• 제목/요약/키워드: Critical Risk Factor

검색결과 199건 처리시간 0.026초

Design of safety critical and control systems of Nuclear Power Plants using Petri nets

  • Singh, Pooja;Singh, Lalit Kumar
    • Nuclear Engineering and Technology
    • /
    • 제51권5호
    • /
    • pp.1289-1296
    • /
    • 2019
  • Non-functional requirements plays a critical role in designing variety of applications domain ranges from safety-critical systems to simple gaming applications. Performance is one of the crucial non-functional requirement, especially in control and safety systems, that validates the design. System risk can be quantified as a product of probability of system failure and severity of its impact. In this paper, we devise a technique to do the performance analysis of safety critical and control systems and to estimate performance based risk factor. The technique elaborates Petri nets to estimate performability to ensure system dependability requirements. We illustrate the technique on a case study of Nuclear Power Plant system. The technique has been validated on 17 safety critical and control systems of Nuclear Power Plant.

RFID기반수산물이력제의 성공요인에 대한 탐색적 연구 -소비자 및 공급자 관점을 중심으로- (Critical Success Factors of REID-based Fisheries Traceability Systems: From the Perspectives of Consumers and Suppliers)

  • 김진백
    • 수산경영론집
    • /
    • 제38권2호
    • /
    • pp.25-40
    • /
    • 2007
  • Recently, fisheries safety has been a matter of primary concern among consumers and suppliers. This phenomenon made them require the introduction of fisheries traceability systems. For traceability systems to be effective, automatic identification means play an important role. Therefore, RFID-based fisheries traceability systems are more required than barcode-based fisheries traceability systems. Unlikely EU and Japan, Korea did not accept mandatory traceability regulations. But Many countries began to accept mandatory traceability regulations to diminish food risks. So Korea is expected to adopt them in the near future. The purpose of this study is to find what benefits are generated from the adoption of RFID-based fisheries traceability systems and are related to their success. To do these, this study investigated primary benefits of RFID-based fisheries traceability systems from the perspectives of consumers and suppliers. Consumers' benefits were derived from the perceived risk dimensions. And suppliers' benefits were derived from operational benefits of RFID systems. To purify the benefits from RFID-based fisheries traceability systems, reliability and factor analysis were used. And the refined benefits of RFID-based fisheries traceability systems were additionally analyzed to find which benefits were significantly related to fisheries traceability systems' success. According to the analysis results, all risk dimensions except social risk were significantly related to their success. But in the benefits of suppliers, only "recalls and counterfeits" factor was significantly related to their success. These results implied that fisheries traceability systems should be based RFID technology instead of barcode and fisheries traceability systems were related to almost food risk dimensions. It's because these significant factors are related all food risks except social risk and the benefits of suppliers can be derived from only RFID technology.

  • PDF

심부전 환자의 빈혈과 사망률 및 재입원 간의 관계에 대한 통합적 고찰 (Anemia as a Risk Factor of Mortality and Rehospitalization in Patients with Heart Failure : An Integrative Review)

  • 손연정;김보환
    • 중환자간호학회지
    • /
    • 제12권1호
    • /
    • pp.94-108
    • /
    • 2019
  • Purpose : Heart failure (HF) is considered an important medical burden with rehospitalization and mortality. Anemia is a major risk factor associated with the severity of HF. To improve the understanding of the impact of anemia in the population with HF, we explored the prevalence of anemia, its guidelines, relationship between anemia and mortality or rehospitalization, and limitation of reviewed papers of various populations with HF. Method: We used Whittemore and Knafl's integrative review methodology (2005), and thirty research papers were analyzed. PubMed, CINAHL, Cochrane, PsychInfo, Embase, Web of Science were searched for papers published between January 1960-June 2018. Results: Anemia in individuals with HF was primarily defined using the World Health Organization guideline. The prevalence of anemia in patients with HF varied from 9% to 56.7%. Moreover, such a condition significantly increases the prevalence of mortality or rehospitalization in patients with HF. The analyzed majority were non-prospective cohort study including secondary data analysis. Conclusion: Anemia in individuals with HF is a significant risk factor of mortality and rehospitalization. Prospective cohort studies should be designed to identify the optimal value for screening anemia and the impact of anemia on rehospitalization and mortality among HF patients.

대규모 프로젝트의 위험요인과 위험관리에 관한 사례연구 (A Case Study on Risk Factors and Risk Management in a Large-scale Project)

  • 홍사능
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제19권1호
    • /
    • pp.97-116
    • /
    • 2010
  • Failures of super large projects like IT Upgrade of Shinhan Financial Group can be a heavy blow not only to the company but even to the national economy. Research on the practices of risk management in those projects will provide invaluable lessons, enhancing capabilities and chances of successfully executing mission critical projects of the companies and the national economy as a whole. This paper analyzes the risk management of the Core Systems Reconstruction which was the most critical component of IT Upgrade. The analysis covers risk management plans, and identification and evolution, and control and monitoring of risk factors. This study confirms the major results of previous research on risk management in Korea. However, the analysis found as well some discrepancies of practices from the previous research results. This research also tracked the trajectories of evolution of risk factors and management. In particular, in depth analysis of control and monitoring is the first research in Korea on the "management" of risks in IT projects. The result of this research is expected to be a useful guide for theory development and practices of risk management in the future.

성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 - (The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects)

  • 서재필;류한국;손보식;최윤기
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.76-86
    • /
    • 2016
  • 2014년까지 지속적인 증가세를 보이던 해외건설사업 수주가 2015년에는 하향세가 뚜렷한 모습을 보이고 사업 운영 실적도 감소했다. 이러한 추세의 이유로 저가수주, 사업관리 Know-How 부족과 부실한 사업관리, 클레임 관리 능력 부실 등 여러 이유를 찾을 수 있다. 이에 수주 질적 향상의 필요성이 대두 되고 있다. 반복되는 실패에 대한 교훈을 삼고 입찰과정에서 기술, 상업, 계약적인 사항을 면밀히 검토하고, 사업 초입 단계에서 입찰 업무 시스템의 체계화가 필요하다. 또 사업지역 정보력 등 영업적인 측면의 경쟁력도 키운다면 질 높은 입찰을 제안함으로써 성공적인 사업으로 이끌어 낼 수 있을 것이다. 입찰 기술 고급화 전력이 해외건설사업의 리스크와 원가율, 추후 사업 확장 등 여타 전략적 측면에서 사업 성공의 열쇠(Key)가 되고 있다. 본 연구는 입찰 업무 프로세스 분석과 입찰업무 단계의 핵심성공인자(Critical Success Factor)를 도출하고 업무상의 리스크(Risk)인자를 찾아 핵심성공요인과 연계하여 종합적으로 관리함으로써 리스크 수준을 낮출 수 있는 프로세스 모델을 제시하고자 하는데 목적이 있다.

Using Bayesian network and Intuitionistic fuzzy Analytic Hierarchy Process to assess the risk of water inrush from fault in subsea tunnel

  • Song, Qian;Xue, Yiguo;Li, Guangkun;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng;Zhou, Binghua
    • Geomechanics and Engineering
    • /
    • 제27권6호
    • /
    • pp.605-614
    • /
    • 2021
  • Water inrush from fault is one of the most severe hazards during tunnel excavation. However, the traditional evaluation methods are deficient in both quantitative evaluation and uncertainty handling. In this paper, a comprehensive methodology method combined intuitionistic fuzzy AHP with a Bayesian network for the risk assessment of water inrush from fault in the subsea tunnel was proposed. Through the intuitionistic fuzzy analytic hierarchy process to replace the traditional expert scoring method to determine the prior probability of the node in the Bayesian network. After the field data is normalized, it is classified according to the data range. Then, using obtained results into the Bayesian network, conduct a risk assessment with field data which have processed of water inrush disaster on the tunnel. Simultaneously, a sensitivity analysis technique was utilized to investigate each factor's contribution rate to determine the most critical factor affecting tunnel water inrush risk. Taking Qingdao Kiaochow Bay Tunnel as an example, by predictive analysis of fifteen fault zones, thirteen of them are consistent with the actual situation which shows that the IFAHP-Bayesian Network method is feasible and applicable. Through sensitivity analysis, it is shown that the Fissure development and Apparent resistivity are more critical comparing than other factor especially the Permeability coefficient and Fault dip. The method can provide planners and engineers with adequate decision-making support, which is vital to prevent and control tunnel water inrush.

초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석 (An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project)

  • 김남균;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.73-83
    • /
    • 2013
  • 최근 국내 외 대도시를 중심으로, 글로벌 경제 위기와 부동산 경기 침체로 중단되거나 연기되었던 초고층 프로젝트들이 재개되고 있으며, 이를 수주하기 위한 건설사들의 경쟁은 전보다 더욱 치열해지고 있다. 국내 건설사들이 초고층 건축 분야에서 경쟁력을 높이기 위해서는, 전체 프로젝트의 근간이 되는 중요한 요소인 양중계획의 체계적인 리스크 관리가 반드시 수반되어야 하지만, 여전히 개인적 경험에 의존하여 작성 된, 양중계획의 오류로 인한, 현장 전체의 공기 지연 및 원가 관리 실패의 문제가 빈번하게 발생하고 있다. 따라서 본 연구에서는, 양중계획의 정확성을 높이기 위한 방안으로, 현행 양중계획 체계의 문제점을 분석하고, 계획 요소에 따라 실패 유형을 도출하였으며, 각 실패 유형이 전체 프로젝트의 공정, 원가, 안전관리에 미치는 영향도를 분석하였다. 또한 양중 장비별 세부 리스크 요인을 분석하고, 이를 바탕으로 FMEA 기법을 적용하여 초고층 프로젝트 양중계획의 핵심 리스크 요인을 도출하였다.

소규모 건설현장의 중대재해 저감 방안 도출을 위한 연구 (A Study of Decreasing Critical Disaterous Accidents in Small Construction Sites)

  • 백신원;김한중;최돈흥
    • 한국농공학회논문집
    • /
    • 제54권6호
    • /
    • pp.121-131
    • /
    • 2012
  • Many of the falling which is the number one risk factor in lethal accidents in construction could have been prevented if the right activity or supervising had been taken in time. All other measures do not preventive the fall, but rather intercept the fallen itself or preventive severe injury. The most common and the bets measures on the preventive measures are guardrails which are to be worn on the site. Workers always exposed the risk of serious accidents induced by causal effects related with environments around construction sites. In order to represent how to decrease the risk of workers, this study was accomplished with a number of interview with experienced site director, cheief of instructors, workers. And the questionaire survey (2012. 5~2012. 10) were used to make proposed policies which are expected to reduce critical disastrous accidents and strength authorized limits of director's management automatically.

턴키 프로젝트에서 리스크요인 분석 및 정량적 평가 (Analysis and Quantitative Estimation of Risk Factors of Design-Build)

  • 오국열;이영대
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.12-24
    • /
    • 2012
  • 턴키계약방식(Design Build)은 설계시공 일괄계약방식으로 책임 한계가 보다 광범위하게 적용되어 프로젝트 수행 초기 설계 단계부터 설계비 부담 증가 등 일반 분리발주공사 보다 리스크 발생율이 높은 실정이다. 따라서 이번 연구에서는 턴키계약프로젝트에서 리스크요인의 분석 및 정량적 평가 방안을 연구하였다. 이 번 연구는 프로젝트참여자로부터 수집한 설문조사자료를 이용하여 통계분석을 수행한 결과 총145개의 리스크변수중 전체 참여자 그룹이 동의하는 DB프로젝트에서의 리스크변수는 25개로 나타났다. 요인분석을 통하여 이를 8가지 리스크요인으로 함축할 수 있었으며 이중 3가지 요인인 건설현장관련, 계약관련 및 설계관련 리스크요인이 72%의 가중치를 나타내었다. 리스크변수 및 리스크요인에 따른 가중치와 결합확률을 이용하여 리스크요인에 기인한 추정손실의 크기를 전체공사비에 대한 백분율로 추정한 결과 약 6%로 나타났고, 리스크 요인상호영향을 고려하면 약 10%를 나타나 리스크대응을 위하여 전체공사비의 약 6%~10%의 예비비를 계상할 필요가 있는 것으로 나타났다.

초등학교 급식의 비빔밥 생산과정에 따른 미생물적 품질평가 (Microbiological Quality Assessment of Bibimbap Production Flow in Elementary School Foodservice)

  • 김복란;채순주
    • 대한가정학회지
    • /
    • 제43권2호
    • /
    • pp.19-31
    • /
    • 2005
  • The purpose of this study was to evaluate the microbiological quality and assure the hygienic safety of the Bibimbap production in elementary school foodservice in accordance with the HACCP(Hazzard Analysis Critical Control Point) program. The time-temperature relationship and the microbiological quality(total plate count and coliform bacteria count) were assessed to find the critical control point(CCP) during each of the production phase. In the pre-preparation phase, the risk factors of the raw ingredients exceeded the standard level suggested by Solberg et al. Mungbean starch jelly, egg and Kochujang were satisfactory in that no coliform groups were observed over the standard TPC level. In particular, there was a high the risk of beef from the early stages in terms of the coliform level. In the pre-preparation phase, green pumpkin had more coliform groups than the standard level even after washed, which calls for special attention to washing, sterilization, secondary infection of the handler, and the required time for pre-preparation of raw vegetables. In the cooking phase, the temperature of the soybean sprout and mungbean starch jelly decreased to 42$^{\circ}C$ and 26$^{\circ}C$, respectively, which was within the risk zone. In particular, mungbean starch jelly had a great risk factor even after boiling in hot water. During the storage stage before serving, a lot of ingredients were exposed to poor management of temperature and time and thus exceeded the standard level in the total plate counts. In particular, the microbiological count of beef was five times the standard level. Green pumpkins and soybean sprouts were left at 15-38$^{\circ}C$ that is within the risk zone for a long period of time after they were cooked. It is highly recommended that the time of the storage stage before consumption should be shortened and that proper devices should be used to prevent proliferation of bacteria. The number of TPC of the utensils was satisfactory enough, but the knife used exceeded the standard level and thus was a risk factor of bacteria proliferation.