Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.
This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item
Kimpo International Airport, located within the Seoul metropolitan district, experienced a sudden surge of passengers and cargo in recent years. In 1990, MOCT sponsored feasibility studios and Youngjong Island location was selected as the most suitable choice among four proposed sites to build a new airport. The construction work was then commenced in November 1992. Phase I project facilities are scheduled to start its operation in March 2001 with an annual capacity of 27 million passengers and 1.7 million tons of cargo for both enplaning and deplaning from International liners. Kimpo International Airport will remain in operation primarily for domestic passengers and cargo only. Phase II project construction work will add two more runways with its related facilities by 2005. Inchon International Airport will then conveniently serve 100 million passengers for enplaning and deplaning, and 7 million tons of inbound and outbound cargo annually in its full capacity. All the airport facilities In phase I and phase II periods are constructed to meet international standards. A fully integrated transportation network and logistics function systems should be accomplished prior to the full operation of the airport. With these sccomplishments, the state-of-the-art airport is poised to meet the needs of a rapidly growing worldwide air transport industry, and will more than adequately fulfill its role as a hub airport for the Northeast Asia region.
Many companies have implemented ERP systems to enhance their process competitiveness. Since most ERP systems down to date are implemented and managed on each separated business-unit or company level, such systems run short of the consideration about global business processes and global system managements. In order to integrate a successful global ERP, it is essential to apply the well-systematic implementation methodology which considers global standardization and global IT requirements. It is, however, the actual circumstance that such well-structured methodologies for global ERP implementation are hardly shown not only from domestic site but from foreign one. This paper indicates the global ERP implementation guideline with integrated approach including; the standard process design for efficient execution of global business; the ERP implementation method considering global IT requirements; and, the management method for global system operation. GSI ERP methodology is composed of 3 Phase:Global Strategy Planning, Global Template Construction and Global Roll-Out. Phase1; Global Strategy Planning contains Environment Analysis, GSI direction and Implementation Plan. Phase2; Global Template Construction contains Business blueprint, GSI operation design and Global template implementation. Phase3; Global Roll-out contains local business analysis, local ERP implementation and Global ERP Operation.
국내 건설업계는 자체 엔지니어링 기술 확보 및 높은 수준의 건설사업 관리기술의 보유와 더불어 사업초기 단계에서 해당 프로젝트의 경제적 타당성 평가를 수행할 수 있는 능력이 절실히 요구되어진다. 시설물의 설계 및 시공 기술은 최근의 국제 시장에서 수주를 위해서는 반드시 필요한 부분이며 수익을 창출할 수 있는 사업수행을 위해서는 사업초기단계부터 사후유지관리까지의 연속적인 건설사업 관리기술이 요구되어진다. 건설사업 관리기술은 프로젝트 시작단계에서부터 운영 유지관리 단계까지 단계별로 발생하는 비용에 대해 얼마나 경제적이고 효율적으로 관리하느냐에 따라 프로젝트의 성공여부를 결정짓는 역할을 한다. 이러한 단계별 비용항목의 체계적인 분석을 위해 본 연구에서는 국내 하수처리장을 대상으로 프로젝트 전반에 걸친 비용흐름 및 요소를 조사하였다. 특히 국내 하수처리시설의 유지관리비 DB를 조사하여 데이터 모델링을 수행하였고, 실적 DB의 불확실성을 고려하여 불확실성 해소를 위해 몬테카를로 시뮬레이션 방법을 이용하여 타당성 평가를 위한 평가 목적별(처리공법, 운영 주체 등) 유지관리비 예측 추세선을 제시하고자 하였다.
최근의 건설사업에서는 전체 건설공사 수행과정 중 특히 Pre-con 단계의 중요성이 점차 커지고 있으며 Project 성패에도 큰 영향을 미치고 있다. 그러나 현재 우리나라 건설사업은 Pre-con 단계에 대한 정확한 개념 및 체계화가 이루어지지 않고 있으며 대부분 현장소장의 경험에 의존하고 있기 때문에 체계적인 공사수행에 차질을 빚는 등 많은 문제점이 나타나고 있다. 이에 본 연구를 통해 전체 Pre-con 단계 중 종합건설회사내에서 시공계획서작성이전 Pre-con 단계의 업무흐름을 분석하고 업무부서간의 도식화된 업무체계를 제시하고자 한다. 이를 통해 불필요한 업무론 배제하고 더 나아가 향상된 업무 흐름을 통해 체계적인 공사계획을 수립하여 본 공사에서의 효율성 향상을 기대할 수 있을 것이다.
First phase section of line 9 which had been constructed by first private capitalization business of Seoul city was opened on July 24, 2009. There are 25 stations of 25.5km operation distance between Gaehwa and Sinnonhyeon, running regular and express trains on the same track. The number of daily passenger demand has risen to above 200thousand passengers with record above 90% of anticipatied transport demand in 2010. The construction of second phase section(Sinnonhyeon~Bohoon Hospital : 14km, 13 stations) is currently under construction for opening in 2016. This study aims to suggest optimal operating patterns taking into consideration theoretical operating headways for regular and express trains, demand of rolling stocks mainly analyzed on record of first phase demand of line 9 and anticipated transport demand of second phase basic plan.
The 5th International Conference on Construction Engineering and Project Management
/
pp.267-273
/
2013
Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.
Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.
본 연구에서는 실제 업무수행 사례를 바탕으로 친환경 관련 건설사업관리 업무관리방안을 주요 단계별로 도출하였다. 이에 따라 녹색건축인증을 중심으로 심의단계, 인/허가단계, 실시설계단계의 운영 및 관리 프로세스에 대한 건설사업관리 업무 세부 내용의 중요도를 분석하였다. 또한, 녹색건축인증 공사비 분석에 대한 선행 연구 사례를 통해 추가되는 공사비와 획득 점수 비중을 근거로 주요 항목을 도출하였으며, 녹색건축인증의 주요 항목에 대한 건설사업관리 업무 세부 내용의 중요도를 분석하였다. 그 결과, 심의단계에서는 행정적인 요구사항을 만족시키기 위해 녹색건축인증과 관련한 반영 요소의 확인, 인/허가단계에서는 설계도서 적정성, 각 단계별 설계의 연계성, 실시설계단계에서는 시공단계와 직접적으로 연관된 사항들에 대한 검토 및 확인이 중요한 것으로 나타났다. 그리고 녹색건축인증의 주요 항목에 대해서는 설계도서에 관련 기술의 철저한 반영, 적정성 검토 및 확인이 중요한 것으로 나타났다. 본 연구의 결과는 기존의 설계단계 건설사업관리자 업무(역할) 세부 내용을 토대로 녹색건축인증의 운영/관리 프로세스와 주요 항목의 측면에서 효율적인 관리방안으로 활용될 수 있을 것으로 기대한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.