• Title/Summary/Keyword: Cut River

Search Result 61, Processing Time 0.025 seconds

Improvement Effect of Water Quality along the Water Discharged Area by Water Dispersion from the Sewage Disposal Plant (하수처리장 분산방류에 의한 방류수역의 수질개선효과)

  • Kim, Dong-Soo;Park, Jong-Tae;Kim, Yong-Gu;Park, Sung-Chun
    • Journal of Environmental Science International
    • /
    • v.17 no.1
    • /
    • pp.113-118
    • /
    • 2008
  • [ $6{\sim}13mg/L$ ] base water concentration on monthly BOD has been kept at the Geukrak bridge point for this research target and it indicates the water quality under the existed rank. Due to this present condition of water quality, the demage of ecology from the upper stream to the lower one of the bridge could be conjectured. Moreover, nonstructural extinction of the ecology seems to have gotten worse between both the streams of Yeoungsan River. On this research, eco-corridor between the upper stream and the lower stream of the river should be ensured, the ecological demage needs to be cut off, a dispersed discharge method which the existed method of the 1st sewage plant in Gwangju was enhanced to should be inducted for the procuring of various water ecosystem, and the conditions by the scenario suggested from this research could be applied to a water quality model. then, analysis the improvement effect of the water quality adjacent the river. From the test result, Case3-Type1 scenario is thought to be the best one. From the test result with Case3-Type1 when the concentrated discharge was never done, 0.07 mg/L of BOD concentration was increased at the lower stream where Yeoungbon B point (Haksan Bridge) is but the water improvement effect of $0.24{\sim}2.87mg/L$ is thought to have been done at the area of water deterioration.

Charateristics of Morphological Lineament in Woongcheon River-basin and its Morphotectonic Significance (웅천천 유역에 나타나는 지형선구조의 구조지형학적 특성)

  • MIN, Seok-Gyu;KEE, Keun-Doh
    • Journal of The Geomorphological Association of Korea
    • /
    • v.18 no.4
    • /
    • pp.261-270
    • /
    • 2011
  • This study is to describe morphological linear anomalies manifested in the geomorphological landscapes of Woongcheon river-basin, situated in the western ends of Charyong Mountainous Range, and to elucidate their morphotectonic significance. The order of decreasing valley scale in the study area is NE-SW, NNE-SSW, NNW-SSE, N-S, and E-W series. The valleys of NE-SW lineament appear as the largest in the study area, having piedmont slope, terraces, low-relif hills. NNE-SSW lineament cross obliquely the geomorphological elements of the precedent lineament. NNW-SSE, N-S and E-W lineament cut the forms of higher orders showing NE-SW and NNE-SSW lineament. Scale of the linear valleys is not correlated with the order of streams. It is paradoxal that great valleys are not associated with the rivers of highest order. It owes to adaption of regional discharge system along the valleys exploiting the fracture resulted from succeeding tectonic accidents.

A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures- (淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로-)

  • Nam, Seong-Woo;Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.2
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF

Optimization of Multi-reservoir Operation with a Hedging Rule: Case Study of the Han River Basin (Hedging Rule을 이용한 댐 연계 운영 최적화: 한강수계 사례연구)

  • Ryu, Gwan-Hyeong;Chung, Gun-Hui;Lee, Jung-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.8
    • /
    • pp.643-657
    • /
    • 2009
  • The major reason to construct large dams is to store surplus water during rainy seasons and utilize it for water supply in dry seasons. Reservoir storage has to meet a pre-defined target to satisfy water demands and cope with a dry season when the availability of water resources are limited temporally as well as spatially. In this study, a Hedging rule that reduces total reservoir outflow as drought starts is applied to alleviate severe water shortages. Five stages for reducing outflow based on the current reservoir storage are proposed as the Hedging rule. The objective function is to minimize the total discrepancies between the target and actual reservoir storage, water supply and demand, and required minimum river discharge and actual river flow. Mixed Integer Linear Programming (MILP) is used to develop a multi-reservoir operation system with the Hedging rule. The developed system is applied for the Han River basin that includes four multi-purpose dams and one water supplying reservoir. One of the fours dams is primarily for power generation. Ten-day-based runoff from subbasins and water demand in 2003 and water supply plan to water users from the reservoirs are used from "Long Term Comprehensive Plan for Water Resources in Korea" and "Practical Handbook of Dam Operation in Korea", respectively. The model was optimized by GAMS/CPLEX which is LP/MIP solver using a branch-and-cut algorithm. As results, 99.99% of municipal demand, 99.91% of agricultural demand and 100.00% of minimum river discharge were satisfied and, at the same time, dam storage compared to the storage efficiency increased 10.04% which is a real operation data in 2003.

The Meanings of Dream Contents in the Psychotherapeutic Perspective (꿈의 의미(意味) : 정신치료적적 관점에서)

  • Lee, Byung-Wook
    • Sleep Medicine and Psychophysiology
    • /
    • v.8 no.2
    • /
    • pp.90-97
    • /
    • 2001
  • The reason for exploring dreams is to understand the of patient's conflicts and unconscious motivation. Even if the therapeutic value of dreams is considerably faded these days, I can not deny that dreams are still very useful. From the beginning of human history, dreams have been an appealing subject for many people. In the past, dreams chiefly had the value of prophetic meaning, and in our tradition attention was paid to dreams in terms of good and bad dichotomy. Freud's discovery of the Unconscious and technical development of its exploration is reinforced by dream interpretation. In contemporary terms, although dreams are not the royal road to the Unconscious, they surely present a short-cut. I suggest that dreams as a treasure island of the Unconscious have a useful therapeutic value, and that stressing the importance of dreams is by no means anachronistic. I believe that practical sessions without dreams are like a river without bridges.

  • PDF

Investigation of fish community structure and species diversity in two river estuary ecosystems, the Taehwa River and Changwon Stream, based on conventional survey and eDNA metabarcoding (어구조사 및 환경 DNA 메타바코딩을 이용한 태화강, 창원천 하구 생태계의 어류 군집 구조 및 종 다양성 평가)

  • Hee-kyu Choi;Yu Rim Kim;Soon Young Hwang;Yeounsu Chu;Pyoungbeom Kim;Hyuk Je Lee
    • Korean Journal of Environmental Biology
    • /
    • v.41 no.4
    • /
    • pp.637-656
    • /
    • 2023
  • River estuaries are dynamic and productive ecosystems with high regional biodiversity. Environmental DNA (eDNA) has become a useful approach to assessing biodiversity in aquatic ecosystems. This study was conducted to investigate fish community characteristics and species diversity in two river estuary ecosystems, the Taehwa River and Changwon Stream. We further compared conventional and eDNA metabarcoding analyses of the fish communities. The conventional survey was performed in May, July, and October 2022, while the eDNA analysis was conducted only in May. We observed various fish species with different life histories, including carp, goby, and marine fish. We also found that migratory fish, such as dace Tribolodon hakonensis, sweetfish Plecoglossus altivelis, and eel Auguilla japonica, occurred in the Taehwa River, suggesting high river connectivity. Marine fish species were predominant in the Changwon Stream, as this river is located close to the sea. The diversity indices showed that the Taehwa River generally had higher species richness, evenness, and diversity values than the Changwon Stream. A total of 9-19 species were detected in the conventional survey for the three sites, whereas 11-18 species were found from eDNA analysis. The findings indicate that the sensitivity of eDNA was similar to or higher than that of the conventional method. Our study findings suggest the efficiency and efficacy of eDNA-based fish community monitoring, although with some shortcomings in applying the genetic marker to Korean fish, including no clear-cut distinction for Korean endemic species and/or genetically closely related species groups.

Performance evaluation of hyperspectral bathymetry method for morphological mapping in a large river confluence (초분광수심법 기반 대하천 합류부 하상측정 성능 평가)

  • Kim, Dongsu;Seo, Youngcheol;You, Hojun;Gwon, Yeonghwa
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.3
    • /
    • pp.195-210
    • /
    • 2023
  • Additional deposition and erosion in large rivers in South Korea have continued to occur toward morphological stabilization after massive dredging through the four major river restoration project, subsequently requiring precise bathymetry monitoring. Hyperspectral bathymetry method has increasingly been highlighted as an alternative way to estimate bathymetry with high spatial resolution in shallow depth for replacing classical intrusive direct measurement techniques. This study introduced the conventional Optimal Band Ratio Analysis (OBRA) of hyperspectral bathymetry method, and evaluated the performance in a domestic large river in normal turbid and flow condition. Maximum measurable depth was estimated by applying correlation coefficient and root mean square error (RMSE) produced during OBRA with cascadedly applying cut-off depth, where the consequent hyperspectral bathymetry map excluded the region over the derived maximum measurable depth. Also non-linearity was considered in building relation between optimal band and depth. We applied the method to the Nakdong and Hwang River confluence as a large river case and obtained the following features. First, the hyperspectal method showed acceptable performance in morphological mapping for shallow regions, where the maximum measurable depth was 2.5 m and 1.25 m in the Nakdong and Hwang river, respectively. Second, RMSE was more feasible to derive the maximum measurable depth rather than the conventional correlation coefficient whereby considering various scenario of excluding range of in situ depths for OBRA. Third, highly turbid region in Hwang River did not allow hyperspectral bathymetry mapping compared with the case of adjacent Nakdong River, where maximum measurable depth was down to half in Hwang River.

Design of Sedimentary Rock Slopes in River Diversion Works (가배수로 터널공사의 퇴적암 사면 안정화 설계)

  • Jee, Wang-Ruel
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.17-32
    • /
    • 1998
  • The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia, The power station will consist of a 210m height concrete faced rockfill dam. During the construction of the dam and the power facilities the Balui river has to be diverted by three diversion tunnels with a length of some 1,400m each. The inner diameter of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet and outlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four. defined Rock Mass Types (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each 'global' slope without any rock support and shotcrete system. In the second stage, it is calculated for each 'local'slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Soft Sedimentary Rock Slopes Design of Diversion Tunnel

  • Jee, Warren Wangryul
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.10a
    • /
    • pp.63-79
    • /
    • 2007
  • Several remedial works were attempted to stabilize the collapsed area of the inlet slopes of diversion tunnel, but prevention of any further movement was being only carried out at beginning stage by filling the area with aggregates and rock debris, after several cracks had been initiated and developed around the area. The extra specialty developed folding zone is consisted with highly weathered Greywacke and Black shale. The suggested solution is to improve the properties of the rock mass of failed area by choosing the optimum level of reinforcement through the increment of slope rock support design so as to control the movement of slopes during the re-excavation. The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia. The power station will consist of a 210m height Concrete Faced Rockfill Dam. During the construction of the dam and the power facilities the Balui River has to be diverted of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four defined Rock Mass Type (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each "global" slope without any rock support and shotcrete system. In the second stage, it is calculated for each "local" slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Design for Carbon Neutral Arboretum in Gwangju Metropolitan City (광주광역시 탄소중립 수목원 설계)

  • Kim, Hoon Hee
    • KIEAE Journal
    • /
    • v.9 no.3
    • /
    • pp.61-68
    • /
    • 2009
  • Gwangju Metropolitan Government & Ministry of Environment have signed a model city in response to Climate Change agreement. The agreement calls for Gwangju to cut greenhouse gas emissions 10% below 2005 levels by 2015. Gwangju has seen this agreement as an opportunity to cut pollution and conserve the environment as well as to reinvigorate local economy. According to policy of Gwangju, Gwangju held design competition for Gwangju City Arboretum on march, 2009. The purpose of design competition was to give a wide publicity to Gwangju as Hub City of Asian Culture and construct carbon-neutral arboretum in accordance with the policy of 'Low-Carbon and Green Growth'. First of all, a design concept of arboretum is 'winding, round, overlay 'to reflect the landscape of Nam-do which is surrounded by mountains and river flows through the village. Second, the arboretum has five different places with these themes - Forest of Festivals, Health, Nature, Nostalgia, Education and Future. Each place has a symbolic theme park and different flow planning respectively. Third, the most critical point is that the arboretum is a carbon-neutral park. Gwangju arboretum will soon be developed in metropolitan sanitary landfill and constructed as the O2 arboretum based on low carbon strategy. Fourth, the O2 arboretum suggests specialized issue : 'Energy Saving', 'Recycling System', 'Green Network', 'Water System(rainwater maintenance and wetland development)'. Besides, main buildings(greenhouse, visitor center, Nam-do experience exhibition hall, and forest museum) is designed in consideration of harmony with topography character, surroundings. Also, planting will be a multilayer plant based on native landscape trees in consideration of function and the growth characteristics.