• Title/Summary/Keyword: Cranes

Search Result 405, Processing Time 0.024 seconds

Probabilistic and spectral modelling of dynamic wind effects of quayside container cranes

  • Su, Ning;Peng, Shitao;Hong, Ningning;Wu, Xiaotong;Chen, Yunyue
    • Wind and Structures
    • /
    • v.30 no.4
    • /
    • pp.405-421
    • /
    • 2020
  • Quayside container cranes are important delivery machineries located in the most frontiers of container terminals, where strong wind attacks happen occasionally. Since the previous researches on quayside container cranes mainly focused on the mean wind load and static response characteristics, the fluctuating wind load and dynamic response characteristics require further investigations. In the present study, the aerodynamic wind loads on quayside container cranes were obtained from wind tunnel tests. The probabilistic and spectral models of the fluctuating aerodynamic loads were established. Then the joint probabilistic distributions of dynamic wind-induced responses were derived theoretically based on a series of Gaussian and independent assumption of resonant components. Finally, the results were validated by time domain analysis using wind tunnel data. It is concluded that the assumptions are acceptable. And the presented approach can estimate peak dynamic sliding force, overturning moments and leg uplifts of quayside container cranes effectively and efficiently.

Deployment of Yard Cranes Considering Storage Plans in Container Terminals (컨테이너 터미널에서 장치계획을 고려한 야드 크레인 배치 문제)

  • Won, Seung-Hwan;Kim, Kap-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.33 no.1
    • /
    • pp.79-90
    • /
    • 2009
  • The main function of a container terminal is to load container freights into vessels and discharge them from vessels. The container terminal needs to utilize its resources effectively in order to improve the productivity of it. This study deals with the deployment model for yard cranes whose type is RMGC (rail mounted gantry crane). We develop a mathematical model for the deployment of yard cranes. The model considers not only the deployment but also the storage plans. It could be divided into two cases according to whether inter-block movements of yard cranes are allowed or not, during the same period Numerical examples are solved and analyzed to validate the model. Then, additional experiments are performed to compare the performance of the model with that of a previous model without the re-deployment of yard cranes.

Analysis of Combined Productivity at Automated Container Terminal Using Simulation (시뮬레이션을 이용한 자동화 컨테이너터미널의 결합 생산성 분석)

  • Ha, Tae-Yeong;Choe, Yong-Seok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.656-659
    • /
    • 2004
  • The objective of this paper is to analyze the combined productivity at automated container terminal. We present a simulation model for transport vehicle that perform the container transportation between apron and yard with a perpendicular yard layout. Usually, the efficiency of container terminal is evaluated by productivity of container cranes at apron, and though there are enough support of transport vehicles and yard cranes, can improve the productivity of container cranes. Especially, transport vehicle is very important factor in productivity of container cranes and has variable work productivity according to loading and unloading situation. Therefore, a method that can estimate combined productivity of equipment is required. We performed various simulation experiment and analyzed combined productivity to estimate the required number of equipment.

  • PDF

The Development of the Knowldege-Based Electric Fault Diagnosis and Maintenance System for Overhead Cranes (지식베이스를 이용한 천정크레인의 전기고장 진단 및 처방 시스템 개발)

  • Choi, Seung-Young;Kim, Sunn-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.1
    • /
    • pp.71-85
    • /
    • 1994
  • Overhead cranes which carry heavy items in construction or production areas consist of structure and electric modules. More than 80% of breakdowns bring out of the electric module. As operators do not know all about cranes, it sometimes takes much time to repair the cranes. In order to resolve this problem, the expert system which can diagnose causes of faults and give instructions for repair to operators, has been developed. The scope of the paper is limited to the electric module. First of all, analyzing symptoms and causes, we have developed a rule base with the expert system shell, EXSYS. Furthermore, for the facility maintenance including repair instructions against the causes, the instruction data base was developed with FOXPRO. On the other hand, for the help of user's understanding the fault causes, the graphic animation module which shows malfunctioning component ports or motions in 3D was developed with the graphic software, TOPAS VGA.

  • PDF

An Analysis of the Accident Types and Causes of Construction Cranes (크레인 관련 중대재해사례를 통한 재해 유형 및 원인 분석)

  • Kim, Hong-Hyun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.109-112
    • /
    • 2007
  • As buildings become higher, larger, and more complex, safety issues for construction workers working at such environments become more important. We analyzed 140 critical accident cases reported to the KOSHA(Korea Occupational Safety & Health Agency) for construction cranes and lifts by types of cranes and by patterns of accidents and causes. By finding out the accident's types and causes, we expect to develop an efficient measure for preventing similar accidents in the near future. The cases will be studied further and reexamined using the FMEA(Failure Mode and Effect Analysis) as a quantitative analysis method.

  • PDF

A Study on the Safety Risk of Telescoping Work of Tower Cranes (타워크레인 텔레스코핑 작업의 안전리스크 대응방안 연구)

  • Lee, Dong-Hoon;Choi, Jae-Hwi;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.9-13
    • /
    • 2009
  • As recent construction projects are bigger and higher, the importance of lifting is increasing. In construction sites tower cranes are an essential lifting equipment covering were than 50% of all construction activities. But due to neglect of safety supervision, tower crane-related accidents are frequently taking place. Since most of construction activities is done in heights, the accidents are more likely to be catastrophic. According to an analysis of the causes of tower crane-related accidents, 49% of all accidents claimed for certain periods($1999{\sim}2003$) occurred in the process of telescoping work. Therefore, this research is conducted with the object of analyzing telescoping work of tower cranes and presenting solutions against safety risk. It is expected that the results of this study can be used as useful basic data or material when preparing for effective safety management for tower cranes.

  • PDF

A Study on the Development of a New Concept Crane (새로운 형태의 컨테이너 크레인의 개발에 관한 연구)

  • 박찬훈;김두형;신영재;박경택;고재웅
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.273-280
    • /
    • 1999
  • Yard cranes are very useful equipments for handing of heavy containers, But rope-driven yard cranes must have a little of sway and skew motion because ropes are passive mechanical device. Therefore rope-driven yard cranes require skilled drivers to depress sway and skew motions. So many researches have been concentrated on anti-sway and anti-skew algorithm controlling trolley speed or rope tension. Although many efforts, the rope-driven method is not proper to an automated yard equipment because of sway and skew motion. This paper will propose a new concept yard crane which has a new structure, overcomes defects of rope-driven cranes and is proper to automation. And we will study its actuality

Input Shaper Design for Tower Crane in Consideration of Nonlinear Coupled Motions (타워크레인의 비선형 연성 운동 특성을 고려한 입력성형기 설계)

  • Kim, Byung-Gyu;Hong, Seong-Wook
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.9
    • /
    • pp.88-95
    • /
    • 2009
  • Input shaping has been a very effective control method for reducing payload swing in industrial bridge and gantry cranes. However, conventional input shapers often degrade performance when applied to tower cranes because of the nonlinear coupled dynamics between rotational and radial motions in tower cranes. To alleviate this problem, a new input shaper for tower cranes is developed by means of dynamic modeling, analysis and optimization. This work investigates the tower crane dynamics along with parameters of the tower crane varied. A performance index for input shaper design is proposed so as to reduce the coupled residual vibration of a tower crane using only rotational motion of tower crane. The proposed new input shaper is verified to be effective through simulations and experiments.

OPTIMAL DESIGN ALGORITHM OF THE FOUNDATION OF TOWER CRANES

  • Kim, Sun-Kuk;Kim, Jang-Young;Ryu, Sang-Yeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1047-1052
    • /
    • 2009
  • As buildings nowadays become taller in height and larger in size the safety review of lifting plan takes larger portion in construction project management. However, the cost and safety in lifting plan have a contradictory effect on each other. Therefore, an optimization algorithm needs devising as a solution of the contradictory problem. In many cases at construction sites, selections and stability review of tower cranes are assigned to equipment suppliers or field managers, which cause the problems in safety and cost of the projects. To improve the part of the current situation, a study on the optimization algorithm for designing the foundation of tower cranes is conducted in this study, which can be utilized by equipment suppliers or field managers to check the stability of tower cranes easily and promptly without substantial knowledge.

  • PDF

Dynamic Response Simulation of a Heavy Cargo Suspended by Parallel Connected Floating Cranes (병렬 연결된 해상 크레인을 이용한 대형 중량물 인양 작업의 동적 거동 계산 시뮬레이션)

  • Cha, Ju-Hwan;Ku, Nam-Kug;Roh, Myung-Il;Lee, Kyu-Yeul
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.6
    • /
    • pp.681-689
    • /
    • 2012
  • In this study, we performed a simulation of the dynamic response of a multibody system to calculate the tension acting on wire ropes connecting floating cranes and a heavy cargo such as a Giga Block weighing over 5000 tons when the cargo is salvaged using parallel connected floating cranes. In this simulation, we supposed that the motion of the floating cranes, barge ship, and heavy cargo has 6 degrees of freedom and that the interaction is determined by constraints among them. In addition, we considered independent hydrostatic and hydrodynamic forces as external forces acting on the floating cranes and barge ship. The simulation result can be a basis for verifying the safety of construction methods in which heavy cargo is salvaged by parallel connected floating cranes, and it can also be used to guide the development of such construction methods.