Korean Journal of Construction Engineering and Management
/
v.12
no.2
/
pp.3-11
/
2011
There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.
The purpose of this study is to identify the impact of the building, site, and region characteristic factors on the annual average price rising rate of apartment housing in Seoul. The data were consisted of 272 apartment units in Seoul. A survey included checking the drawing documents and interview with apartment maintenance staffs and real estate agencies from October 2006 to February 2007. Data were analyzed with descriptives, frequency, crosstabs, and linear regression by SPSS/PC for Window. The linear regression model was employed to evaluate the price rising rate in apartment housing. Following results were obtained. The price rising rate for pyeong ($3.3m^2$) of apartment housing was determinated by the district zone, the construction company's brand name, the building age, the building stories, the floor space index, the building-to-land ratio, the green space rate, and the distance from the downtown. Especially, the district zone was the most important factor that affected the price rising of apartment housing in Seoul. Therefore, the policy has to focus to solve the imbalance between autonomous districts with the collaborated tax.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.4D
/
pp.357-366
/
2012
Construction equipment has applied to depreciation over the years, however, the price index for construction equipment is not properly reflected in existing quantity per unit and the local tax law. Thus, this study shows the analysis of the corporate tax law, the local tax law and business accounting standards, characteristics of the domestic depreciation system and depreciation methods, and the capital recovery factor of construction equipment applying the theory for economic efficiency. It also presents cases of depreciation on the basis of quantity per unit and tax law using straight-line depreciation method and declining balance method. It is proposed that the relations of the application system of permissible period for construction equipment and the existing system be explained and the application system of permissible period for construction equipment be imposed. Furthermore, it proposes the development of depreciation tables of construction equipment monthly expenses based on the domestic price index and applications. In addition of that, it proposes the analysis of pros and cons of the methods suggested and application limits of the study and subsequent improvement plans. This study should reflect more rational and objective reality in quantity per unit and tax law.
Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. And KEPCO started estimation system of historical cost data in the electrical construction works. Electrical construction cost index a matter of great importance. This paper was conducted to examine estimation methods of the items of the price index estimation system of historical cost data and suggest reasonable applications.
Korean Journal of Construction Engineering and Management
/
v.13
no.1
/
pp.67-76
/
2012
There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.249-250
/
2016
Korean government has announced declared prices of apartment reflecting market condition each year. Therefore, on that basis, apartment owners have used as basic data trading apartments and the government has been used to calculate the tax. However, the sales prices and declared prices of apartment has occurred difference depending on the region and the brand. This study has analyzed and compared regional differences in sales price of apartments. The results of this study, we have known that sales price of apartments was a big difference depending on the region and the gross area. Especially, Seoul and Gyeonggi Province are the highest. And sales price of Southeast and urban area are the highest in Seoul. In the future, it is necessary that gap analysis between sales price and declared prices of apartment. And It is needed to develop apartment index considering the region and the gross area.
Park, Houng-Hee;Choi, Seung-Dong;Hyun, So-Young;Park, Min-Young
Korean Journal of Construction Engineering and Management
/
v.15
no.5
/
pp.49-60
/
2014
Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.
Korean Journal of Construction Engineering and Management
/
v.23
no.2
/
pp.16-23
/
2022
This study examined the trend of international competitiveness over the past 10 years (2011-2020), focusing on comparative analysis with China and the United States, targeting seven major export items of Korean construction machinery based on 6 units of HS code. To this end, the export similarity index and trade competitiveness index were calculated and analyzed using UN Comtrade and Korea International Trade Association trade statistics. As a result of the analysis, competition between Korea and China has intensified over the past decade, and competition with the United States has remained at a certain level. Korean forklifts (8427.20) are exporting to the world with strong competitiveness in the global market. Excavators (8429.52) and loaders (8429.51), which have the largest export share of Korean construction machinery, have a weight advantage, but they are exporting due to price inferiority. The rest of the items were found to be inferior in price and weight, and were not competitive in the global market. These analysis results suggest the following implications. First, it is necessary to strengthen efforts to expand exports of universal construction machinery items, which are expected to increase in demand in the future, by boosting the economy and expanding infrastructure investment in accordance with eco-friendly policies. Second, excavators, which have been shown to have a quality advantage and a price competitive advantage, need to further strengthen export marketing activities not only in China and the United States but also in emerging developing countries.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.130-138
/
2009
Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.
The purpose of this study is to analyse the effects of the eco-friendly factors on the apartment housing price rise and to suggest the desirable way of marketing strategy for apartment housing. For the analysis, the data of apartment sites in Seoul had been collected from September 2006 to February 2007. The data consisted of 95 apartment sites in Seoul. Data were analyzed with descriptives, crosstabs, and discriminant analysis by SPSS/PC for Window. Following result was obtained. The eco-friendly apartment housing price rate in Seoul was determined by eco-friendly landscape, green space rate, house unit size, installment sale price per pyeong, floor space index, distance from subway station when it was not considered the impact of building age, construction company's brand, and autonomous districts. Findings of this research can provide valuable information for marketing strategy of housing construction company.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.