• 제목/요약/키워드: Containment Building

검색결과 157건 처리시간 0.022초

건설분야 전천후 공법 적용방안 (A Method of All-Weather Construction Application in Construction Sites)

  • 이한우;이병수;방창준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.193-194
    • /
    • 2012
  • Construction work is affected by the weather; e.g. snowfall, rainfall and low-high ambient temperature, especially at a site in a severe climate. The influence of the weather is one of the possible reasons for delays in a construction schedule and quality deterioration. To protect the worksite from severe weather conditions, the temporary roof and wall could be installed on the outside of main structures designed in advance and the temporary structures could be took down after a period use. The greater coverage all-weather construction method is applied, the larger the effect. so, it is important and needs that the temporary roof and wall can be widely applied, designed to effectively about structure and layout.

  • PDF

철근콘크리트 격납건물의 비선형 해석을 위한 쉘 유한요소 (Shell Finite Element for Nonlinear Analysis of Reinforced Concrete Containment Building)

  • 전영선;이홍표
    • 한국전산구조공학회논문집
    • /
    • 제19권1호
    • /
    • pp.93-103
    • /
    • 2006
  • 격납건물은 원자로 사고발생시 방사능물질의 외부 유출을 막는 최후의 방벽이므로 가동 중 원전의 격납건물에 대한 안전성평가는 반드시 수행되어야 된다. 이러한 맥락에서 이 논문은 원전 격납건물의 비선형해석을 위해 탄소성 모델을 바탕으로 개발된 8절점 가변형도 쉘 요소와 이를 이용한 구조물의 비선형해석에 대하여 기술하였다. 비선형해석을 위해 콘크리트의 압축거동에 Drucker-Prager 파괴기준을 적용하였고 파괴포락선의 형상을 결정짓는 재료매개변수는 이축응력 실험으로부터 도출하였다. 개발된 쉘 유한요소는 퇴화 고체기법과 횡 전단변형도를 고려하기 위하여 Reissner-Mindlin(RM)가정을 도입하였고 쉘의 두께가 얇거나, 즉 종횡비가 작거나, 균일하지 않은 유한요소망을 사용할 경우 구조물의 강성이 과대하게 평가되는 묶임현상(locking phenomenon)을 제거하기 위해 본 논문에서는 가변형도법을 도입하였다. 개발된 철근콘크리트 쉘 요소의 성능검증을 위해서 벤치마크 테스트를 수행하였고 그 결과 이 논문에서 도출한 유한요소해석 결과는 실험결과와 잘 일치 하였다

공사기간 단축을 위한 원자로 건물 외벽 거푸집 개발 (Development of RCB Exterior Wall Form for Duration Reduction)

  • 조예림;신윤석;고영태
    • 한국산학기술학회논문지
    • /
    • 제19권1호
    • /
    • pp.587-595
    • /
    • 2018
  • 세계에서는 지구온난화 등에 따른 기후 변화에 대응하여 원전 건설을 금지해오던 국가들도 점점 허용하는 추세이다. 따라서 앞으로의 원전 건설이 늘어날 것이며 이에 대한 경쟁 또한 심화될 것이다. 원전 프로젝트는 일반 건설 공사와 비교하여 공사 기간이 매우 길다. 원전 건설 프로젝트에서 경쟁 우위를 확보하기 위해 원전 공사 기간을 줄일 수 있는 기술을 개발하는 것이 필요하다. 따라서 본 연구의 목적은 원자로 건물 외벽 거푸집의 높이를 3m에서 4m로 증가시킴으로써 공사 기간을 감소시키기 위한 원자로 건물 외벽 거푸집을 개발하는 것이다. 개발된 거푸집을 원전 프로젝트에 적용하기 위해 구조적 안전성과 시공성 및 경제성을 분석하였다. 현장 적용 가능성을 평가한 결과 개발된 거푸집은 구조적으로 안전했다. 그리고 시공 단수가 감소함으로써 공사 기간이 단축되고 공사비 또한 절감되는 효과를 확인하였다. 본 연구의 결과는 향후 원자로 건물의 공사 기간 단축을 위한 지속적인 기술 개발을 위한 자료로 활용하여 한국의 세계 원전시장에서의 경쟁력 확보에 기여할 수 있을 것으로 사료된다.

해외 원자력발전소 방호도장 유지관리 현황 고찰 (Study on Protective Coating Management Status in Overseas Nuclear Power Plant)

  • 임상준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.318-319
    • /
    • 2018
  • Protective coatings at nuclear power plants should be designed to withstand exposure to ambient conditions during normal operation or design-basis accidents. However, there was a change in the perception of the protective coating to the revision of the Regulatory Guidelines by the NRC in July 2000. In other words, maintenance guidelines have been strengthened in order to minimize the clogging of the cooling water system due to the substances in the containment building. Therefore, KHNP, the contractor and operator of the nuclear power plant, plans to develop the coating system for nuclear power plants in accordance with the regulation, and plans to develop its own coating expert.

  • PDF

원자력발전소 방호도장 Service Level 분류에 대한 고찰 (Study on Classification of Protective Coating Service Level in Nuclear Power Plant)

  • 임상준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.140-141
    • /
    • 2018
  • Protective coatings at nuclear power plants should be designed to withstand exposure to ambient conditions during normal operation or design-basis accidents. However, there was a change in the perception of the protective coating to the revision of the Regulatory Guidelines by the NRC in July 2000. In other words, maintenance guidelines have been strengthened in order to minimize the clogging of the cooling water system due to the substances in the containment building. Therefore, KHNP, the contractor and operator of the nuclear power plant, plans to develop the coating system for nuclear power plants in accordance with the regulation, and plans to develop its own coating expert.

  • PDF

원자력발전소 방호도장 중요성 및 규제기준에 관한 고찰 (Study on Infortance and Regulatory Guide of Protective Coating in Nuclear Power Plant)

  • 임상준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.63-64
    • /
    • 2017
  • Protective coatings at nuclear power plants should be designed to withstand exposure to ambient conditions during normal operation or design-basis accidents. However, there was a change in the perception of the protective coating to the revision of the Regulatory Guidelines by the NRC in July 2000. In other words, maintenance guidelines have been strengthened in order to minimize the clogging of the cooling water system due to the substances in the containment building. Therefore, KHNP, the contractor and operator of the nuclear power plant, plans to develop the coating system for nuclear power plants in accordance with the regulation, and plans to develop its own coating expert.

  • PDF

친환경건축물 인증제도 활성화를 위한 정보시스템 개선 연구 (A Study on the Improvement of Green Building Certification Information System)

  • 류수훈
    • 한국디지털건축인테리어학회논문집
    • /
    • 제11권3호
    • /
    • pp.5-16
    • /
    • 2011
  • This study aims for improvement and rebuilding of the 'Green Building Certification Criteria Information System;GBCCIS'. To achieve this, improved information system has developed self-assessment program available on the web and to provide data about the target of Green Building Certification based on the 2010 revised criteria. The target building of Green Building Certification is Apartment, Office, Mixed-Use Building, School, property for sale, accommodation, and other facilities. Also, the information system about the Green building related technologies and techniques to take advantage of offer a variety of information was built. Green Building Certification Criteria web-site Established in this study has information and each menu and contents are linked to organic and high-utilization. Each menu is organized according to the used frequency and the group. Also this web-site is composed of information guide field, core service field, and other field. These improvement of Green Building Certification Criteria Information System can be a positive incentive measures for the activation of Green Building Certification Criteria easily by taking advantage of relevant information by users. And these will be possible to planning development of Green building technologies by introducing the latest Green building construction techniques applicable building. Also, to assess in advance by using self-assessment program in the design phase of building will lead to Green building design and provide the convenience of the application process and through database construction and share information of building assessment resources certified Green Building Certification Criteria will lead to the containment and fair assessment between cation authorities.

Hydrocode를 이용한 격납구조의 대형 민항기 충돌해석 (Analysis of Containment Building Subjected to a Large Aircraft Impact using a Hydrocode)

  • 신상섭;박대효
    • 대한토목학회논문집
    • /
    • 제31권5A호
    • /
    • pp.369-378
    • /
    • 2011
  • 본 논문은 RC(Reinforced Concrete), SC(Steel-Plate Concrete) 격납구조에 대한 대형 민항기 충돌에 관한 응답해석을 Hydrocode인 Autodyn-3D를 통해 수행하였다. 이전에 연구된 대부분의 항공기 충돌 해석에서의 충격 하중은 국부적인 부분(동체면적의 약 2배)에 대해 Riera의 충격하중함수를 적용하는 방법을 이용하여왔다. 하지만, 본 논문에서는 실제 Boeing 767과 유사한 모델을 구현하여 대상 구조체에 직접 충돌 시켜 나타나는 현상을 비교 분석 하였으며, 항공기 모델은 강성벽(Rigid Target)에 대해 항공기를 충돌 시켰을 시 발생되는 충돌하중이력곡선과, Riera 함수를 이용한 충돌하중이력곡선과의 비교를 통하여 검증하였다. 항공기 충돌 시, SC 격납구조에 대한 충돌저항능력 및 응답, 안전성 효과를 평가 하기 위해 무근 콘크리트(Plain Concrete:PC), 철근 콘크리트(Reinforced Concrete:RC), 철근 콘크리트와 완전 부착된 내부 Liner Plate(CLP:Containment Liner Plate), 그리고 SC 격납구조에 대한 해석을 수행하였다. 따라서 항공기 충돌과 같은 비정상충격하중이 RC구조와 SC구조에 가해질 경우에 대한 거동 예측이 가능하며, 보수적인 안전성이 요구되는 RC 원전 격납건물에 SC구조를 적용하면 상대적인 안전성 증대 효과를 기대 할 수 있을 것으로 보여진다.

중대사고시 격납건물여과배기계통(CFVS)적용으로 인한 사고영향과 결과 고찰 (A Study on the Effect of Containment Filtered Venting System to Off-site under Severe Accident)

  • 전주영;권태은;이재기
    • Journal of Radiation Protection and Research
    • /
    • 제40권4호
    • /
    • pp.244-251
    • /
    • 2015
  • 본 연구에서는 격납건물의 건전성을 유지시켜 원전 주변의 오염범위를 축소할 수 있는 격납건물 여과배기계통(containment filtered venting system, CFVS)에 초점을 맞추고, 동 설비의 설치 전 후의 피해규모를 분석하여 여과장치의 효용성을 분석하였다. 본 연구에 사용된 코드는 확률론적 영향평가 코드인 MACCS2 이며, 평가에 이용한 사고선원항은 신고리 원자력발전소 1&2 호기의 확률론적 안전성 평가 보고서의 결과를 활용하였다. 주어진 총 19 개의 사고선원항 중 선정된 3 개의 방출군에 대하여 CFVS 적용 전후의 주민이 받는 유효선량과 갑상선선량을 산출하였다. 선량평가 결과는 거리에 따른 선량으로 산출되었으며, IAEA 주민보호조치 권고 기준인 갑상선방호약품 복용 및 방호조치가 필요한 갑상선선량과 유효선량을 초과하는 거리를 기준으로 비교하였다. STC-3, STC-4, STC-6 의 거리에 따른 유효선량은 전 범위(0~35 km)에서 95~99 % 내외의 감소율을 확인할 수 있었으며, 갑상선 선량의 경우 약 96~98 % 내외의 수준으로 유효선량과는 선량감소에서의 비슷한 경향이 있음을 확인 하였다. CFVS 를 적용한 후 대피 및 소개가 취해지는 유효선량 기준값을 초과하는 거리는 모든 방출군에 대하여 평균 1 km 내외로 평가되었다. 특히 STC-4 의 경우 26 km 에서 1.2 km 로 유효 선량을 초과하는 범위가 타 방출군에 비하여 대폭 줄어든 것을 확인할 수 있었다. 갑상선선량 기준값 초과거리의 경우 CFVS 를 적용한 후의 피해범위는 2~3 km 수준으로 산출되었다. 또한 갑상선선량 평가결과는 유효선량의 경우와 같이 STC-4 에서의 피해범위가 대략 50 km 줄어들어 CFVS 적용으로 가장 큰 효과를 보았다.