Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager (현장 관리자 중심의 건축공사 가설기술 표준분류체계구축)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

Evaluation of Structural Behaviour of High Performance Permanent Form with Stainless Steel Fiber

  • Sim Jong Sung;Oh Hong Seob;Ju Min Kwan;Shih Hyun Yang;Han Jeong Jin;Sohn Yushin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.499-502
    • /
    • 2005
  • Nowadays, the stripping work of form has generated some problems such as increasing total constructing cost result from delayed work schedule by the stripping work of form and environmental issues by wasting the debonded form. According to recent research for form work, it has studied about permanent form to solve economic and environmental problem which is commented above. In this study, high performance permanent form method was developed and tested by adopting COM and TEN specimens adopted on the Compression and Tensile section then the structural behaviour was investigated. In the test result, the specimen adopted the form showed better structural performance than control specimen in the point of ductility, failure mode and ultimate load.

  • PDF

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.558-565
    • /
    • 2012
  • Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.

Study on the Satisfaction Analysis for Development of Construction Estimating Manager based on 3D Data (BIM기반 건축적산 매뉴얼 개발을 위한 만족도 분석에 관한 연구)

  • Choi, Chang-Hoon;Lee, Junbok;Han, Choong-Hee;Soh, Ji-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.222-223
    • /
    • 2014
  • According to the improvement of IT technology, an enhanced efficiency of management system in the construction industry is expected since a quotation system with BIM (Building Information Modeling) technique effectively estimates construction materials. For an enhanced efficiency of management system, related guidelines, standards, and manuals based on BIM are required, but the lack of this information causes difficulty to utilize in practice. In the paper, the satisfaction analysis was performed in order to promote the completeness of construction estimating manager that can be presented criteria and details of BIM-based quantity-takeoff, classification criteria.

  • PDF

Development of job stress measurement system for construction field managers (건설공사 현장소장 직무스트레스 측정 시스템 개발)

  • Lee, Tae -Shin;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.121-122
    • /
    • 2022
  • Recently, the scale of construction project is getting bigger compared to previous projects. Therefore, the job stress of the field manager responsible for the construction project is getting more and more intense. Therefore, construction companies should establish a job stress management plan for stable human resource management of the field managers. From this perspective, in this study was developed a job stress measurement system in connection with MBTI personality types. The developed system allows the job stress of the field manager to be judged on a scale from 1 to 9 points. Accordingly, it is expected that construction companies will contribute to the effective management of field managers in the future.

  • PDF

Analysis of Practical Task for Improvement of Safety Manager's Work Efficiency (건설공사 안전관리자 업무효율성 향상을 위한 실무업무 분석)

  • Sohn, Sung-Geun;Eom, Yong-Been;Jeong, U-Jin;Kang, Sang-Hun;Lim, Jee-Young;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.265-266
    • /
    • 2021
  • Recently, the importance of disaster prevention has emerged as serious accidents have occurred frequently, in which workers died or seriously injured at industrial sites. In response, the government enacted the 'Act on the Punishment of Major Disasters' to strengthen the responsibility, punishment intensity, and regulation of business owners for accidents at the site. In particular, the construction industry accounts for a large proportion of serious accidents, so safety levels need to be raised through on-site management. This study aims to reduce the occurrence of disasters at construction sites and to improve the work efficiency of safety managers. To derive detailed elements of the safety manager's work, domestic and overseas cases were investigated. The derived items were analyzed for the difficulty and preventive effects of the work through a survey of experts, and they will contribute to disaster prevention by presenting tasks to be focused and suggesting ways to improve inefficient tasks.

  • PDF

Analyzing Construction Safety Planning Tasks for Performance Improvement (건축공사 안전관리자 계획업무의 중요도 분석에 관한 연구)

  • Park, Jae-Woo;Kang, Sang-Hun;Sohn, Sung Geun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.193-194
    • /
    • 2019
  • The main purpose of the study is to reduce the accident death rate in the construction industry. To achieve this goal, the safety planning tasks were analyzed and assessed in terms of the importance and preventive effects of the tasks. Through the extensive literature reviews, the safety planning tasks were identified and reviewed by safety managers. Based on the data collected, a survey was conducted in order to receive responses by experts with knowledge on the effects and importance of preventive measures for safety. Then, the IPA method was employed to identify the safety manager's tasks that have an effect on performance indicators. The effective safety tasks identified are expected to have a critical role in reducing the accident death rate in the construction industry.

  • PDF

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

A Study on the Development of Evaluation System on the Construction Project Manager's Safety Capability (건설사업관리자의 안전역량 평가체계 개발에 대한 연구)

  • Shin, Dong Hyuk;Seong, Joo Hyun;Yook, In Soo;Lee, Myeong-Gu;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.40-45
    • /
    • 2017
  • Among various methods to build the construction safety, the consecutive improvement by the measuring and evaluating safety management capabilities for the construction participants such as an owner, a contractor, and a supervisor (construction project manager) can be the effective one. Thus, an effective evaluation and grading criteria to provide performance index for the implementation of safety management activities should be necessary. In this regards, the purpose of this study is to verify the adequacy by offering a competency evaluation system for the supervisor's safety capability and by applying the system to some construction sites. The proposed evaluation system was developed on the basis of the principles of safety management & accident prevention, basic elements of safety and health management system, and safety evaluation cases at home and abroad. The trial evaluation showed that the safety management of the construction site is mainly carried out by the contractor and the supervisor's awareness for the safety management is low on the whole. Especially, it is urgent to improve the support system from the supervisor headquarter and to place the dedicated safety management person in the field.

Analysis of Construction Safety Planning Tasks for Performance Improvement Using Importance Performance Analysis (IPA) Method (안전관리자 계획단계 업무 도출을 통한 난이도 및 예방효과 분석)

  • Kang, Sang Hun;Huh, Young-Ki;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.545-554
    • /
    • 2020
  • As recent safety accidents at construction sites can lead to serious accidents that threaten the lives of workers, the role of safety managers in charge of safety management has emerged. However, the current construction safety management system requires the improvement and simplification of the work contents due to the excessive workload and inefficient safety tasks of each person. In this respect, the main purpose of this study is to reduce the occurrence of construction safety accidents by deriving correlations using 2×2 Matrix analysis techniques through expert opinion, simplifying unnecessary tasks and identifying areas requiring improvement. Therefore, if this research reduces inefficient safety manager work and reduces job stress caused by excessive simple document work, thereby efficiently reorganizing safety manager's work to prevent blind spots of hazards and risks, it will ultimately have a great effect on preventing safety accidents at construction sites.