• Title/Summary/Keyword: Curtain wall structure

Search Result 31, Processing Time 0.017 seconds

Field Survey on the Structure and Manure Treatment of Two-Storey and Sawdust Pig Houses in Korea (국내 2층 돈사와 톱밥돈사의 구조 및 분뇨처리 실태조사)

  • Jeong J. W.;Yoo Y. H.;Song J. I.;Kim T. I.;Jeon B. S.;Yang C. B.
    • Journal of Animal Environmental Science
    • /
    • v.11 no.3
    • /
    • pp.169-176
    • /
    • 2005
  • The farm house structure, ventilation system and manure treatment of two-storey buildings and sawdust pig houses were surveyed and analyzed. Based on the data for ten selected farms in five provinces during eight months, the goal is to eventually establish a standard two-storey pig house. Manure treatments were composting, slurry and activated sludge in two-storey pig houses, while fermentation method was done in sawdust pig house. The depth of sawdust as a litter material were 10 to 60cm, with a duration of 1/2, 1, 3 and 6 months, respectively. The ventilation systems were the mechanical type in two-storey pig houses and natural system in the sawdust pig house. Side wall in the two-storey pig house was enclosed with insulation materials such as block, colored metal sheet and sandwich panels. The minimum ceiling height in the first floor of the two-storey pig house was 2.0m and the maximum was 3.0m. On the second floor, ceiling height ranged from 2.0 to 2.7m. The construction cost in the two-storey systems were $700\~140$, and sidewall curtain systems were $30\~40$ thousand Won/pyung.

  • PDF