• Title/Summary/Keyword: Container terminal simulation

Search Result 172, Processing Time 0.02 seconds

A Study on Modelling and Tracking Control System Design of RTGC(Rubber-Tired Gantry Crane) (RTGC의 모델링 및 주행제어기 설계에 관한 연구)

  • Jeong, Ji-Hyun;Lee, Dong-Seok;Jeong, Jeong-Soon;Kim, Young-Bok
    • Journal of Navigation and Port Research
    • /
    • v.34 no.6
    • /
    • pp.479-485
    • /
    • 2010
  • To handle container effectively is one of the most important factors in a port because working time is linked soon into cost. Since the middle of 1990s, RMGC(Rail-Mounted Gantry Crane) and RTGC(Rubber-Tired Gantry Crane) have been developed and widely used to operate containers in the yard. The RTGC is more difficult than RMGC in the automatic control system design. Although, the RTGC is largely advantaged to free driving environment, it has some considerable disadvantages in the system operating. In general, the problems are due to tire slip and lack of tire pressure etc. Therefore, a desirable research result has not been shown in this time. So, in this paper, we propose a new approach to design tracking control system for the RTGC in which the mathematical modeling is included. From the simulation results, the control performance of the designed control systems is evaluated.

A Study on the Microcomputer Aided Port Design Simulation and its Application to the Third State Busan Port Development Project. (컴퓨터시뮬레이션을 이용한 항만설계 및 부산항 3단계 개발 계획에 관한 응용에 관한 연구)

  • 김환수
    • Journal of the Korean Institute of Navigation
    • /
    • v.15 no.1
    • /
    • pp.12-47
    • /
    • 1991
  • This work aims to introduce the concept of microcomputer aided port design simulation methodology including the analysis of the mathematical models to be implemented and apply it to the Third Stage Busan Port Development Project. In the Busan case study, the size of the proposed turning basin of the new terminal, together with the operational strategies of berthing and unberthing, was examined, In addition, the safety on ship's entry and exit through the projected new breakwaters was ascertained. From the application of simulation to the Busan project, it was found that the proposed dredging area was not sufficiently wide enough for the modelled container ship to perform A time unberthing (in which the ship turns to port as she manoeuvres away from N.1. Berth with the assistance of tugs), especially in a strong easterly wind. It is therefore, recommended that Busan pilots should be advised to sue B type unberthing strategy, in which the ship goes astern from no.1 berth tot he turning area in front of No.2 berth(where the ship turns 180 degrees clockwise), especially when the wind is very strong, It is also recommended that a sea buoy be placed outside the new breakwaters, as this was found to improve the safety of ship manoeuvres through the breakwaters significantly . Another recommendation is that the Korean hydrodynamic Office carry out a detailed survey of the currents in the water area near the new breakwaters once they have been constructed. In addition, it is to be recommended that a current meter be placed at the recommended sea buoy to improve the safety of ship manoeuvres which could otherwise be jeopardised by eeroneos current information.

  • PDF