• Title/Summary/Keyword: Continuous & Periodic review policy

검색결과 2건 처리시간 0.014초

Setup cost와 Backorder rate를 고려한 확률적 재고모형에 관한 연구 (The study of stochastic inventory model with setup cost and backorder rate)

  • 유승우;서창현;김경섭
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 2003년도 춘계학술대회논문집
    • /
    • pp.129-134
    • /
    • 2003
  • In this paper, we determine optimal reduction in the lead time and setup cost for some stochastic inventory models. And we propose more general model that allow the backorder rate as a control variable. We first assume that the lead time demand follows a normal distribution. And we assume that the backorder rate is dependent on the length of lead time through the amount of shortages. The stochastic models analyzed in this paper are the classical continuous and periodic review policy models with a mixture of backorders and lost sales. For each of these models, we provide a sufficient conditions for the uniqueness of the optimal operating policy. We also develop algorithms for solving these models and provide illustrative numerical examples.

  • PDF

2계층 분배시스템에서 혼합재고정책을 이용한 적정재고수준 결정에 관한 연구 (Determining the Proper Level of Spare Parts using the CSP and (r,Q) Policies in a Two-Echelon Distribution System)

  • 정석재;이정학;김경섭
    • 대한안전경영과학회지
    • /
    • 제9권4호
    • /
    • pp.121-127
    • /
    • 2007
  • CSP(Concurrent Spare Parts) is supplied with the procurement of new equipment or weapon system and is used to sustain the equipment without resupply during the initial coverage period. This study is concerned with a problem of determining the near optimal inventory level of the spare parts, especially Concurrent Spare Parts. For this, we utilize the mixed periodic and continuous review polices considering the CSP and (r,Q) Policies concurrently in a two-echelon distribution system. We propose the mathematical model to minimize the total cost which is composed with ordering cost, purchasing cost, holding cost, and stickout cost. If the mixed policy is compared to other policies(CSP, (r,Q)), the proposed methodology performs well and is best policy in the equipment maintenance expenses.