• Title/Summary/Keyword: Contract control

Search Result 247, Processing Time 0.023 seconds

Bid-based Direct Load Control Framework Under Electricity Markets (전력시장 환경하에 입찰기반의 직접부하제어 운영방안)

  • Lee, Ho-Chul;Song, Sung-Hwan;Yoon, Yong-Tae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.3
    • /
    • pp.455-461
    • /
    • 2009
  • This paper proposes Direct Load Control(DLC) operation scheme using a bidding system and the methodology to value proper quantity decided by the DLC program, which is a kind of resources for stabilization of electricity market price during peak times by managing consumer electricity demand. Since DLC program in Korea is based on the contract with the customers participating in this program, it is difficult to anticipate voluntary participation. That is, incentive for participants in DLC program is insufficient. To cope with this point, it is necessary to develop a new market mechanism and market compatible operation scheme for DLC programs. DLC market mechanism is deemed to be equipped with iterative bidding system, independent operation from energy market, and interactive with bidding information on energy market. With this market mechanism, it is important to find the optimal operation point of DLC allowing for the factors of stabilizing the electricity market price and compensating DLC implementation. This paper focuses on the mathematical approaches for the bid-based DLC operation scheme and examines several scenarios for the following technical justifications: 1) stabilization of electricity market price during peak times, 2) elasticity of demand.

Automatic Control of Fraction of Inspired Oxygen in Neonatal Oxygen Therapy using Fuzzy Logic Control

  • Chanyagorn, Pornchai;Kiratiwudhikul, Phattaradanai
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.5 no.2
    • /
    • pp.107-116
    • /
    • 2016
  • Premature babies of less than 37 weeks gestation might require oxygen therapy as an integral part of treatment and respiratory support. Because of their under-developed lungs, these so-called "preemies" might contract respiratory distress syndrome (RDS). To treat RDS, neonatal oxygen therapy is administered, where controlled oxygen gas is measured as a fraction of inspired oxygen ($FiO_2$). However, exposure to high oxygen content during long treatment could cause oxygen intoxication, which might cause permanent blindness due to retinopathy of prematurity (ROP), whereas insufficient oxygen exposure could cause severe hypoxia. A doctor would use oxygen saturation ($SpO_2$) data and prescribe a dose of $FiO_2$ to maintain $SpO_2$ within a suitable range. One objective is to maintain $SpO_2$ within the acceptable range using $FiO_2$ that is as low as possible. Adjustment of $FiO_2$ would normally be done by nurses every 15 to 30 minutes, which might not be safe in many situations. An error in $FiO_2$ adjustment during a manual procedure could be as large as +/- 2.5%. This paper presents a system that can determine an $FiO_2$ value suitable to the current $SpO_2$ and that automatically adjusts $FiO_2$ with an error clearance of +/- 0.25%.

A Web Server Load Balancing Mechanism for Supporting Service Level Agreement (SLA를 지원하는 웹 서버 부하 분산 기법)

  • Go Hyeon-Joo;Park Kie-Jin;Park Mi-Sun
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.8
    • /
    • pp.505-513
    • /
    • 2006
  • To satisfy SLA(Service Level Agreement) contract between a client and a service provider, the client requests are classified and processed by priorities. In providing differentiated service, a request from a client who has low priority can be dealt with less important. In this paper, we study static and dynamic partitioning mechanism of web servers and also admission control policy for multiclass request distribution. Through simulation experiments, we analyze web server throughput and response time considering SLA.

Effect of Cold Stress on Myocardium of Aging Rat (Cold Stress가 노화(老化) 흰쥐 심근(心筋)에 미치는 영향(影響))

  • Kim, Jeong-Ki;Chung, Hyeung-Jae;Lee, Yong-Deok;Park, Won-Hark
    • Applied Microscopy
    • /
    • v.28 no.1
    • /
    • pp.21-38
    • /
    • 1998
  • The present study was performed to determine the effect of cold stress on myocardium of aging rat. Control groups, which aged 6, 12 and 24 months, were compared with age-matched experimental groups that were exposed to moderate cold stress for a hours daily in a week at laboratory cold room $(4{\pm}1^{\circ}C)$. The histological, histochemical and ultrastructural changes of myocardium were observed. The results were summarized as follow: 1. Age-dependent histological change of control groups was observed the formation of contraction band in 24months aged group. The experimental groups submitted to cold stress showed a similar change pattern as seen in control groups. However, the degree of change in the experimental groups was significantly larger than that of control groups. In the 34 months aged group the formation of hypercontraction band was observed. 2. Regarding age-dependent histochemical changes of control groups, we observed the increase activities of PAS and Masson's trichrome. In experimental groups the activities of PAS and Masson's trichrome were also increased with age. Compare with control group, the activities of PAS was increased but the activities of Masson's trichrome was decreased. 3. Age-dependent ultrastructural changes on vacuolization, lysosome were observed. In control groups the structural changes occur at 12 months. The accumulation of lipofuscin, contraction band, hypercontraction band and a component of connective tissue were observed in 24 months. However, the degree of change in the experimental groups was significantly larger than that of control groups. In contract, the myelin body in intercalated discs was observed in 24 months of experimental groups.

  • PDF

Several Issues regarding Article 79 (Exemption) of the U.N. Convention on Contracts for the International Sale of Goods(CISG) (국제물품매매협약(CISG) 제79조(면책)와 관련한 몇 가지 쟁점)

  • KIM, Son-Guk
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.67
    • /
    • pp.1-21
    • /
    • 2015
  • U. N. Convention on Contracts for the International Sale of Goods (hereinafter the 'CISG' or the 'Convention') has been in force more than 37 years. The CISG responds to the need for uniform sales law. First of all, the biggest barrier against the uniformity in sales law is so-called "homeward trend". Professor Honnold, who served as secretary of UNCITRAL during the time in which the CISG was developed, pointed out the danger of "homeward trend" like this in his Article. "One threat to international uniformity in interpretation is a natural tendency to read the international text through the lenses of domestic law." CISG Article 79 is the principal provision governing the extent to which a party is exempt from liability for a failure to perform any of his obligations due to an impediment beyond his control. So-called 'Manfred Forberich' decision regarding the article 79 represents the most extreme example of what is likely the most dangerous error that tribunals applying the CISG can make. CISG Article 79 only governs impossibility of performance, and there is a controversy whether a disturbance which does not fully exclude performance, but it considerably more difficult or onerous(hardship, change of circumstances, economic impossibility) can be considered as an impediment. Unlike PICC and PECL, the CISG governs contract of sale. Therefore, events such as a sudden increase in the price of raw materials or a dramatic devaluation of currency, will not allow the seller to avoid his liability for non-delivery of the goods or to require renegotiation of the terms of the contract of sale. We should bear in mind that the CISG should be interpreted and applied in the context of the CISG itself.

  • PDF

Development of a Ubiquitous Vision System for Location-awareness of Multiple Targets by a Matching Technique for the Identity of a Target;a New Approach

  • Kim, Chi-Ho;You, Bum-Jae;Kim, Hag-Bae
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.68-73
    • /
    • 2005
  • Various techniques have been proposed for detection and tracking of targets in order to develop a real-world computer vision system, e.g., visual surveillance systems, intelligent transport systems (ITSs), and so forth. Especially, the idea of distributed vision system is required to realize these techniques in a wide-spread area. In this paper, we develop a ubiquitous vision system for location-awareness of multiple targets. Here, each vision sensor that the system is composed of can perform exact segmentation for a target by color and motion information, and visual tracking for multiple targets in real-time. We construct the ubiquitous vision system as the multiagent system by regarding each vision sensor as the agent (the vision agent). Therefore, we solve matching problem for the identity of a target as handover by protocol-based approach. We propose the identified contract net (ICN) protocol for the approach. The ICN protocol not only is independent of the number of vision agents but also doesn't need calibration between vision agents. Therefore, the ICN protocol raises speed, scalability, and modularity of the system. We adapt the ICN protocol in our ubiquitous vision system that we construct in order to make an experiment. Our ubiquitous vision system shows us reliable results and the ICN protocol is successfully operated through several experiments.

  • PDF

(A) Study on Contracting Parties' Obligations in International Leasing Agreements - Focus on Draft Common Frame of Reference(DCFR) - (국제리스계약상 당사자의 의무에 관한 소고 - DCFR(유럽계약법 공통참조기준 초안)을 중심으로 -)

  • Oh, Won Suk;Choi, Young Joo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.63
    • /
    • pp.111-132
    • /
    • 2014
  • This paper analyzed the obligations of the parties entering into an international leasing agreements, focusing on the Draft Common Frame of Reference (DCFR) Book IV, Part B. The lessor's obligations are as follows. i) The lessor must deliver goods to the lessee by the due date of delivery so that the lessee can use the goods on the starting date of the lease agreement. ii) The lessor must conform with the contract so that the goods meet the purpose of the contract at the start of the lease agreement and throughout the period of the lease agreement. iii) If the lessee returns the goods upon the termination of the lease agreement, the lessor must cooperate with the lessee. The lessee's obligations are as follows. i) The lessee must pay rent, which is the most critical obligation of the lessee. ii) The lessee must cooperate with the lessor so that the lessor can perform the obligation to deliver the goods and accept the goods of which the lessee shall take control. iii) The lessee shall perform fiduciary duties while it uses and makes profits from the goods, and when the lessor cannot take any measure to protect the object, the lessee must prevent damage. Further, if the lessor pays expenses that are not considered necessary expenses, the lessor may not be reimbursed and must accept the goods after delivery to preserve them. iv) The lessee must give notice to the lessor if there is a possibility that a third party can claim rights to goods or infringe upon the lessor's ownership while using the goods. v) At the end of the lease period, the lessee must return the goods to the lessor.

  • PDF

A Suggestion of Claims Preparation Procedure in the Public Sector (공공건설사업에서 업무단계별 클레임준비 절차)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.54-62
    • /
    • 2001
  • Although claims and disputes may be never avoided in construction industry, until 1998, there are no systematic claims in the public sector in Korea. But, because of IMF, Contractors have been recognized that cost management is essential factor and contractual right can be demanded against the Public Orderer. Many affirmative effect such as, appearance of new professional service, prevention of lower quality construction, restrain of unnecessary budget expenditure, arrangement of duplicated or triplicated liability and revision of unnecessary administrative control may be anticipated through alleging claims, but in site representative manager and construction company may have ambiguous fear, somebody tried to allege claims. Therefore, to activate systematic construction claims, 32 public construction project claims alleged by contractors from 1998 to 2001 were analyzed, inactivated reasons of claims were examined and contractor's action plan to allege claims was suggested in this paper.

  • PDF

- A Case Study on OOP Component Build-up for Reliability of MRP System - (MRP 시스템의 신뢰성을 위한 객체재향 컴포넌트 개발 사례)

  • Seo Jang Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.3
    • /
    • pp.211-235
    • /
    • 2004
  • Component based design is perceived as a key technology for developing advanced real-time systems in a both cost- and time effective manner. Already today, component based design is seen to increase software productivity, by reducing the amount of effort needed to update and maintain systems, by packaging solutions for re-use, and easing distribution. Nowdays, a thousand and one companies in If(Information Technology) industry such as Sl(System Integration) and software development companies, regardless of scale of their projects, has spent their time and endeavor on developing reusable business logic. The component software is the outcome of software developers effort on overcoming this problem; the component software is the way propositioned for quick and easy implementation of software. In addition, there has been lots of investment on researching and developing the software development methodology and leading If companies has released new standard technologies to help with component development. For instance, COM(Component Object Model) and DCOM(Distribute COM) technology of Microsoft and EJB(Enterprise Java Beans) technology of Sun Microsystems has turned up. Component-Based Development (CBD) has not redeemed its promises of reuse and flexibility. Reuse is inhibited due to problems such as component retrieval, architectural mismatch, and application specificness. Component-based systems are flexible in the sense that components can be replaced and fine-tuned, but only under the assumption that the software architecture remains stable during the system's lifetime. In this paper, It suggest that systems composed of components should be generated from functional and nonfunctional requirements rather than being composed out of existing or newly developed components. about implements and accomplishes the modeling for the Product Control component development by applying CCD(Contract-Collaboration Diagram), one of component development methodology, to MRP(Material Requirement Planning) System

On Scheduling Real-Time Traffic under Controlled Load Service in an Integrated Services Internet

  • Shi, Hongyuan;Sethu, Harish
    • Journal of Communications and Networks
    • /
    • v.5 no.1
    • /
    • pp.73-81
    • /
    • 2003
  • The controlled load service defined within the IETF's Integrated Services architecture for quality-of-service (QoS) in the Internet requires source nodes to regulate their traffic while the network, in combination with an admission control strategy, provides a guarantee of performance equivalent to that achieved in a lightly loaded network. Packets sent in violation of the traffic contract are marked so that the network may assign them a lower priority in the use of bandwidth and buffer resources. In this paper, we define the requirements of a scheduler serving packets belonging to the controlled load service and present a novel scheduler that exactly achieves these requirements. In this set of requirements, besides efficiency and throughput, we include an additional important requirement to bound the additional delay of unmarked packets caused due to the transmission of marked packets while dropping as few marked packets as possible. Without such a bound, unmarked packets that are in compliance with the traffic contract are not likely to experience delays consistent with that in al lightly loaded network. For any given desired bound ${\alpha}$ on this additional delay, we present the CL(${\alpha}$) scheduler which achieves the bound while also achieving a per-packet work complexity of O(1) with respect to the number of flows. We provide an analytical proof of these properties of the CL(${\alpha}$) scheduler, and we also verify this with simulation using real traces of video traffic. The scheduler presented here may be readily adapted for use in scheduling flows with multi-level priorities such as in some real-time video streams, as well as in other emerging service models of the Internet that mark packets to identify drop precedences.