• 제목/요약/키워드: Cost-based pool

검색결과 97건 처리시간 0.03초

양식장 이용에 대한 수학적 모형 (Mathematical Model of Aquaculture Facility Utilization)

  • 어윤양
    • 수산해양교육연구
    • /
    • 제26권2호
    • /
    • pp.444-454
    • /
    • 2014
  • The range of optimization problem in aquaculture is very wide, resulting from the range of species, mode of operation. Quite a few studies focus marine net-cages, but studies on land based culture farm are few or no. This paper considers a allocation problem to meet production planning in land based aquaculture system. A water pool allocation model in land based aquaculture system was developed. The solution finds the value of decision variable to minimize yearly production costs that sums up the water pool usage cost and sorting cost. The model inputs were (1) the fish growth rate (2) critical standing corp (3) number of water pool (4) number of fish. The model outputs were (5) number of water pool in growing phase (6) cost of cultivation (6) optimal facility allocation(number of water pool for each growing phase). To solve the problem, an efficient heuristic algorithm based on a greedy manner is developed. Branch and bound and heuristic is evaluated through numerical examples.

비용기반 전력시장에서의 용량요금 산정방안에 관한 연구 (A Study on the Capacity Payment in Cost Based Pool)

  • 한석만;김발호
    • 전기학회논문지
    • /
    • 제57권9호
    • /
    • pp.1531-1535
    • /
    • 2008
  • In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).

PBP(Price Based Pool) 발전경쟁시장에서의 최적입찰전략수립 (Optimal Bidding Strategy of Competitive Generators Under Price Based Pool)

  • 강동주;허진;문영환;정구형;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권12호
    • /
    • pp.597-602
    • /
    • 2002
  • The restructuring of power industry is still going on all over the world for last several decades. Many kinds of restructuring model have been studied, proposed, and applied. Among those models, power pool is more popular than other. This paper assumes the power pool market structure having competitive generation sector, and a new method is presented to build a bidding strategy in that market. The utilities participating in the market have the perfect information of their cost and price functions, but they don't know which strategy to be chosen by others. To define one's strategy as a vector, we make utility's cost/price functions into discrete step functions. An utility knows only his own strategy, so he estimates the other's cost/price functions into discrete step functions. An utility knows only his own strategy, so he estimates the other's strategy using Nash equilibrium or stochastic methods. And he also has to forecast the system demand. According to this forecasting result, his payoffs can be changed. Considering these all conditions, we formulate a bidding game problem and apply noncooperative game theory to that problem for the optimal strategy or solution. Some restrictive assumption are added for simplification of solving process. A numerical example is given in Case Study to show essential features and concrete results of this approach.

선진전력시장 DR 프로그램의 변동비 반영시장 적용 분석 (Analysis on the Application of Advanced Electricity Market DR to Cost-Based Pool)

  • 박세진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.668-669
    • /
    • 2011
  • 우리나라 전력시장은 구조개편 초기모델로 2001년 4월부터 개설된 원가반영발전시장(Cost BasedPool)으로 새로운 경쟁적 시장환경이 도입되기에는 여러 가지 한계가 있을 수 있다. 요즘 해외시장에서도 화두가 되고 있는 DR(수요자 반응)의 원가반영시장에서의 적용 영향을 분석한다

  • PDF

우리나라 발전경쟁시장(Cost Based Pool)에서의 계통운영서비스(Ancillary Services) 체계 (Ancillary Service Structures in the Cost Based Pool of Korea)

  • 배주천;황봉환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.187-189
    • /
    • 2001
  • 전력산업 구조개편에 따라 개설된 우리나라의 발전경쟁 시장에서 전력계통안정 및 전기품질 확보를 위하여 적용되는 계통운영서비스의 종류와 확보기준 및 운영방법을 소개하고 향후 전력시장의 발전에 따라 적용예정인 계통운영서비스에 대한 운영방향을 검토하였다.

  • PDF

저수지 경관자원을 활용한 야외수영장 개발사업의 투자효과 분석 (Analysis of Investment Effect on the Outdoor Swimming Pool Utilizing Reservoir's Amenity Resources)

  • 권용대;황준우
    • 농업과학연구
    • /
    • 제34권1호
    • /
    • pp.85-97
    • /
    • 2007
  • This study aimed at analyzing the economic effect of outdoor swimming pool investment using the reservoir's amenity resources. We focused on the identification of the amenity value of reservoir in the rural area and the economic evaluation for establishing This study aimed at analyzing the economic effect of outdoor swimming pool investment using the reservoir's amenity resources. We focused on the identification of the amenity value of reservoir in the rural area and the economic evaluation for establishing infrastructure such as swimming pool based on the reservoir's landscape value. To this end, we have conducted the case study on the outdoor swimming pool in connection with Go-Bok reservoir in Yeon-Gi county, Chungnam Province and estimated its income effect on the rural community by cost-benefit analysis method. The research results are as follows; 1) Outdoor swimming pool participants, with 11,581 visitors totaled to Yeon-gi county every year, was estimated to spend the worth of 58,446 thousand won paid for the agricultural product purchase and etc. 2) Internal rate return of the outdoor swimming pool project was estimated to 16.19%, which considered to be economically feasible comparing with 10% of current capital opportunity cost. Based on the results of this study, we suggest the following strategies for development of amenity value of swimming pool in connected with the reservoir; 1) Reservoir amenities should be well preserved even after construction of swimming pool lest losing amenity values while managing the facilities. 2) Measures to increase the marketing value of intangible reservoir's amenities through promotion should be established. 3) Effective program for more visitors with longer staying and more agricultural products sales should be designed.

  • PDF

계획예방정비에 따른 Two Way Bidding Pool 가격 변동 (Two Way Bidding Pool Price Change by Maintenance Schedule)

  • 맹근호;허돈;송광재;박종근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.596-598
    • /
    • 2003
  • 본 논문에서는 CBP 가격을 기반으로, TWBP시장의 가격을 분석하였다. KPX가 발표한 SMP와 수요예측자료로 누적입찰자료를 추정하었으며, 이를 이용하여 계획예방정비에 따른 TWBP가격 변동을 시뮬레이션 하였다.

  • PDF

열병합 발전기 수익 극대화를 위한 열전비 최적화 (Heat-Electric Power Ratio Optimization To Maximize Profit of a Cogeneration Power Plant)

  • 김군회;이재헌;문승재;장택순
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.381-384
    • /
    • 2008
  • This paper presents an operational technique to maximize profit of a cogeneration power plant. To minimize errors in a loss and gain analysis of a cogeneration power plant, the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry are taken into consideration. The objective is to optimize the heat-electric power ratio to maximize profit of a cogeneration power plant. Furthermore, the constrained bidding technique to optimize heat-electric power ratiocan be obtained. Profits from of a cogeneration power plant are composed of three categories, such as the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry. Profits of a cogeneration power plant are varied enormously by the operation modes. The profits are mainly determined by the amount of constrained heat generation in each trading time. And the three profit categories arecoupled tightly via the heat-electric power ratio. The result of this case study can be used as a reference to a cogeneration power plant under the power trading system considered in this case.

  • PDF

열병합 발전소의 운전경제성 분석에 관한 연구 (Analysis of Operational Economic Efficiency in a Cogeneration Power Plant)

  • 김군회;허진혁;문승재;이재헌
    • 플랜트 저널
    • /
    • 제5권1호
    • /
    • pp.40-44
    • /
    • 2009
  • This study presents an operational technique to maximize the profit of a cogeneration power plant under cost-based pool power market. In benefit side energy sale profit, heat sale profit, and supplementary fund profit for electric power industry are included and the changeable cost was considered in cost side. The profit of a cogeneration power plant is varied enormously by the operation conditions, and constraint conditions. The result of this case study can be used as a reference to a cogeneration power plant under the same power trading system.

  • PDF

인벤토리모델을 이용한 인지무선네트워크에서 스펙트럼풀링 (An Inventory Model-based Spectrum Pooling in Cognitive Radio Networks)

  • 변상선
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2014년도 추계학술대회
    • /
    • pp.338-341
    • /
    • 2014
  • 인지무선 (cognitive radio) 환경에서 2차사용자 (secondary user) 들의 일시적인 서비스 요구를 효과적으로 다룰 수 있는 스펙트럼풀링 (spectrum pooling) 기법이 최근 주목을 받고 있다. 스펙트럼풀링은 WSP (wireless service provider) 에 의해서 관리되며, 사용자의 요구가 있을 때, 금전적인 지불을 받고 스펙트럼을 2차사용자에게 대여해 주는 방식이다. 여기서, WSP는 가급적 많은 이윤을 남기기를 원한다. 이 논문에서 우리는 WSP가 유지하는 스펙트럼 풀 (pool) 을 확률 인벤토리모델 (probabilistic inventory model) 로 표현하고 2차사용자의 스펙트럼 요구가 정규분포를 따를 때, WSP가 비용을 최소화시키는 방향으로 인벤토리를 운영하는 전략을 제시한다. WSP가 지불해야하는 비용에는 일반적인 인벤토리 모델과 마찬가지로, 주문비용, 보관비용, 스톡아웃비용이다. 우리는 시뮬레이션을 통해, 고정된 인벤토리 레벨을 유지하는 것보다 확률 인벤토리모델에 의해 결정되는 레벨에 맞추어 유지하는 것이 총 소요비용을 절약할 수 있음을 보인다.

  • PDF