiped to the bottom front of the machine shorten the excavation time. This paper deals with design of the bit attached to the excavator and required capacity of the motor.

Analysis on the Field Measurements with the Construction of Cut and Cover Tunnel (복개 터널구조물의 현장 시공에 따른 계측 분석 사례)

  • 이석원;박시현;최순욱;배규진
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.125-137
    • /
    • 2003
  • Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells measured the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measurements, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process. Considerations on the validity of the field measurements were paid.

Behavior of arch slab in the shallow tunnel constructed perpendicular to slope by semi-cut-and-cover method (편경사지에 굴착한 반개착식 천층터널에서 아치슬래브의 거동)

  • Yang, Jae-Won;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.157-164
    • /
    • 2010
  • Recently, the number of shallow tunnel construction increases to improve the structural safety and environment-friendliness. In semi-cut-and-cover Method, ground is excavated to the crown arch level and arch slab is set to backfill before the excavation of lower face. In this study, laboratory model tests was performed to clarify the behavior of the arch slab constructed perpendicular to the slope. Results show that Arch slab is affected by perpendicular to the slope and bedrocks. Negative moment at the upper part of the arch slab at hillside and positive moment at the upper part at the other side are generated as perpendicular to the slope increases. Reaction load at the hillside support was larger than that at the other side.

Evaluation of Analysis Code of Corrugated Steel Plate Lining in Cut-and-Cover Tunnel (개착식 터널에서 파형강판 라이닝의 해석 기법 평가)

  • Kim, Jung-Ho;Kim, Nak-Young;Lee, Yong-Jun;Lee, Seung-Ho;Hwang, Young-Chul;Cho, Chul-Shin;Chung, Hyung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1316-1323
    • /
    • 2005
  • Most tunnel lining material which has been used in the domestic is a concrete. But many problems as the construction period, the cost, and the crack occurrence for the design, construction, and management were happened in the concrete lining. For this reason, many research institutes like the Korea Highway Corporation recognize the necessity of an alternate material development and grow on the interest for that. So in this study, the behaviour characteristics for the application of the Corrugated Steel Plate Lining in cut-and-cover tunnel are evaluated as several conditions for the backfill height, the cutting slope, and the relative density of backfill soil are changed. In addition, through using that conditions, CHBDC(2000, Canadian Highway Bridge Design Code) is evaluated if it could be applied to the design by comparing with the numerical analysis results. As the behaviour characteristics of the Corrugated Steel Plate Lining by CHBDC and the static numerical analysis are analyzed, both the methods show the same linear increases of the compressive stress according to the increase of the backfill height. The CHBDC of the dead load condition has very similar tendency by comparing with the result of the static numerical analysis.

  • PDF

Seismic Fragility Evaluation of Cut-and-cover Tunnel (박스형 터널의 지진 취약도 평가)

  • Park, Duhee;Nguyen, Duy-Duan;Lee, Tae-Hyung;Nguyen, Van-Quang
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.11
    • /
    • pp.71-80
    • /
    • 2018
  • In this study, the seismic response of cut-and-cover box tunnels is evaluated from pseudo-static analyses and the fragility curves are derived. A series of site profiles were used to evaluate the effect of soil conditions. A total of 20 ground motions were used. The fragility curves were developed as functions of peak ground acceleration for three damage states, which are minor, moderate, and extensive states. The damage indices, defined as the ratio of the elastic moment to the yield moment, correlated to three damage states, were used. The curves are shown to greatly depend on the site profile. The curves are further compared to those derived in previous studies. The widely used empirically derived curves are shown not to account for the site effects, and therefore underestimate the response for soft sites.

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법)

  • Sung, Hwa-Don;An, Jung-Whan;Chun, Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

Cutting Frequency and Liquid Manure Application on Green Manure Production of Rye and Hairy Vetch in Pear Orchard

  • Lee, Seong Eun;Park, Jin Myeon;Noh, Jae Seung;Lim, Tae Jun;Choi, Dong Geun
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.46 no.5
    • /
    • pp.322-326
    • /
    • 2013
  • Many organic fruit growers adopt cover cropping in their orchards to improve soil properties. A field experiment was conducted to determine the effects of cutting frequency of cover crop (CF) and liquid manure application (LM) on green manure production (GMP) and returnable nutrient content (RNC) in pear orchard. The combined effects of CF and LM were tested at two levels, respectively, with liquid manure ($L_1$) and without liquid manure ($L_0$). After that, cover crops were cut once ($C_1$) and three times ($C_3$) in rye, and twice ($C_2$) and four times ($C_4$) in hairy vetch. The result showed that main factors related to green manure production were different depending on the species. In rye, LM was more effective in increasing the dry weight of cover crop and RNC than CF. In contrast, the parameters were more affected by CF rather than LM in hairy vetch. Thus, it is suggested that different management technique is needed depending on the cover crop species in order to maximize the green manure production in pear orchard.

Effects of Sowing Method and Summer Management on Yield , Dead Matter , Weed Development and Ground Cover of Orchargrass (Dactylis glomerata L.) Meadow (파종방법 및 여름철관리가 Orchargrass ( Dactylis glomerata L. ) 채초지의 수량 , 고사물량 , 잡초발생 및 피복율에 미치는 영향)

  • 권찬호;김동암
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.7 no.2
    • /
    • pp.71-78
    • /
    • 1987
  • This experiment was carried out to examine the effects of sowing method and summer management on the dry matter yield, dead matter, weed development and ground cover of orchardgrass (Dactylis glomerata L.) meadow. The experiment was allocated as a split-split plot design with three replications. The main plots were sowing method of drilling and broadcasting, sub plots were drainage of experimental field, adequate and inadequate, and sub-sub plots were cutting timeof orchardgrass, cutting before rainy season started and cutting after rainy season ended. The experiment was undertaken over a period of 14 months from September, 1983 to October, 1984. The results obtained are summarized as follows: 1. There were no significant differences in dry matter yield among treatments at the first cutting, but cutting before rainy season produced significantly more forage yield ($P{\le}0.01$) than cutting after rainy season at the second and third cuts. At the third cutting, drilled orchardgrass meadow showed a significant dry matter yield ($P{\le}0.05$) than broadcast orchardgrass meadow, 2. The dead matter of orchardgrass was accumulated only at the second cutting when orchardgrass meadow cut after rainy season. Orchardgrass produced in the adequate and inadequate drainage plots consisted 20.4 and 35.9% of dead material, respectively, but no significant difference was found between two drainage treatments. 3. Drilled orchardgrass meadow produced significantly less weeds ($P{\le}0.05$) than broadcast orchardgrass meadow, but the plots cut after rainy season produced significantly more weeds ($P{\le}0.01$) than the plots cut before rainy season. 4. The percent ground cover of orchardgrass in the plots cut before rainy season was significantly higher ($P{\le}0.01$) than that in the plots cut after rainy season at the second cutting. Drilled plots showed a slight increase in the ground cover than the broadcast, but the difference was not significant. The same trend of ground cover of the meadow estimated at the second cutting was sustained after the third cutting. 5. Based on the results of the experiment, it indicates that the second cut of orchardgrass should be made before rainy season related for maintaining high yield of the meadow. Drilling as a sowing method of orchardgrass meadow could be adopted in the view point of reducing weed development.

  • PDF

Factors Affecting Performance of Rotary Impact-Type Threshers for Sesame and Perilla Harvesting

  • Pang, Yeoun Gyu;Kim, Sang Hun;Jun, Hyeon-Jong
    • Journal of Biosystems Engineering
    • /
    • v.43 no.3
    • /
    • pp.185-193
    • /
    • 2018
  • Purpose: The purpose of this study was to analyze the performance factors of a rotary impact-type thresher to develop a sesame and perilla thresher, specifically to analyze the cut length of the stems and the threshing rates based on the relationship between the blade velocity and feeding speed. Methods: The materials were dried within a range of 12.3-13.0% to test the impact cut by bending. The cut lengths of the perilla and sesame stems were categorized in 6 ranges (~7.0, 7.1-10.0, 10.1-13.0, 13.1-16.0, 16.1-20.0, 20.1- (cm)). For testing the cut length and threshing rate, the upward-rotating blade velocity was varied as 11.0 m/s, 13.5 m/s, and 22.3 m/s. Feeding speeds were changed from 0.1 m/s to 2.2 m/s by the inverter connected to the feed motor. The feed rate and threshing rates without cover-casing were evaluated with the factors of thresher testing. Results: The mean cut length of the stem decreased as the blade velocity increased and/or the feeding speed decreased. As the feed rate increased up to 17.5 g/s, the cut length distributions showed no significant difference. The threshing rate was 98.9% for sesame, and flexible according to the blade velocity and feeding speed of the perilla. Conclusion: Feeding material too fast could produce longer cut stem segments, therefore, a feeding speed less than 2.2 m/s is recommended. A blade velocity of 13.5 m/s is preferable for both sesame and perilla with regard to cut length and threshing rate.