콘크리트 양생 모니터링을 위한 거푸집 일체형 무선센서네트워크(WSN) 시스템 (Form Integrated Wireless Sensor Network for Monitoring of Concrete Curing)

  • 이성복;박원준;조명원;이승엽;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.173-175
    • /
    • 2012
  • Temperature during concrete curing can be effectively used to predict the early age strength of concrete However, various current methods have limits to provide the temperature data in real time due to harsh working environment including frequent cutting of wires. This paper presents the results of our investigation of an all-in-one Wireless sensor network (WSN) for the management of the curing temperature of in-placed concrete at early curing stages. Also, the network device for transmission can be easily separated from the probe sensor part and reused consistently. The field experiment entailed measuring the curing temperature of concrete using the WSN. After fresh concrete was poured into the formworks, the signals were measured at a 150 m radius from the field office. The signal was acquired for 28 days without any dispersion or interruption at the construction site; therefore, this study confirms the applicability of the proposed system to a construction site.

  • PDF

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

중견건설업체의 다중현장관리를 위한 자재소요계획모델 (Material Planning Model for Multi-Project Management in Medium-sized Construction Companies)

  • 정성림;한주연;김경래;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.598-601
    • /
    • 2003
  • 건축공사의 규모가 대형화, 복잡화, 다양화 되면서 여러 현장에서 공사수행에 따른 많은 정보가 발생하여 본사로 보고 되고 있다. 이러한 정보들 중에서 매개 현장 및 다중 현장을 동시에 관리하기 위해서는 필요정보만을 추출하여 경영진이 의사결정을 할 수 있는 지원체계의 필요성이 증가하고 있다. 하지만 중견건설업체의 경우 대기업과 비교할 때 본사 조직의 미비 및 관리업무 시스템이 취약하여 다중현장 관리가 어려운 실정이다. 특히 이러한 현장관리에 있어서 자원관리는 프로젝트 관리자의 중요한 관리대상이다. 그러나 자원계획을 일정정보와의 연계가 없이 주로 담당자의 경험과 판단에 근거하여 수립하기 때문에 일정이 변경될 때마다 계획을 수작업으로 수정해야하는 실정이며, 이로 인한 불필요한 공기지연이나 재고비용이 발생하고 있다. 본 연구에서는 중견건설업체가 다수 현장을 동시에 관리할 수 있도록 현장의 작업일보와 공정관리 소프트웨어의 연계를 통한 자재소요계획모델을 제시한다.

  • PDF

중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델 (Material Planning Model for Multi-Project Management in Medium-sized Construction Companies)

  • 정성림;한주연;김경래;신동우
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.106-114
    • /
    • 2004
  • 건축공사의 규모가 대형화, 복잡화, 다양화 되면서 개별 현장에서 공사수행에 따른 많은 정보가 발생하여 본사로 보고 되고있다. 이러한 정보들 중에서 개별 현장 및 다중 현장을 동시에 관리하기 위해서는 필요정보만을 추출하여 경영진이 의사결정을 할 수 있는 지원체계의 필요성이 증가하고 있다. 하지만 중견건설업체의 경우 대형건설업체와 비교할 때 본사 조직의 미비 및 관리업무 시스템이 취약하여 다중현장관리가 어려운 실정이다. 특히 이러한 현장관리에 있어서 자원관리의 대부분을 차지하는 자재관리는 프로젝트 관리자의 중요한 관리대상이다. 그러나 자재조달계획을 일정정보와의 연계가 없이 주로 담당자의 경험과 판단에 근거하여 수립하기 때문에 일정이 변경될 때마다 계획을 수작업으로 수정해야하는 실정이며, 이로 인한 불필요한 공기지연이나 재고비용이 발생하고 있다. 본 연구에서는 중견건설업체가 다수 현장을 동시에 관리할 수 있도록 현장의 작업 일보와 공정관리 소프트웨어의 연계를 가정한 자재조달계획 지원모델을 제시한다.

건설현장 관리자의 안전의식 조사 분석 (Survey and Analysis about the Safety Perception and Attitude of Managers in Construction Site)

  • 최진우;박찬식
    • 한국안전학회지
    • /
    • 제29권4호
    • /
    • pp.97-102
    • /
    • 2014
  • The aim of this study is to survey and analyze the safety perception and attitude of the construction managers for the purpose of contributing to the construction industry accident prevention by inducing safety behaviors of managers. The data analysis found that there were significant differences on safety perception and attitude depending on job positions. This survey found that job position and career affect the safety perception and attitude of manager. Further analysis revealed job position has more an effect on it than career. Therefore, in order to improve the safety perception and attitude of managers, it is effective to put managers more responsibility on safety.

중대재해처벌법의 안전보건관리체계 구축 요인과 건설업 사고지표의 연관성 분석 (Relationship Analysis of the Factors for Safety and Health Management System Stipulated in the Serious Disaster Punishment Act with Accident Statistics of Construction Industry)

  • 김판기;채희윤;김성일;정기효
    • 한국안전학회지
    • /
    • 제37권4호
    • /
    • pp.44-50
    • /
    • 2022
  • This study examines the relationship between safety factors and health management systems based on accident statistics in the construction industry stipulated in the Serious Disaster Punishment Act. To determine the level of safety achieved by companies through their health management system, the top 1000 construction firms in the country were surveyed online. Four hundred sixty companies responded to the survey by providing their statistics on major accidents (mortality, accidental mortality, and injury rates). Statistical tests showed that companies with a team dedicated to the oversight of safety and health management had fewer accidents than those without one. Factor and regression analyses revealed that three factors affected the mortality and accident rates: safety and health plan, safety and health professionals, and safety and health activities. Moreover, two factors significantly influenced the injury rate: safety management supported by a cooperative company and implementation of on-site safety and health activities. The findings of this study can be used as a fundamental reference for further research and consultation on the formulation of safety and health management systems for construction companies.

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권11호
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

부분 무기둥 비계구조 골조 거동에 관한 실험적 연구 (An Experimental Study on the Behavior of Scaffolding System without a Part of Column)

  • 손기상;정희종
    • 한국안전학회지
    • /
    • 제28권4호
    • /
    • pp.66-71
    • /
    • 2013
  • There is a critically structural problem of scaffolding system when one of scaffold columns is remove to be used as a gangway for their temporary office in the structure before finishing all such as an apartment or office building. This is not used to checking to structurally checking at a construction site. This study is to find out which system at a site will be more effective and low-cost-high effectiveness of aluminum ladder, timber ladder, ${\phi}$1/2 inch steel pipe truss with a type of concave, convex warren truss ladders. Theses are structurally tested with horizontal set as a truss type with 1.8 meter long. Concentrated load has been loaded at the upper center of the system and checked its strain at the bottom center, using aluminum-use strain gage and steel-use gauge have been attached concave warren truss with diameter 1/2 inch has 14% stronger than convex truss. Convex truss has almost same strength as an aluminum ladder truss, it is found out.

뉴욕시 공립학교에 나타난 공용공간의 특성에 관한 연구 -미첼/지아골라 건축사무소 계획안들을 중심으로- (An Study on the Characteristic of Common Space In New York City Public School - Focused on Mitchell/Giurgola Architects' Projects -)

  • 김필수;전유창
    • 교육시설 논문지
    • /
    • 제18권3호
    • /
    • pp.43-51
    • /
    • 2011
  • The purpose of this study is to analyze the characteristic of common space of public schools in New York City and how the common space can perform a decisive role in enriching public space not as simply connecting between programs but as common space for a wide range of uses for communities as well as students. This study illustrates with a general design guideline of SCA(School of Construction Authority) and how the rules help the common space as an interactive link between community and site/site and school building/building and outdoor space/outdoor space and lobby in the urban context. Since its founding in New York City, 1958, Mitchell/Giurgola Architects office has dedicated itself to working with institutions and public and private schools for 50 years and has been working with SCA for 10 public schools since 1990. Through five school examples by Mitchell Giurgola architects, the study describes how the office suggests public "place" interweaving inner public space and outer public space through lobbies. A result of this research can be proposed what improvements should be made on common space in domestic schools by analyzing of positive aspects of SCA schools.

  • PDF

돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구 (A Study on the Impact to Safety Management by the Speedy Construction Work and the Prevention Measure)

  • 하행봉;방명석
    • 대한안전경영과학회지
    • /
    • 제15권2호
    • /
    • pp.143-149
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.