• Title/Summary/Keyword: Construction of evaluation

Search Result 5,359, Processing Time 0.038 seconds

Economic Evaluation according to Construction and Curtain Wall Mullion as a Rail (멀리온을 레일로 활용한 커튼월의 시공에 따른 경제성 평가)

  • Jung, Ui-In;Hong, Sang-Hun;Kong, Hee-Min;Kim, Bong-Joo;Yeom, Sang-Su;Kang, Hui-Tae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.17-18
    • /
    • 2016
  • Today, many kind of buildings are higher than those of previous generations, and Curtain Wall is adapted broadly as an outer wall material. But weather and environmental condition could cause problems in curtain wall construction in most construction projects. High wind speed and unplanned lifting equipment's allocation could cause construction delay and cost increase. To solve these problems, we suggest using a curtain wall mullion as a rail to lift curtain wall which is less affected wind speed. And we would like to show a preliminary data of its economic advantage evaluation.

  • PDF

A QUANTITATIVE APPROACH FOR ASSESSING THE OVERSEAS BUSINESS CAPABILITIES OF CONSTRUCTION FIRMS

  • Hae Beom Yang;Woosik Jang;Kang-Wook Lee;Heedae Park;Seung Heon. Han;Hyun-woo You
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.308-314
    • /
    • 2013
  • Although global construction spending has experienced slow growth due to consecutive economic crises, global contractors have consistently attempted to expand their overseas market share, leading to more intense competition among contractors in the international construction market. In this market environment, owners, clients and financial institutions require reasonable and systematic criteria to effectively assess the business capabilities of international construction firms. However, the existing evaluation methods for construction firms rarely consider overseas-focused business capabilities. To address this problem, this study proposes a quantitative approach to assessing the overseas business capabilities of international construction firms. The limitations of existing approaches are reviewed, and the capabilities required to perform overseas businesses are analyzed through expert interviews. Finally, 18 evaluation indices are suggested in four categories: technology resources, project management, experience and performance, and sustainability. The relative weight of each index is determined according to the Analytical Hierarchy Process (AHP) method, and a preliminary investigation of 11 Korean construction firms is conducted. The proposed method is expected that it will provide the rational criteria for international owners, clients, and financial institutions for decision-making and for evaluating international contractors.

  • PDF

A Basic Study on Evaluation Method and Performance of Membrane Waterproofing Layer (멤브레인 방수층 성능 및 평가방법에 관한 기초적 연구)

  • Oh, Mi-Hyun;Kwon, Shi-Won;Kang, Hyo-Jin;Jung, Hee-Won;Choi, In-Sung;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.17-21
    • /
    • 2003
  • This study is mainly acceptive for physical material performance than waterproofing layer performance on the external condition after construction. The reason are legalized only for material performance quality standard even though it is existed waterproofing materials for membrane. In actuality, waterproofing layer are greatly occurred in performance a decreased developing essential element that are human footprints as a result physical perimeter environment after construction and on the construction. As the result, this present paper purpose for evaluation and performance of the membrane waterproofing layer on the construction.

  • PDF

A Basic Study on Evaluation Method and Performance of Membrane Waterproofing Layer (멤브레인 방수층 성능 및 평가방법에 관한 기초적 연구)

  • 오미현;권시원;강효진;정희원;최인성;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.17-21
    • /
    • 2003
  • This study is mainly acceptive for physical material performance than waterproofing layer performance on the external condition after construction. The reason are legalized only for material performance duality standard even though it is existed waterproofing materials for membrane. In actuality, waterproofing layer are greatly occurred in performance a decreased developing essential element that are human footprints as a result physical perimeter environment after construction and on the construction. As the result, this present paper purpose for evaluation and performance of the membrane waterproofing layer on the construction.

  • PDF

A Study on the Development of Performance Evaluation Model Utilizing BSC(Balanced Score Cards) for Construction Firms (균형성과지표(BSC) 개념의 건설기업 성과평가모델 개발에 관한 연구)

  • Shin Kyoo-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.27-34
    • /
    • 2002
  • Utilizing information and knowledge is one of the major objectives in the management of construction firm. This trend has been developed both inside of the firms and overall industry-wise. Therefore conventional methods of performance evaluation based on the financial statements such as balance sheet under GAAP(Generally Accepted Accounting Principles) are not sufficient to cover various Performance of constriction firms. Core competency of construction firms needs to be evaluated by the new performance evaluation model. In this research, the concept of BSC (Balanced Score Cards) is utilized to develop the performance evaluation model for construction firms considering four major performance indicators including financial perspective, customer perspective, learn and growth perspective, anti internal business perspective. A model of performance evaluation including criteria is proposed to evaluate construction firms based on their vision and strategy.

  • PDF

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

A Study on the Thermal resistance Performance Evaluation Method of Building Exterior System for Passive House Construction (패시브하우스 구축을 위한 건물외피시스템 단열성능 평가 기법 개발에 관한 연구)

  • Kim, Young-Bong;Moon, Jae-Sik;Park, Dong-Cheon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.143-144
    • /
    • 2017
  • Due to the recent depletion of natural resources and global warming, a passive house type building exterior system has been developed and applied. For this purpose, we developed a building exterior thermal resistance performance evaluation system and verify the feasibility of this system for evaluation of passive house building system.

  • PDF

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.