• Title/Summary/Keyword: Construction of complex

Search Result 1,940, Processing Time 0.029 seconds

Text mining-based Data Preprocessing and Accident Type Analysis for Construction Accident Analysis (건설사고 분석을 위한 텍스트 마이닝 기반 데이터 전처리 및 사고유형 분석)

  • Yoon, Young Geun;Lee, Jae Yun;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.2
    • /
    • pp.18-27
    • /
    • 2022
  • Construction accidents are difficult to prevent because several different types of activities occur simultaneously. The current method of accident analysis only indicates the number of occurrences for one or two variables and accidents have not reduced as a result of safety measures that focus solely on individual variables. Even if accident data is analyzed to establish appropriate safety measures, it is difficult to derive significant results due to a large number of data variables, elements, and qualitative records. In this study, in order to simplify the analysis and approach this complex problem logically, data preprocessing techniques, such as latent class cluster analysis (LCCA) and predictor importance were used to discover the most influential variables. Finally, the correlation was analyzed using an alluvial flow diagram consisting of seven variables and fourteen elements based on accident data. The alluvial diagram analysis using reduced variables and elements enabled the identification of accident trends into four categories. The findings of this study demonstrate that complex and diverse construction accident data can yield relevant analysis results, assisting in the prevention of accidents.

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Utilizing Noise Mapping in Environmental Impact Assessment in a Downtown Redevelopment Area (도심지 재개발사업 환경영향평가시 소음지도 적용방안에 관한 연구)

  • Lee, Shi-Won;Park, Young-Min;Choi, Jin-Kwon;Chang, Seo-Il
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.15 no.11 s.104
    • /
    • pp.1311-1317
    • /
    • 2005
  • In environmental Impact assessment, noise impact assessment usually consists of three stages-surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of a project. The distance-attenuation relation of a point source, which has been used to predict the noise level due to its simplicity does not consider complex acoustic phenomena like multi-reflection, -diffraction and -absorption due to complex topographic configuration of buildings and terrains. For the consideration of such physical complexities. a noise mapping tool is adopted to produce a series of noise maps, which are those for the present, tot the works of construction and for the future. For accurate noise mapping, acoustical and topographic Information is used. Standard sound power levels and directivities of various construction equipments are need and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.

Analysis of Architectural Characteristics to Utilize Senior Centers as an Community Anchor Space in Apartment Complex (공동주택 경로당의 건축적 특성과 커뮤니티 거점공간으로서의 활용방안 연구)

  • Eun, Nan-Soon;Park, Hae-sun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.25 no.2
    • /
    • pp.37-50
    • /
    • 2019
  • Purpose: The purpose of this study was to analyze the space planning of the Senior Center which was supplied recently in apartment complex, to activate the spaces suitable for the changes and needs of the elderly and to explore the complex functions as a community space where intergenerational exchanges are possible. In other words, we sought implications for the physical plan of the district as a community base space and searched for improvement plan. Methods: The survey was conducted by five large private sectors of construction, and 10 of them were built after 2010 in an urban area(Seoul). Literature review, data analysis, field survey and interview were used for the research method. Results: As a result, it was difficult to meet the demands of various elderly people in the space planning, program and operation mode at the current level. In particular, the Baby Boomer generation as an active silver generation will not use the Senior Center. Therefore, based on the results of the survey, we propose some of the following about the Senior Center in apartment complex. First, it is necessary to change the term "the Senior Center" as defined in Article 55-2 of the "Regulations on Housing Construction Standards, etc.". Second, the criteria for setting up the elderly complex space should be presented specifically. Third, it is necessary to secure financial resources in operation and management. Finally, it is necessary to support the residents' organization for community revitalization. Implication: Through the amendment of the laws, it will be possible for various generations to have opportunities to interact by activating the existing community spaces for seniors. It will also contribute to improving the community of apartment complexes.

A Study on Practical Application of "Special Building Zone" for Improvement of Landscape of Housing Complex - Focused on the Redevelopments Project of Sinbanpo Apartment Complex - (공동주택 경관향상을 위한 특별건축구역제도 적용실태 분석에 관한 연구 - 신반포1차아파트 주택재건축 정비사업을 대상으로 -)

  • Lee, Bo-Ram;Lee, Su-Hyoung;Lee, Jung-Hyung
    • Journal of the Korean housing association
    • /
    • v.28 no.3
    • /
    • pp.45-54
    • /
    • 2017
  • A Special Building Zone, which could relieve or ignore part of the Building Act and the regulations in relevant laws, was practically established for the creation of new urban landscape, the improvement of construction technology, and the improvement of construction-related policy. However, due to the lack of understanding the Special Building Zone as well as the insufficiency of detailed standards in policies, the system currently cannot be operated in universal matters. In such circumstance, this study, which is based on the current data on the Special Building Zone defined in exiting law, attempts to analyze the multi-unit housing that has been planned by the system of Special Building Zone. Also, this study aims to derive the Special Building Zone's possibilities and implications that contribute to the improvement of landscape, so as to suggest solutions for effective improvement of the system. With the results above, solutions for the improvement of the system can be derived and summarized as the following. On the one hand, from 'planning perspective', it is necessary to improve the system in a comprehensive way with consideration of urban and local contexts. On the other hand, from 'procedure perspective', some foundation shall be prepared for a system that can allows comprehensive tasks, including the settlement of the zone, the alleviation/elimination of regulations, the approval of building's construction, the process of construction, and the monitoring.

A Case Study of Ergonomic Evaluation for the Control Rooms of a Petroleum Complex

  • Chang, Seong Rok;Yoon, Hoon-Yong;Cheng, Hong-In
    • Journal of the Ergonomics Society of Korea
    • /
    • v.36 no.1
    • /
    • pp.1-7
    • /
    • 2017
  • Objective: Two control rooms of a petroleum complex were ergonomically evaluated for this study using diverse drawings of the rooms. The objective of the study is to show the evaluation process and its results, assessment method and essential elements for drawing-based ergonomic evaluation. Background: Ergonomics can enhance the working environment and safety for a control room when implemented effectively. A control room design was examined by ergonomists based on ergonomic principles and well-practiced standards. This study was conducted because a construction consortium wanted to perform an ergonomic evaluation of the control rooms before the construction. Method: A simple evaluation process, composed with a pre-evaluation, an evaluation and a post-evaluation, was employed to carry out the study. ISO 11064, NUREG-0700, NUREG/CR-6150, and CRIOP were reviewed to evaluate the control rooms. The assessment ranges over the control room layout, workstations, display and control, environmental requirements and safety. Three ergonomists participated in the study and performed the evaluation for two months. Results: An experienced consortium of construction companies designed the petroleum complex and control rooms. No significant ergonomic design problems were detected. Quantitative recommendations were provided for the layout and workstation dimensions. Specific design directions were also proposed for environmental requirements and safety. Conclusion and Application: Design advice and minor potential problems were reported as results of the drawing-based ergonomic evaluation. More practical suggestions could be additionally provided if an on-site assessment was conducted. However, the ergonomic evaluation used in this study could be helpful and applied to designing and evaluating other various control rooms prior to their construction.

A study on a performance the appliable rubber asphalt of monolithic waterproofing material of construction quality and the cement polymer modified waterproof coating membrane material of surface treatment. (무기질계 탄성 도막재와 고무 아스팔트를 적층한 일체형 방수재의 시공특성에 관한 실험적 연구)

  • Park Jin-Sang;Choi Sung-Min;Park Young-Tea;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.223-226
    • /
    • 2005
  • In this study on the appliable Asphalt sheet of monolithic and inorganic matter waterproofing ,Fing material using of field because of problem of complex waterproofing sheet. Before this cement polymer modified waterproof coating and appliable asphalt sheet of monolithic whether have stability by method of construction about all style waterproofing that evaluate to new method of construction development naturally big emphasis put and try to approach. Did performance test item first at, as a result, drew by suitable thing in all KS items. This is considered to have more effective spot construction work because if means that have stability by material as well as method of construction.

  • PDF

International industrial logistics complex logistics network design (국제산업물류단지 물류네트워크 설계)

  • Shin, Jae Young;Kim, Woong-Sub
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.06a
    • /
    • pp.221-222
    • /
    • 2014
  • Companies are facing challenges to have high competitiveness because of continuous oil price rising and CO2 emissions regulations. Thus, companies are trying hard to construct effective logistics and operation system to achieve high customer service quality and saving cost. Also the ec-friendly idustrial complex is needed. Busan is in process to construct GILC(Global Industry Logistics City) in west Busan province to achieve high competitiveness and support lack of industrial complex. To construct this kind of logistics industrial complex, it needs logistics system through proper policy and freight transportation co-operation. Especially, efficient management through logistics hierarchy construction in industrial complex is very important for low cost and eco-friendly point of view. Therefore, this paper aims to analyze logistics system and suggest operation model to present logistics complex construction base data.

  • PDF