• Title/Summary/Keyword: Critical risk factors

검색결과 351건 처리시간 0.026초

중환자실 간호사의 비판적 사고성향, 고위험약물 투약오류 위험수준 및 투약안전역량 (Critical Thinking Disposition, Medication Error Risk Level of High-alert Medication and Medication Safety Competency among Intensive Care Unit Nurses)

  • 이윤희;이영진;안정아;김희준
    • 중환자간호학회지
    • /
    • 제15권2호
    • /
    • pp.1-13
    • /
    • 2022
  • Purpose : The study aimed to identify relationship among intensive care unit (ICU) nurses' critical thinking disposition, medication error risk level of high-alert medication, and medication safety competency, as well as the factors affecting medication safety competency. Methods : The participants were 266 ICU nurses of one higher-tier general hospital and one general hospital in Province. The data were collected using structured self-administered questionnaire from August 10 to August 31, 2021. Measurements included the critical thinking disposition questionnaire, nurses's knowledge of high-alert medication questionnaire, the medication safety competency scale. Data were analyzed using hierarchical multiple regressions using SPSS/WIN 28.0. Results : In the multiple regression analysis, the medication safety competence has a statistically significant correlation with the working department, the critical thinking disposition, and medication error risk level of high-alert medication. Conclusion : Based on the results of this study, it is suggested to develop and apply an educational strategy that can strengthen the knowledge and skills of critical thinking disposition and medication error risk level of high-alert medication to improve the ICU nurse's medication safety competency.

품질 기능 전개법과 위험 부담 관리법을 조합한 설계 최적화 기법의 용접 품질 감시 시스템 개발 응용 (Weld Quality Monitoring System Development Applying A design Optimization Approach Collaborating QFD and Risk Management Methods)

  • 손중수;박영원
    • 제어로봇시스템학회논문지
    • /
    • 제6권2호
    • /
    • pp.207-216
    • /
    • 2000
  • This paper introduces an effective system design method to develop a customer oriented product using a design optimization process and to select a set of critical design paramenters,. The process results in the development of a successful product satisfying customer needs and reducing development risk. The proposed scheme adopted a five step QFD(Quality Function Deployment) in order to extract design parameters from customer needs and evaluated their priority using risk factors for extracted design parameters. In this process we determine critical design parameters and allocate them to subsystem designers. Subsequently design engineers develop and test the product based on these parameters. These design parameters capture the characteristics of customer needs in terms of performance cost and schedule in the process of QFD, The subsequent risk management task ensures the minimum risk approach in the presence of design parameter uncertainty. An application of this approach was demonstrated in the development of weld quality monitoring system. Dominant design parameters affect linearity characteristics of weld defect feature vectors. Therefore it simplifies the algorithm for adopting pattern classification of feature vectors and improves the accuracy of recognition rate of weld defect and the real time response of the defect detection in the performance. Additionally the development cost decreases by using DSP board for low speed because of reducing CPU's load adopting algorithm in classifying weld defects. It also reduces the cost by using the single sensor to measure weld defects. Furthermore the synergy effect derived from the critical design parameters improves the detection rate of weld defects by 15% when compared with the implementation using the non-critical design parameters. It also result in 30% saving in development cost./ The overall results are close to 95% customer level showing the effectiveness of the proposed development approach.

  • PDF

Clinical Phenotype of a First Unprovoked Acute Pulmonary Embolism Associated with Antiphospholipid Antibody Syndrome

  • Na, Yong Sub;Jang, Seongsoo;Hong, Seokchan;Oh, Yeon Mok;Lee, Sang Do;Lee, Jae Seung
    • Tuberculosis and Respiratory Diseases
    • /
    • 제82권1호
    • /
    • pp.53-61
    • /
    • 2019
  • Background: Antiphospholipid antibody syndrome (APS), an important cause of acquired thrombophilia, is diagnosed when vascular thrombosis or pregnancy morbidity occurs with persistently positive antiphospholipid antibodies (aPL). APS is a risk factor for unprovoked recurrence of pulmonary embolism (PE). Performing laboratory testing for aPL after a first unprovoked acute PE is controversial. We investigated if a specific phenotype existed in patients with unprovoked with acute PE, suggesting the need to evaluate them for APS. Methods: We retrospectively reviewed patients with PE and APS (n=24) and those with unprovoked PE with aPL negative (n=44), evaluated 2006-2016 at the Asan Medical Center. We compared patient demographics, clinical manifestations, laboratory findings, and radiological findings between the groups. Results: On multivariate logistic regression analysis, two models of independent risk factors for APS-PE were suggested. Model I included hemoptysis (odds ratio [OR], 12.897; 95% confidence interval [CI], 1.025-162.343), low PE severity index (OR, 0.948; 95% CI, 0.917-0.979), and activated partial thromboplastin time (aPTT; OR, 1.166; 95% CI, 1.040-1.307). Model II included age (OR, 0.930; 95% CI, 0.893-0.969) and aPTT (OR, 1.104; 95% CI, 1.000-1.217). Conclusion: We conclude that patients with first unprovoked PE with hemoptysis and are age <40; have a low pulmonary embolism severity index, especially in risk class I-II; and/or prolonged aPTT (above 75th percentile of the reference interval), should be suspected of having APS, and undergo laboratory testing for aPL.

일 종합병원 외과계 중환자실 환자의 섬망 발생 요인 (Risk Factors of Delirium Among the Patients at a Surgical Intensive Care Unit)

  • 천유경;박정윤
    • 중환자간호학회지
    • /
    • 제10권3호
    • /
    • pp.31-40
    • /
    • 2017
  • Purpose : This study examined the prevalence of delirium-related factors in a surgical intensive care unit (SICU). Methods : This retrospective study enrolled 73 patients who were admitted to an SICU from October 1, 2016 to March 20, 2017 and who had been hospitalized for more than 72 hours. Data was collected by reviewing electronic medical records. Results : Delirium occurred in 46 (63.0%) patients. Its related factors were age, education, mechanical ventilator, sleep, narcotics, physical restraint, and central line catheters. Conclusion : The results indicate that sleep and physical restraint are significant factors related to delirium occurrence. The results of this study can help in developing guidelines for the prevention of delirium.

  • PDF

A Framework for Systematic Management of Operational Risks

  • Akpolat, Hasan;Pitinanondha, Thitima
    • International Journal of Quality Innovation
    • /
    • 제10권2호
    • /
    • pp.1-17
    • /
    • 2009
  • This paper presents a theoretical research framework that was used to analyse operational risk management (ORM) system practices in Australia. It provides a new perspective on how to use national and international operational management system standards as a basis for systematic management of operational risks. Based on the extensive literature review and the analysis of operational risk management system practices that are common in Australian organisations, this paper identifies the critical factors for effective use of an ORM system. The proposed framework could also be used as a model to research ORM system applications in other countries.

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

Hazardous Factors and Accident Severity of Cabling Work in Telecommunications Industry

  • Kim, Yang Rae;Park, Myoung Hwan;Jeong, Byung Yong
    • 대한인간공학회지
    • /
    • 제35권3호
    • /
    • pp.155-163
    • /
    • 2016
  • Objective: This study aims to draw the characteristics of occupational accidents occurred in cabling work, and assess accident severity based on occupational injury data. Background: Accident factors and accident risk are different by the place of work in cabling work. Field managers require information on accident prevention that can be easily understood by workers. However, there has been a lack of studies that focus on cabling work in Korea. Method: This study classifies 450 injured persons caused in cabling work by process, and analyzes the characteristics of occupational injuries from the aspects of age, work experience and accident type. This study also analyzes accident frequency and severity of injury. Results: Results show that preparing/finishing (33.3%) was the most common type of cabling process in injuries, followed by maintenance (28.4%), routing/income (23.1%) and wiring/installation (15.1%) process. The critical incidents in the level of risk management were falls from height in the routing/incoming process, and falls from height in the maintenance process. And, incidents ranked as 'High' level of risk management were slips and trips, fall from height and vehicle incident in the preparing/finishing process, and fall from height in the wiring/installation process. Conclusion and Application: The relative frequency of accident and its severity by working process serve as important information for accident prevention, and are critical for determining priorities in preventive measures.

리스크 관리를 통한 프로젝트 타당성 검토방안에 대한 연구 -소규모 임대주택을 대상으로- (A Feasibility Study on Small-sized Rental Residential Building Project through Risk Management)

  • 김상철;박찬정;윤준선
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.97-105
    • /
    • 2004
  • 사업기획 및 타당성분석단계는 사업을 추진하는데 가장 큰 영향을 미치는 단계로써, 정확한 프로젝트 타당성 검토 수행은 프로젝트를 추진하는데 결정적인 기회를 제공해주므로 직관적인 접근방식보다는 객관적이고 정확한 방법의 제시가 요구되는 바이다. 사업타당성을 정확하게 분석하기 위하여 본 논문에서는 프로젝트 진행에 영향을 주는 리스크 인자를 식별하고 이 인자들을 성격별로 그룹화한다. 소규모 임대주택의 사례를 바탕으로 기존 방식인 금융부분의 프로젝트 타당성 분석을 실시한다. 위에서 식별된 리스크 인자들 중 금융부분을 포함하여 인자들간의 상관관계를 Influence Diagram으로 파악하여 리스크를 분석하고, 각 인자별의 중요도를 판별하기 위한 민감도 분석을 실시한다. 이와 같은 과정을 통하여, 기존의 프로젝트 타당성분석에서 사용하는 금융부분의 타당성분석 뿐만 아니라, 프로젝트 진행시에 나타나는 비정형적이고 주관적인 요소들을 리스크 인자로써 포함하여 분석할 수 있는 장점이 있다. 또한, 도출된 모든 리스크 인자를 정량화하여 객관적인 분석 및 의사결정을 할 수 있기 때문에 기존 방법보다 발전된 프로젝트 타당성 분석 방안을 본 논문에서 제시하였다.

프로젝트 위험요인 인식에 관한 비교 연구 - 정보시스템 구현 프로젝트에서 소프트웨어 패키지 적용과 순수 개발하는 경우 - (A Study on Perception of Project Risk Factor - Comparison between Software Package and Development with Program Language in Information System Project -)

  • 박송미;채명신
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제16권4호
    • /
    • pp.243-268
    • /
    • 2007
  • It is critical to manage risks to complete IS(Information Systems) projects successfully. Identifying risk factors would be the first step for the project risk management. Previous research has discussed the issue with various points of view, such as different risk factors based on project types and roles involved in their projects. This paper empirically explored how people perceive different risk factors by project development methodology, between self-developing IS using programming language like C, Visual Basic and adapting software package already developed by software venders like ERP, CRM packages. There are researches regarding project risk factors for project management in the several point of views. And there are also researches regarding comparison between self-developing and adapting software packages methodology in IS project. However, there are no study on project risk factors comparison between self-developing IS using programming language and adapting software packages already developed by software venders in IS project. This research can be differentiated from previous ones, because it was considered both point of project risk management and development methodology in IS project. This research results implied meaningful messages to enterprise company to be planned IS projects and people who involved in IS projects. They should consider and need to prepare differently according to each development methodology for preventing project risks. It makes them reduce project risks in each case and complete successfully IS projects. Especially, if they have no experiences for implementing software packages, they can forecast the project risks and prepare them in advance.

  • PDF

중소제조업체의 정보시스템 개발 실패 요인에 관한 실증연구 (An Empirical Study on Failure Factors of Information System Development Projects for SMEs)

  • 홍순구;최일용
    • 한국IT서비스학회지
    • /
    • 제8권4호
    • /
    • pp.41-55
    • /
    • 2009
  • Due to the global business environments and severe competitions, SMEs have carried out IS projects for their competitive advantages. However, numerous organizations have faced with difficulties in the IS project management such as large amounts of IT expenses and uncertainties in project implementations. Thus, this study is intended to discover critical risk factors in the IS project management. To achieve this research goal, we have mailed questionnaires to SMEs and SI companies that experienced IS project failures and 63 usual data were collected. The result of analysis with step wise regression showed that 6 factors are related with IS project failures. The study contributes to the literature in two ways. First, this paper empirically identifies IS risk factors for SME manufactures. Second, this research result can be utilized as a checklist for the successful IS implementations. Limitations and future research topics are also discussed.