• Title/Summary/Keyword: Contract Price

Search Result 299, Processing Time 0.021 seconds

A Study for Defense Acquisition System Improvement (국방무기체계 획득절차 발전방향 - 미국 국방획득절차 개선노력을 중심으로 -)

  • Go, Sim-Jae
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.86-104
    • /
    • 2005
  • During the 'Cold War', DoD had focused on the high performance and timely acquisition which enabled quick field out the superior weapons than the enemy regardless of acquisition cost. But, after the cold war, the focus has been changed to the 'cost effective acquisition' of weapon systems because of tremendous investment cost & economic theory. The U.S. DoD has been tried to make 'the most effective acquisition system'(AR, Acquisition Reform) from mid-80's with their enough experienced program data, and as a result, they had launched the new acquisition procedure - DoD 5000 series - in 1996. DoD is continuously doing the study and making several improvements on the procedure after it had been once announced. On Oct 30. 2002, DoD noticed that they cancelled the DoD 5000 series documents(5000.1, 5000.2, 5000.2-R) and 5000.2-R will be reissued as a guide. The most recent version which focused on 1) evolutionary acquisition and spiral development, 2) procedure for future technology systems including software and IT, 3) supplement on the area of efficiency, flexibility, creativity and innovation of old system was issued by May 12. 2003. This article suggests a 'good idea' based on the reviewing of these DoD efforts for our defense acquisition regulation and procedure to go. It includes the CAIV concept application, IPT utilization, T&E method, cost or price based contract etc-all for the effective acquisition.

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

Economic Evaluation of National Highway Construction Projects using Real Option Pricing Models (실물옵션 가치평가모형을 이용한 국도건설사업의 경제적 가치 평가)

  • Jeong, Seong-Yun;Kim, Ji-Pyo
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.75-89
    • /
    • 2014
  • PURPOSES : This study evaluates the economic value of national highway construction projects using Real Option Pricing Models. METHODS : We identified the option premium for uncertainties associated with flexibilities according to the future's change in national highway construction projects. In order to evaluate value of future's underlying asset, we calculated the volatility of the unit price per year for benefit estimation such as VOTS, VOCS, VICS, VOPCS and VONCS that the "Transportation Facility Investment Evaluation Guidelines" presented. RESULTS : We evaluated the option premium of underlying asset through a case study of the actual national highway construction projects using ROPM. And in order to predict the changes in the option value of the future's underlying asset, we evaluated the changes of option premium for future's uncertainties by the defer of the start of construction work, the contract of project scale, and the abandon of project during pre-land compensation stages that were occurred frequently in the highway construction projects. Finally we analyzed the sensitivity of the underlying asset using volatility, risk free rate and expiration date of option. CONCLUSIONS : We concluded that a highway construction project has economic value even though static NPV had a negative(-) value because of the sum of the existing static NPV and the option premium for the future's uncertainties associated with flexibilities.

Analyzing of Solar Power Generation Cost-Benefit Using Idle Sites(Parking Lot & Rooftop): Focusing on Environmental Benefit and Social Benefit (주차장·옥상 유휴부지를 활용한 태양광발전 비용편익 분석: 환경·사회 편익 중심으로)

  • Ko, Hyung-Do;Kim, Jeong-In;Ahn, Kyoung-Jin
    • Asia-Pacific Journal of Business
    • /
    • v.13 no.2
    • /
    • pp.139-154
    • /
    • 2022
  • Purpose - This study aims to analyzing of solar power generation cost-benefit. Design/methodology/approach - We analyzed whether there is economic feasibility by selecting parking lots and idle sites located in four areas of Seoul, Gyeonggi, Chungcheong, Jeolla, and Gyeongsang areas nationwide, and analyzing site conditions and installation capacity. Findings - According to the results of the analysis, it was found that there is low profitability in Seoul, Gyeonggi and Chungcheong regions, where the solar radiation was not excellent even if REC is selected through the contract market. However, it is necessary to analyzed the economical validity the profitable validity including environmental benefits (greenhouse gas reduction, NOx, SOx reduction effect) and social benefits (renewable power supply) that is analyzed by income and operating costs which is occurred from electricity sales and REC sales when installing solar power generation facilities. Research implications or Originality - In this study, economic feasibility was evaluated additionally in consideration of environmental and social benefits. In conclusion, it was shown that businesses are not economical when considering only simple financial aspects are also sufficiently economical when it is considering environmental and social benefits.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

School Dieticians' Perception of Seafood Ingredient Pricing in School Food-Service in Seoul (학교급식 수산물 가격 결정에 대한 서울 지역 학교영양(교)사의 인식)

  • Cha, Myeong Hwa;Seo, Sang Rok;Moon, Min Ji;Yang, Ji Hye;Sung, Bo Mi;Jung, Hyun Suk;Ryu, Kyung
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.43 no.11
    • /
    • pp.1766-1773
    • /
    • 2014
  • The purpose of this research was to scrutinize dieticians' perspective of seafood ingredients prices in school food-service. Suppliers' contract status, seafood ingredient usage and satisfaction, expectations regarding prices of seafood ingredients, and willingness to pay when HACCP is taken into account were studied. Through random sampling, the survey was conducted on 231 dieticians in 11 different educational districts and 12 elementary, six middle, and three high schools. Ultimately, 142 survey responses were taken into account. Data analysis was performed using SPSS v15.0 by descriptive analysis, ${\chi}^2$-test, and t-test. For contracts regarding seafood ingredients, competitive contracts composed 79.7%. Exactly 42.1% responded that contracts were breached, and 60.1% testified that product returns were due to excessive glazing of ingredients. The satisfaction rate of 'hygiene & sanitation of product' was the highest, whereas 'price of product' was the lowest. For 'recontracting intention', 'informal purchasing' showed higher rates compared to 'competitive bidding'. Reflecting upon the six main price factors, 'designation and maintenance of HACCP', 'price of raw seafood ingredients', 'processing costs', 'margin', 'logistic costs', and 'cost of standardizing seafood ingredients', dieticians' perceived 'impact on the anticipated price' on total cost was lower than present counterparts. This implicates that 'impact on the present price' of the six price factors is too excessive, suggesting that many dieticians are unsatisfied with the current prices of seafood ingredients. Furthermore, 52.8% of dieticians stated that the maximum additional payment of HACCP seafood ingredients should be less than 5%. Consequently, this research serves as basic information for reasonable pricing of seafood ingredients and contributes to increased seafood usage by school food-services.

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

The Impacts of the Optimal Non-Financial Contractual Structure on the Leverage Ratio in Project Finance (자원개발 프로젝트 파이낸싱 위험완화 연구: 사업위험에 따른 비재무적 계약의 레버리지 효과 분석)

  • Lee, Changmin;Choi, Bongseok;Kim, Seon Tae
    • Environmental and Resource Economics Review
    • /
    • v.23 no.4
    • /
    • pp.643-665
    • /
    • 2014
  • We study the optimal policy of the contracual arrangement in raising the debt-to-equity ratio for oil, gas and mining project finance deals. We investigate the impact of the optimal contractual relationship between counterparties on the soundness of projects, differing in output price volatility and country risk. Key findings are: first, the existence of EPC sponsors and off-takers generally raises the debt-to-equity ratio. In particular, EPC sponsors and off-taking sponsors jointly mitigate the credit risk caused by counntry risk. Seocond, off-taking and EPC contracts jointly help mitigate the credit risk caused by the country risk, rather than the price volatility. Indeed, the contractual structure raises the debt-to-equity ratio.

Real Estate Asset NFT Tokenization and FT Asset Portfolio Management (부동산 유동화 NFT와 FT 분할 거래 시스템 설계 및 구현)

  • Young-Gun Kim;Seong-Whan Kim
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.9
    • /
    • pp.419-430
    • /
    • 2023
  • Currently, NFTs have no dominant application except for the proof of ownership for digital content, and it also have small liquidity problem, which makes their price difficult to predict. Real estate usually has very high barriers to investment due to its high pricing. Real estate can be converted into NFTs and also divided into small value fungible tokens (FTs), and it can increase the the volume of the investor community due to more liquidity and better accessibility. In this document, we implement and design a system that allows ordinary users can invest on high priced real estate utilizing Black Litterman (BL) model-based Portfolio investment interface. To this end, we target a set of real estates pegged as collateral and issue NFT for the collateral using blockchain. We use oracle to get the current real estate information and to monitor varying real estate prices. After tokenizing real estate into NFTs, we divide the NFTs into easily accessible price FTs, thereby, we can lower prices and provide large liquidity with price volatility limited. In addition, we also implemented BL based asset portfolio interface for effective portfolio composition for investing in multiple of real estates with small investments. Using BL model, investors can fix the asset portfolio. We implemented the whole system using Solidity smart contracts on Flask web framework with public data portals as oracle interfaces.