• Title/Summary/Keyword: Contract Completion

Search Result 43, Processing Time 0.018 seconds

Policy Study on Appropriateness of Safety Check Costs in Construction Projects - Focusing on Industrial Safety and Health Act - (건설공사 안전점검대가의 적정성에 대한 정책적 고찰 - 산업안전보건법을 중심으로 -)

  • Kim, Byeong-Cheol;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.4
    • /
    • pp.747-757
    • /
    • 2017
  • Of safety check regulation, 'Construction Technology Promotion Act' and 'Special Act on the Safety Control of Public Structures' contain provisions about the content of safety in construction works and the items of safety checks in the maintenance aspect and thus contribute to accident prevention in the construction industry. Of the regulations responsible for the practical safety of workers, the safety check regulation of Ministry of Employment and Labor demand for safety check from the start of construction based on an agreement with a concerned agency to the completion of construction solely based on 'Guidance Standards for the Specialized Disaster Prevention Instruction in Article 32 of Occupational Safety and Health Act' and 'Appropriation and Usage Standards of Safety and Health Management Costs in the Construction Industry'. There is, however, a huge gap, as well, in them according to client agencies. In small construction sites ordered by a private organization, checks are done formally with no detailed regulations. As a result, the costs of checks continue to drop with only the contract kept intact. This study examined the forms of safety checks practically done in the Jeju region, distinguished and compared them by the construction costs, calculated proper costs based on each construction act, and further proposed improvement measures for the detailed regulations.

User-independent blockchain donation system

  • Sang-Dong Sul;Su-Jeong Lee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.11
    • /
    • pp.113-123
    • /
    • 2023
  • This paper introduces the Cherry system, a user-independent blockchain donation system. This is a procedure that is delivered to the beneficiary's bank account through a virtual account when a donor makes a donation, so there is no difference from the existing donation delivery method from the user's point of view However, within the blockchain, Cherry Points, a virtual currency based on the user ID, are issued and delivered to the beneficiary, while all transactions and the beneficiary's usage history are managed on the blockchain. By adopting this method, there was an improvement in blockchain performance, with transaction processing exceeding 1,000 TPS in typical transaction condition and service completion within 21.3 seconds. By applying the automatic influence control algorithm to this system, the influence according to stake, which is an individual donation, is greatly reduced to 0.3 after 2 months, thereby concentrating influence could be controlled automatically. In addition, it was designed to enable micro tracking by adding a tracking function by timestamp to the donation ledger for each individual ID, which greatly improved the transparency in the use of donations. From a service perspective, existing blockchain donation systems were handled as limited donation delivery methods. Since it is a direct service in a user-independent method, convenience has been greatly improved by delivering donations in various forms.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.