• Title/Summary/Keyword: Control of demand and supply

Search Result 338, Processing Time 0.029 seconds

Restarting Trains Under Moving Block Signaling - An Expert System Approach

  • K, K.-Wong;Akio, Katuki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.96.6-96
    • /
    • 2001
  • A high peak power demand at substations will result under Moving Block Signalling (MBS) when a dense queue of trains begins to start from a complete stop at the same time in an electrified railway system. This may cause the power supply interruption and in turn affect the train service substantially. In a recent study, measures of Starting Time Delay (STD) and Acceleration Rate Limit (ARL) are the possible approaches to reduce the peak power demand on the supply system under MBS. Nevertheless, there is no well-defined relationship between the two measures and peak power demand reduction (PDR). In order to attain a lower peak demand at substations on different traffic conditions and system requirements, an expert system is one of the possible approaches to procure the appropriate use of peak demand reduction measures ...

  • PDF

Recent Development of Drinking Water Quality Standard and its Application (음용수질 기준과 관리방안)

  • 권숙표
    • Journal of environmental and Sanitary engineering
    • /
    • v.7 no.2
    • /
    • pp.83-94
    • /
    • 1992
  • Recently water demand is increasing as the industry prospers. The increase of water demand is followed by the increase of wastewater discharge which pollutes rivers and ground water extensively. These rivers, reservoirs and ground water are sources for drinking water and their contamination affects the quality of water supply and other potable water. In Korea there are 776 water treatment plants which supply drinking water from main rivers or reservoirs. Rivers are the biggest water source for drinking water is being contaminated, the innovation of treatment process is needed. The construction and operation of water supply facilities is under the control of the Ministry of Construction and the water supply offices of cities and provinces. However, drinking water quality is under the control of the bureau of sanitation in the Ministry of Health and Social Affairs. There are 33 items in drinking water quality standards of Korea. Trihalomethanes, Selenium, Diazinone and other three of pesticides have been included lately, The Ministry of Health and Social Affairs is planning to enhance. the level of $VOC_S$(Vola-tile Organic Compounds) standard. Drinking water quality standard is the goal to protect the quality of supply water and ground water. In order to protect the source water from domestic or industrial water, technological improvement and adequate investment should be urgently made. The ultimate goal of drinking water quality is safety and health of consumers. The more stringent the standard are, the better the water quality will be. As the drinking water quality standards become more stringent this year, various and positive solutions by the authorities concerned must be prepared.

  • PDF

A Study on Keynese's Employment and Price Theory (케인즈의 고용 . 물가이론소고)

  • 박일근
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.12
    • /
    • pp.65-77
    • /
    • 1985
  • The mainpoints of General Theory is 1) the mainspring of economic activity is effective demand which can expand or control in relation to supply as a result of spontaneous decision by customer or government. 2) change in effective demand Produce change in output and employment in the same direction 3) which given productivity of labour the Vice level depend on the money supply affect the in downward direction 4) change in the money supply affect the economy through the rates of interest 5) the only automatic mechanism through which the economy can adjust itself to a deficiency of effective demand is the long process which unemployment reduces wage rates and consequently the demand for money and interest rates, above summarized contents are General Theory frame-work. The neo-classical macro general equilibrium theory, which has been reconstructed subsequent to Keyneses critism is treated the neo-classical macro-general equilibrium theory which inherits the classical theories of labour market and the aggregate production function, on demand side, it introduce the Keyneses macro-general equilibrium theory, which function through flexible movement of prices, wage and interest. Nowadays, Keynes General Theory is being developed into new dimension i, e. the macro-disequilibrium theory, and adequacy, and appropriateness of the theory and its significant contributions to modern economics are being reinterpreted and substantiated.

  • PDF

Supply Chain Ecosystem of Automotive Chip (차량용 반도체 공급망 생태계)

  • Chun, H.S.;Kim, H.T.;Roh, T.M.
    • Electronics and Telecommunications Trends
    • /
    • v.36 no.3
    • /
    • pp.1-11
    • /
    • 2021
  • In this study, we analyze the automotive chip ecosystem that recently caused the global supply shortage, and attempt to derive policy implications for us from the conclusion. Automotive chips are critical parts that control various systems so that a vehicle can drive itself or operate with electricity. The current shortage in supply and demand for automotive chips is due to the inconsistency between supply and demand between automotive chip companies and car manufacturers. To promote the automotive chip industry, new investment incentives, tax cuts, and human resource training are needed.

A Simple Power Management Scheme with Enhanced Stability for a Solar PV/Wind/Fuel Cell Fed Standalone Hybrid Power Supply using Embedded and Neural Network Controller

  • Thangavel, S.;Saravanan, S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1454-1470
    • /
    • 2014
  • This paper propose a new power conditioner topology with intelligent power management controller that integrates multiple renewable energy sources such as solar energy, wind energy and fuel cell energy with battery backup to make best use of their operating characteristics and obtain better reliability than that could be obtained by single renewable energy based power supply. The proposed embedded controller is programmed for maintaining a constant voltage at PCC, maximum power point tracking for solar PV panel and WTG and power flow control by regulating the reference currents of the controller on instantaneous basis based on the power delivered by the sources and load demand. Instantaneous variation in reference currents of the controller enhances the controller response as it accommodates the effect of continuously varying solar insolation and wind speed in the power management. The power conditioner uses a battery bank with embedded controller based online SOC estimation and battery charging system to suitably sink or source the input power based on the load demand. The simulation results of the proposed power management system for a standalone solar/WTG/fuel cell fed hybrid power supply with real time solar radiation and wind velocity data collected from solar centre, KEC for a sporadically varying load demand is presented in this paper and the results are encouraging in reliability and stability perspective.

A Proposal to Control System and the Problems of the Problems of the Report about Supply and Demand for Medical Technicians and Management Policy ("의료기사인력수급에 관한 보고서"의 문제점과 관리제도의 개선방안)

  • Kim, Sang-Hyun;Lim, Yongmoo
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.13 no.4
    • /
    • pp.25-30
    • /
    • 2008
  • Purpose: In this paper, we have analyzed the problems of the Oh's report which is used to the basic data for supply and demand of medical technicians and studied a proposal for improvement to control system and supply and demand of korean optometrists. Methods: We have analyzed errors of Oh's report including supply and demand for medical technicians and management policy, expecting number for future optician, inaccurate estimation by limited data (employment rate, retirement rate, mortality rate) and an incorrect method of measurement for future supply and demand. Results: Oh's report showed the 18% error for estimation of supply which exclude the irregular entrance students. The estimation of supply was calculated by graduation rate 62.6% (college and University of Technology are 78.9% and 85.98% respectively), employment rate 65.8% (the average employment between 2002 and 2007 is 73.96%) and retirement rate is 2.3% (the retirement of pharmacists is 1.3%) but it showed the significant differences to objective data. For estimate the suitable ratio of optometrists to the population, the ratio use of medical facilities by an age group was used, and suggested spectacle wearers 1,280 persons (populations 2,928 persons) per optometrist but the different from reference of Germany (4,706 persons), America (1,789 persons) and Korea (1,825 persons/an optometrist) are applied to estimation on supply. This report applied the low employment rate and argued that maintain the present situation, but claimed that utilize unemployment persons. The above result has induced double weighting effect on estimation of supply. Conclusions: To solve the related problems of supply and demand, we have to make a search for exact data and optimum application model, have to take an example of nation similar job category as Germany and the research result of the job satisfaction into consideration. After we get the integrated research result, we must carried out the policy with fairness and balance for the estimation of supply and demand. Therefore exact research is required prior to beginning policy establishment, government and related group have to make a clear long-term plan and permanent organization for medical technician to establish supply and demand of medical technician.

  • PDF

Impact of Population Growth on Labor Force and Employment in Korea; Transition and Prospect (장기인구성장과 노동력 수급 전망)

  • 박래영
    • Korea journal of population studies
    • /
    • v.8 no.1
    • /
    • pp.47-65
    • /
    • 1985
  • Three stages of population growth during last forty years affected differently to the labor force and employment in Korea. The first impact of rapid population growth on the labor force occured after the end of World War II. Sudden growth of population due to repartriation and refugees directly increased the labor force. Deteriorating labor market conditions were caused not only by the explosive labor supply but also by the shortage of employment opportunities due to a lack of productive facilities. This severe excess supply of labor continued until the early 196Os. Population growth in the second stage which caused by high fertility during the post Korean War baby boom period induced an eventual increase in the labor supply with time lag of more than fifteen years. Younger persons born during baby boom period were flooded the labor market. Fortunately, job opportunities were expanded more rapidly than the labor force supply because high rates of economic growth and speedy industrialization were continued until the later half of 1970s. Unemployment, therefore, decreased dramatically during this period. The effect of third stage which is characterized as mitigated population growth due to birth control has appeared in the labor market since late 1970s. The growth rate of labor force has been going down and the proportion of younger workers was also been decreasing. From the early 1980s, furthermore, partial disharmony between supply of and demand for the younger workers is closing up. Less educated younger workers who works at low wage are lacking while more educated youngers who want to work at high wage are being excess, because a lot of younger prefer higher education rather than productive job. It is expected that the structural inharmony will be diversified in the future in Korea. The labor force will be changed to middleaged, highly educated and womenized till year 2000, and, after then, to old-aged. On the demand side, industries and jobs will transferred to be labor-saving and soft. These structural changes of labor supply and demand will not matching in time. Aggregate supply of labor force will be steadily increasing more rapidly than aggregate demand for labor until year 2000, and this trend will continue to the first one or two decades of the 2lth century because the persons born dufing the baby boom pariod are being eligible couples in recent. Therefore, conclusion is that appropriate manpower development policy as well as sustained birth control policy is necessary for harmonizing the structural unbalance and the disequilibrium between aggregate labor supply and demand in the future.

  • PDF

Development of Water Demand Forecasting Simulator and Performance Evaluation (단기 물 수요예측 시뮬레이터 개발과 예측 알고리즘 성능평가)

  • Shin, Gang-Wook;Kim, Ju-Hwan;Yang, Jae-Rheen;Hong, Sung-Taek
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.4
    • /
    • pp.581-589
    • /
    • 2011
  • Generally, treated water or raw water is transported into storage reservoirs which are receiving facilities of local governments from multi-regional water supply systems. A water supply control and operation center is operated not only to manage the water facilities more economically and efficiently but also to mitigate the shortage of water resources due to the increase in water consumption. To achieve the goal, important information such as the flow-rate in the systems, water levels of storage reservoirs or tanks, and pump-operation schedule should be considered based on the resonable water demand forecasting. However, it is difficult to acquire the pattern of water demand used in local government, since the operating information is not shared between multi-regional and local water systems. The pattern of water demand is irregular and unpredictable. Also, additional changes such as an abrupt accident and frequent changes of electric power rates could occur. Consequently, it is not easy to forecast accurate water demands. Therefore, it is necessary to introduce a short-term water demands forecasting and to develop an application of the forecasting models. In this study, the forecasting simulator for water demand is developed based on mathematical and neural network methods as linear and non-linear models to implement the optimal water demands forecasting. It is shown that MLP(Multi-Layered Perceptron) and ANFIS(Adaptive Neuro-Fuzzy Inference System) can be applied to obtain better forecasting results in multi-regional water supply systems with a large scale and local water supply systems with small or medium scale than conventional methods, respectively.

The Development of Map Supply System Based on Web (웹 기반 지도공급 시스템 개발)

  • Park, Ki-Surk;Park, Kyeong-Sik
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.17 no.2
    • /
    • pp.123-131
    • /
    • 2009
  • The telecommunication technology in the 21st century has come up to the standard which could transmit various spatial information by means of on-line and the printing technology using computers has been on a par with presswork in quality. In addition, map users also would like to get various spatial information through on-line directly or indirectly. None the less, the supply system of national base map in our country has maintained the off-line sales method. It is owing to this reason that the nation's supply system has shown a high degree of inefficiency from the viewpoint of the inventory control, rapidity, and economical efficiency as compared with the on-line sales system in the developed countries. This study tried to analyze some problems of the present supply system in order to build up the foundation of the efficient map supply system and also developed the system such as On-demand maps, on-line paying and sales, inventory control, meta dat establishment, and security module, etc. This study tried to analyze some problems of the present supply system in order to build up the foundation of the efficient map supply system and also developed the system such as On-demand maps, on-line paying and sales, inventory control, meta dat establishment, and security module, etc.

  • PDF

Development of Supply Capability Calculation and Prediction Technology for Generator (발전기 공급능력 산정 및 예측 기술개발)

  • Kim, Euihwan;An, Youngmo;Hong, Eunkee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.425-431
    • /
    • 2016
  • Supply Capability of the generator, if the maximum demand occurs, refers to the maximum power that can be stably supplied and it is possible to maintain stable power supply to be greater than actual load. However, unexpected power demand and reduction in supply Capability due to stop of unexpected generator in operation can temporarily make a big chaos in power system. In fact, due to a lack of power supply Capability in the country, enforced emergency load adjustment to the September 15, 2011, the circulation power outage has occurred in several cities. As the result, interrupted operation of the elevator and stopped hospital medical equipment led to a great deal of trouble to people's lives, causing a social problem. At that time, it was found that a failed frequency control because of smaller actual supply Capability than that of predicted. The difference was about 1,170 MW with Gas turbine power plant. By accurately calculating the generator supply capability, we can not only grasp the power reserve rate, but also correspond to the time of power supply instability.