A COMPARISON OF OLD AND NEW OSHA REGULATIONS ON CRANES AND DERRICKS USING COMPREHENSIVE GAP ANALYSIS

  • Chung-Suk Cho;Francis Boafo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.74-79
    • /
    • 2013
  • Aiming at reducing deaths and injuries involving construction crane operations, OSHA has recently updated its 40-year-old crane safety standards with new rules addressing the use of cranes and derricks in construction. The goal of this change in rule is to deal with the leading causes of fatalities related to crane and derrick operations. Employers in the construction industry are mandated to ensure that employees in the work zone are trained to recognize hazards associated with the use of the equipment and any related duties that they are assigned to perform. However, those responsible at construction sites for the supervision and management of safe crane operations often lack the integrated knowledge of the standards, regulations and best practices for conducting or supervising daily, monthly, or quarterly inspection of cranes. As such, proper planning, management and implementation of crane operations, including inspections are just as paramount to reducing accidents on the construction site. It is important that engineers responsible for the management and planning of crane operations understand the latest OSHA crane and hoisting standards to ensure a safer work environment is maintained. Many on site engineers overseeing crane operations do not have adequate training, experience, and knowledge of the inspection requirements to assess safe crane operation and too often rely on the crane operator's judgement. This paper highlights recent research effort in defining significant changes in new crane and hoisting standards and provides basis for safety construction operations.

  • PDF

건설 공정 모니터링을 위한 모바일 증강현실 시스템 (Construction Management System using Mobile Augmented Reality)

  • 이석한
    • 디지털콘텐츠학회 논문지
    • /
    • 제18권5호
    • /
    • pp.977-982
    • /
    • 2017
  • 본 논문에서는 실시간으로 건설현장의 공정과정 및 작업 결과를 파악하고 모니터링 할 수 있는 시스템을 제안한다. 기존의 일반적인 건설현장 관리 및 모니터링의 경우 작업 현장의 영상을 작업자가 촬영한 후 이를 관리감독 본부에 직접 전송하여 작업의 진도나 작업결과 정확도에 대한 통제를 받는 오프라인 형식으로 진행된다. 이와 같은 모니터링 과정은 진행 방법의 특성상 많은 시간적 금전적 제약사항이 존재하며 신속한 의사결정 및 작업 현장과의 실시간 의사소통이 불가능하다는 단점이 존재한다. 이러한 단점을 최소화하기 위해서 본 논문에서는 증강현실 기술을 이용한 실시간 건설 공정 모니터링 시스템을 제안하였다. 그리고 최근 각광받는 스마트 모바일 장비를 기반으로 시스템을 구성함으로써 작업자의 사용성을 극대화하고자 하였다. 실험 및 구현 결과를 통하여 제안된 시스템의 효율성을 확인하였다.

원자력발전소(原子力發電所)가 지역(地域)의 생산(生産), 소득(所得)과 고용(雇傭)에 미치는 효과(效果) 분석(分析) (Regional Production, Income and Employment Impact of Nuclear Power Plant)

  • 신용인;양광남
    • 농업과학연구
    • /
    • 제23권2호
    • /
    • pp.272-284
    • /
    • 1996
  • The present study has quantitatively assessed the regional production, income and employment impact resulting from the construction and operation of nuclear power plant (NPP) upon the domestic local areas by applying the regional input-output analysis model to the case of Wolsong unit-l site. The conclusions regarding the most likely regional economic impacts upon the wolsong site are summarized as follows: 1. The income multipliers are calculated to be 1.563 for the construction phase and 1.500 for the operation phase. These values are relatively high compared with those of other conventional facilities. 2. The level of total employee's wage induced employment associated with the construction phase has been estimated to be 37,000 while that with the operational phase in 1990 to be 5,610. 3. With relation to the aspect of resident welfare it is found that the industrial sector associated with electricity, gas and water supply have remarkably improved with the construction of the NPP. 4. The NPP siting has induced substantial changes in interindustry (input-output) structures of the Wolsong unit-l site which is one of the rural areas where all the domestic NPPs are sited. Such changes are attributed to the industrial recomposition of the region. 5. With the application of other regional economic analysis models and the use of more sufficient regional data, other detailed studies on the economic impact analysis of domestic NPP-related facility sitings are suggested to be carried out further since the influence of NPP sitings is significant to the national economic impact as well as the regional economic impact.

  • PDF

매립지 주변 환경영향평가시 소음지도 활용연구 (A Study on the Utilization of Site Noise Map for Environmental Impact Assessment around Landfill)

  • 박인선;박상규
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2005년도 추계학술대회논문집
    • /
    • pp.66-70
    • /
    • 2005
  • Noise prediction are required as part of an environmental impact assessment. Prediction method that is used to domestic environmental impact assessment of construction site and industrial site is not applied work operation rate, work position, moving noise source, inner traffic flow, work type and height of noise source etc. The BS5228 methodology is used mainly for assessment of proposed open industrial sites(mineral extraction, landfill etc.), and larger long-term construction sites(typically for major infrastructure projects). also, estimation which consider various effect factor is possible.

  • PDF

재해예방 기술지도의 문제점과 개선방안에 관한 연구 (건설 재해를 중심으로) (A Study on Problems and Improvement of Disaster Prevention Technology Guidance(Focused on construction disaster))

  • 노태우;강경식
    • 대한안전경영과학회지
    • /
    • 제18권4호
    • /
    • pp.47-55
    • /
    • 2016
  • Recently, industrial accidents rate has been gradually decreasing due to the development of safety management methods, but until now, the accident rate in the construction sector is higher than other industries. Large-scale construction sites are operating systematic safety systems to reduce industrial accidents. However, small and medium sized construction sites do not have systematic safety system and lack safety management ability, so that disaster is not reduced compared with large scale construction site. As a result, disaster prevention technology instruction system has been implemented to reduce the disasters of small and medium scale construction sites. However, in the case of a small construction site less than 2 billion won, there is little decrease in the accident rate, and in some cases, the accident rate increases. After the technical guidance system has been implemented, it is necessary to identify the performance and problems of implementation and to improve its effectiveness. In this study, we suggest the improvement plan to improve the efficiency of the technical guidance system by analyzing the problems and actual conditions of technical guidance operation in small and medium sized construction work sites.

아스팔트포장 유지보수 적정공사비 산정방안 연구 (A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work)

  • 오재훈;송태석;안방율
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.16-26
    • /
    • 2020
  • 도로포장 유지보수 공사는 다양한 현장 여건에 의해 작업량이 다양하게 발생되고 있으나, 공사비 예정가격 작성시 세분화된 기준이 없어 적정공사비가 산정되기 어렵다. 도로포장 유지보수는 신설포장과 달리 차량들이 운행하고 있는 상황에서 시공을 할 수 밖에 없어, 도심지, 작업제한시간, 야간, 시공면적 등에 따라 생산성에 많은 차이를 보이고 있다. 이를 보정하기 위해 공사비산정기준 등에서는 차로수, 주택가, 작업가능시간, 야간작업 등의 할증을 제시하고 있으나, 공사관계자들에 따라 상이하게 적용이 되고 있는 실정이다. 본 연구에서는 도로포장 유지보수 주요 작업공종에 대하여 현장의 여건을 제대로 반영 할 수 있는 공사비산정 기준을 마련하고 적용할 수 있는 방안을 조사하였다. 주로 많이 시공되고 있는 '절삭 후 아스팔트 덧씌우기', '표층복구', '포장복구', '도로복구'를 대상으로 현장을 조사·분석 하였으며, 현장조사 결과를 바탕으로 기본적인 번화가, 주택가 등 할증을 포함하여 작업시간과 시공개소 및 면적에 따라 시공량을 구분하여 적용할 수 있는 기준을 제시하였다. 작업시간은 이동과 준비시간을 제외한 순수작업시간을 3개 type(7시간, 5시간, 3시간)으로 구분하여, 각 type에 따라 시공개소의 면적을 5가지로 구분할 수 있는 계수를 마련하였으며, 공사비를 비교·분석 하였다. 이에 따라 시공목적, 현장여건에 따른 공사비산정기준 설계방법을 제시하여 설계자가 현장여건을 고려하여 적정한 공사비를 산정할 수 있는 방안이 마련된 것으로 판단된다.

국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구 (Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level)

  • 장준영;;이찬식;김태완
    • 한국건설관리학회논문집
    • /
    • 제20권4호
    • /
    • pp.114-125
    • /
    • 2019
  • OSC (Off-Site Construction)는 공장 생산 기반의 새로운 건설 방식이다. 생산성과 경제성, 품질면에서 기존 방식에 우위에 있기 때문에 미국, 영국 등 세계 각지에서 OSC 관련 설계 및 생산 표준화, 운반 방법 등과 같은 연구들이 활발하게 진행되고 있다. 새로운 분야의 출현으로 합리적인 관리가 요구됨에 따라 건설사업관리 범위에 대한 분석이 필요한 실정이다. 따라서 이 연구는 CM/PM범위의 "작업 단계 수준"에서 연구 동향 및 관계를 분석하여 연구의 영역, 연구 간 관계, 현재의 연구에서 부족한 부분 등을 파악하였다. 이 연구에서는 2018년 9월3일까지 작업 단계의 수준 94개의 논문으로, OSC (CM/PM)연구에 대한 포괄적인 문헌 검토를 수행하였으며, 분석 결과 다음과 같다. (1) 2006년부터 작업 단계 수준의 연구가 빠르게 증가하고 있다. (2) Non-volumetric pre-assembly유형은 작업 단계에서 가장 크게 기여하고 있다. (3) 건축물 유형에서는 주거용: 주거의 생활, 품질 문제, 비주거: 경제 문제, 공장: 생산성 문제를 다루는 것으로 확인되었다. (4) Non-volumetric pre-assembly 유형은 주거용 및 비주거용 건축물에서 경제성에 대한 내용을 다루고 있었으며, 반면, Modular building 유형은 조립 품질에 관련된 연구가 수행되었다. (5) 2006년부터 프로젝트 관리 영역(예 : 품질, 인적 자원, 위험)이 확장되었다. 이 연구를 활용하면 OSC 새로운 연구 영역을 찾는데 도움이 될 것으로 예상된다. 추후 산업, 기업, 프로젝트 단계 수준까지 분석을 진행한다면, OSC 산업의 전반적인 연구 흐름 및 분야별 영역을 파악할 수 있을 것으로 판단된다.

효율적인 건설공사와 유지관리를 위한 건설현장에서의 3차원 공간 정보 획득 (3D Spatial Information Acquisition for Construction Operation and Maintenance on a Construction Site)

  • 김창완
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.188-193
    • /
    • 2004
  • 3차원 모델링은 다양한 safety-enhancement applications 과 프로젝트 관리 시스템에서의 as-built data acquisition에 이용될 수 있다. 본 연구의 목적은 효과적인 방법으로 건설 현장을 3차원 모델로 형상화 할 수 있는 3차원 공간 모델링 방법을 제시하고 실제 건설 현장에서의 실험을 통하여 제시한 방법을 검증하는 것이다. 본 논문에서는 제안된 건설현장을 형상화하기 위한 모델링 알고리듬들과 여러 장소들로부터 얻는 data를 하나의 coordinate system으로 변환하기 위한 coordinate transformation 알고리듬에 대한 설명을 포함하였다. 제안된 모델링 방법의 건설 현장에 대한 실제 적용성을 검증하기 위해 실제 건설 현장에서의 모델링 실험에 대한 결과가 논의되었으며 이러한 결과는 본 연구에서 제안된 모델링 방법이 건설 현장을 효과적으로 3차원 모델로 형상화하는 것을 보여준다.

  • PDF

KASS 기준국 사이트 구축 (The Development for KASS Reference Station Site)

  • 조성룡;장현진;정환호;이병석;남기욱
    • 한국항행학회논문지
    • /
    • 제24권4호
    • /
    • pp.273-279
    • /
    • 2020
  • 한국형 SBAS (KASS)에서 기준국 사이트는 GPS/GEO 신호를 수집하고 감시하는 중요한 인프라 시설이다. SBAS 기준국은 상시 관측소보다 요구사항이 명확하고, 운영 단계에서 지속적인 유지보수가 필요하다. KASS 기준국 사이트 구축은 사이트 조사, 사이트 공사, 안테나 측지측량, 장비 설치 및 운영을 위한 준비가 필요하다. 사이트 조사는 사이트 가용 여부 및 시스템 성능 예측을 위한 단계이다. 기준국 사이트, 장비실 및 부대시설은 운영 기관이 사이트 요구 사항을 만족하도록 제공해야 한다. 기준국 안테나의 위치는 매우 중요한 정보로 측지측량을 통하여 정확도를 확보해야 한다. 정확한 위치의 안테나에서 측정된 측정치는 중앙처리국에 제공된다. 기준국의 정확한 위치는 향후 지속적인 위치 확인 및 업데이트를 수행해야한다. 기준국 사이트 구축이 완료 되면, 기준국 장비 설치 및 운영을 위한 업무를 수행한다. 본 논문에서는 7곳의 기준국 사이트의 구축 절차 및 결과를 제시하였다.

유닛 모듈러 공법의 효율성 확보를 위한 공장제작, 운반, 현장설치의 최적 공정 제안 (A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation)

  • 이광복;김경래;신동우;차희성
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.14-21
    • /
    • 2011
  • 모듈러 공법은 전체공정의 50%~90%를 공장에서 제작하여 이를 운반하여 현장에서 설치하는 공법이다. 이 공법은 현장에서 공정을 최소화하고 공장에서 작업을 극대화하여 공기를 단축하고 품질을 향상시킬 수 있다. 모듈러 공법으로 시공하면, 사용연한이 지나 건축물 철거시 일부 또는 전체를 재사용이 가능하기 때문에 건축폐기물까지 줄일 수 있는 친환경적인 공법이라고 할 수 있다. 이 모듈러 공법은 최근 수요가 증가하는 소형주택과 한국전쟁 당시 지어진 전방의 노후화된 병영시설의 교체에 적합한 공법이다. 경량철골을 사용한 모듈러 공법의 국내 시공 사례는 2003년 신기초등학교를 시작으로 군 병영시설에 확대 적용되고 있지만 아직까지 시장 초기단계이다. 따라서 범용 적으로 활용이 가능한 모듈 유닛의 표준과 공정의 표준정립이 시급한 상태이다. 본 연구에서는 기존 독신숙소의 신축 사례를 바탕으로 1인 숙소를 표준 모듈로 가정하고 모듈의 공장제작, 운반, 현장설치의 모듈러 공법의 최단 공사기간내의 최소 공사비 투입이 가능한 표준 공정을 제안하고자 한다. 공장에서 완성품을 제작하는 것이 가장 합리적이지만 운반시 하자발생을 감안한다면 공장제작비율 80%일 때 가장 합리적인 것으로 도출 되었다.