• Title/Summary/Keyword: Construction problem

Search Result 3,309, Processing Time 0.031 seconds

A proposal to the construction of textbook contents of fraction division connected to problem context (문제 상황과 연결된 분수 나눗셈의 교과서 내용 구성 방안)

  • Shin, Joonsik
    • The Mathematical Education
    • /
    • v.52 no.2
    • /
    • pp.217-230
    • /
    • 2013
  • This study attempts to propose the construction of textbook contents of fraction division and to suggest a method to strengthen the connection among problem context, manipulation activities and symbols by proposing an algorithm of dividing fractions based on problem contexts. As showing the suitable algorithm to problem context, it is able to understand meaningfully that the algorithm of fractions division is that of multiplication of a reciprocal. It also shows how to deal with remainder in the division of fractions. The results of this study are expected to make a meaningful contribution to textbook development for primary students.

A Study on the Current Status and Analysis on the Problem of Unfloored space and Floor Repair in Rural House (농촌주택의 봉당·마루 개보수 현황 및 문제점 분석)

  • Park, Gil-Beom;Park, Jun-Mo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.117-118
    • /
    • 2014
  • The unfloored space and floor is one of characteristic of traditional house in Korea. This space is used to connecting passage between room or entrance of house. Currently, according to decline of heat insulation property thereby becoming decrepit house, native is repairing it for block external environment such as rain, wind and so on. But, variety problem is happening from wrong repair. This object of this study is current status and analysis on problem of unfloored space and floor repair. As a result, current status of repair is classified repair type, installation position and using form. And position of problem is confirmed connection between original house and extend space.

  • PDF

Principal Items of Construction Management for Developing Construction Guide of Large Spatial Roof Construction (대공간 지붕공사 시공지침서 개발을 위한 중점관리항목 도출)

  • Cha, Min-Su;Lee, Myung-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.197-198
    • /
    • 2017
  • Large spatial construction needs to consider various construction management factors through the construction guide, including high-tech roofing works for creating large space without columns and erecting large spatial structure. However, the domestic large spatial construction relies on overseas construction technologies due to the lack of construction guide of large spatial construction and experience in similar type of project. To improve the problem, we deduced principal items of construction management considering characteristics of large spatial construction as a preliminary study for developing a construction guide.

  • PDF

A Framework of Function Analysis for the Construction Robotics Design

  • Yi, Chang-Yong;Park, Young-Jun;Park, Jin-Young;Park, Chan-Young;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.370-374
    • /
    • 2022
  • Construction is a labor-intensive industry that heavily relies on skilled construction workers. However, the aging of the workforce is rapidly growing, and the shortage of skilled workers is intensifying. The application of construction robotics technology can solve the problem of workforce shortage and guarantee construction productivity, safety, and quality improvement. This study presents a framework of the functional analysis for construction processes and work tasks that classifies and analyzes processes and work tasks for construction robotics design. The framework presents the functional analysis process, which analyzes workers' attributes and identifies functions of construction robotics.

  • PDF

The state space of a canonical linear system

  • Yang, Mee-Hyea
    • Journal of the Korean Mathematical Society
    • /
    • v.32 no.3
    • /
    • pp.447-459
    • /
    • 1995
  • A fundamental problem is to construct linear systems with given transfer functions. This problem has a well known solution for unitary linear systems whose state spaces and coefficient spaces are Hilbert spaces. The solution is due independently to B. Sz.-Nagy and C. Foias [15] and to L. de Branges and J. Ball and N. Cohen [4]. Such a linear system is essentially uniquely determined by its transfer function. The de Branges-Rovnyak construction makes use of the theory of square summable power series with coefficients in a Hilbert space. The construction also applies when the coefficient space is a Krein space [7].

  • PDF

A Study on Construction Model of Planning and Establishment of Countermeasure in QCC Improve Activities (분임조활동의 대책수립 및 실시 방법에 관한 연구)

  • Kang, Won;Kang, Sung-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.1
    • /
    • pp.51-58
    • /
    • 2010
  • In QCC improve activities QC story is useful for solving problems. Among those the planning and establishment of countermeasure step is most important in finding new alternatives and methods for problem solving. But that step is dealt with indifferent to problem solving occasionally, so it makes difficult to find those. In this paper we suggest an effective construction model of planning and establishment of countermeasure in QCC improve activities.

MODIFIED SIMULATED ANNEALING ALGORITHM FOR OPTIMIZING LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • Po-Han Chen;Seyed Mohsen Shahandashti
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.777-786
    • /
    • 2007
  • This paper presents a modified simulated annealing algorithm to optimize linear scheduling projects with multiple resource constraints and its effectiveness is verified with a proposed problem. A two-stage solution-finding procedure is used to model the problem. Then the simulated annealing and the modified simulated annealing are compared in the same condition. The comparison results and the reasons of improvement by the modified simulated annealing are presented at the end.

  • PDF

Building Topic Hierarchy of e-Documents using Text Mining Technology

  • Kim, Han-Joon
    • Proceedings of the CALSEC Conference
    • /
    • 2004.02a
    • /
    • pp.294-301
    • /
    • 2004
  • ·Text-mining approach to e-documents organization based on topic hierarchy - Machine-Learning & information Theory-based ㆍ 'Category(topic) discovery' problem → document bundle-based user-constraint document clustering ㆍ 'Automatic categorization' problem → Accelerated EM with CU-based active learning → 'Hierarchy Construction' problem → Unsupervised learning of category subsumption relation

  • PDF

A Study on complex waterproofing Method Using Part of Joint Watertightness Improved Sheet (접합부 수밀성 향상 시트를 이용한 복합방수 공법에 관한 연구)

  • Suh Woo-Il;Kim Su-Ryon;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.1-6
    • /
    • 2004
  • We ensure a flat and regular basic surface by using part of joint waterproofing improved sheet method applying the upper slab of a concrete structure. We solve the problem of getting loose scale the general sheet by waterproofing of the sheet and improving adhesive strength of the basic concrete. Also, waterproofing sheet union to problem of joint have solved using of insertion type method so that, it improved a watertightness. It has improved in resist impact, resist abrasion and it is the effect of shortened construction period and cutting down on construction expenses. Here are the special quality and superiority of this waterproofing research. (1) Level material has the super adhesive strength so that it makes the basic surface without the gab of waterproofing sheet and waterproofing layer with the string adhesive strength. (2) We unite the sheet with the joining part between sheets by waterproofing sheet joint using of method. (3) There is the effect of shortened construction period and cutting down on construction expenses without waterproofing of protection.

  • PDF

A Study on activation way of vocational education training for construction skill manpower problems solution (건설기능인력난 해결을 위한 직업교육훈련의 활성화 방안에 관한 연구)

  • Lee, Seung-Jae;Oh, Sangl-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.133-137
    • /
    • 2006
  • Can examine cause that the construction industry is faced in crisis of skill exhaustion in two sides. One is the tribe of actuality production manpower by entry evasion and graying of young man class specially new manpower to the tribe of skill manpower. Another is qualitative decline of skill manpower. Generally, problem of the systematic knowledge tribe and the picking up tribe about new technology etc, exists because learn skill for shoulder beyond in spot. In cutting phenomenon of skill that is depended on personal relationships availability with skilled worker in hereafter, problem that worker who is old or enter through rain skilled worker does not learn all life skill is detected. These problems institute entry of young man class and necessity of systematic vocational education training specially new human strength strongly. This study does presentation of way to promote construction industry entry of young man class and improvement way of vocational education training system that can do to train these by function manpower by purpose.

  • PDF