A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

  • PDF

Economic analysis of irrigation facilities for securing water for field crops

  • Hyung Jin Shin;Jae Young Lee;Jae Nam Lee;Han Na Lee;Sang Hyeon Park;Bum Soo Shin;Sang Sun Cha;Se Myung Kwon;Jung Il Seo;Chan Gi Park
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.4
    • /
    • pp.785-798
    • /
    • 2023
  • Considering irrigation facilities are currently insufficient and drought vulnerability due to climate change is high, efficient measures are required to secure water supply for field crops. This study, therefore, calculated the water shortage to secure water for representative field crops. An economic analysis was further conducted by comparing the production income to the input cost for each method. Here, five distinct regions were selected to represent each crop-Cheongyang-gun for chili peppers, Yesan-gun for apples, Dangjin-si for cabbages, Seosan-si for garlic, and Goesan for beans. The regions with insufficient water supply were estimated by calculating the water requirements and the supplied water from public groundwater wells for each area. A comprehensive set of four scenarios was presented as a strategy to ensure water security and manage irrigation facilities. These scenarios comprised the maintenance of existing groundwater wells, the construction of new water storage tanks, the installation of additional groundwater wells, and the utilization of surface water. B/C (benefit/cost) analysis was conducted for each scenario. As a result, the construction of water storage tanks was selected as a facility and water management plan in Cheongyang-gun, Dangjin-si, and Seosan-si. The analysis additionally indicated the economic viability of installing surface water utilization facilities in Yesan-gun and developing water storage tanks and groundwater (aquifer) wells in Goesan-gun. The results of this study are considered to serve as foundation data that may be utilized in the selection of water management plans for drought-prone areas in the future.

Field Application of Surface Insulation Curing Method to Cold Weather Concreting (한중콘크리트의 현장 표면단열 양생공법 시공사례 연구)

  • Kim Jong-Back;Lim Choon-Goun;Han Min-Cheol;Kim Seoung-Soo;Han Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.25-28
    • /
    • 2005
  • This study investigates the field application of surface insulation curing method, which combined double layer bubble sheet(DBS) and thick-curing-material(TCM) for cold weather concreting. According to the test, deck slab, curing only upper section with DBS and TCM, does not make big different temperature history with that, curing both upper and bottom section during daily average temperature 6.5t. It is concluded that combination of DBS and TCM in only upper section can be safely cured in early period of time during cold water concreting. The field test was carried out with this favourable data. The upper deck slab was insulated by combination of DBS and TCM, and the construction was surrounded by tent. in order to protect from outside wind. The test result shows that the lowest temperature of deck slab indicated 6$ ^{circ}C $. It demonstrated that this curing method can resist early frost and save construction cost in the side of management and saving labor cost, compared with previous method. In addition, the column specimen, combined both form and bubble board, exhibited favorable temperature history, due to internal hydration heat insulation effect.

  • PDF

A Study on the Strategy of the Use of Big Data for Cost Estimating in Construction Management Firms based on the SWOT Analysis (SWOT분석을 통한 CM사 견적업무 빅데이터 활용전략에 관한 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.54-64
    • /
    • 2022
  • Since the interest in big data is growing exponentially, various types of research and development in the field of big data have been conducted in the construction industry. Among various application areas, cost estimating can be a topic where the use of big data provides positive benefits. In order for firms to make efficient use of big data for estimating tasks, they need to establish a strategy based on the multifaceted analysis of internal and external environments. The objective of the study is to develop and propose a strategy of the use of big data for construction management(CM) firms' cost estimating tasks based on the SWOT analysis. Through the combined efforts of literature review, questionnaire survey, interviews and the SWOT analysis, the study suggests that CM firms need to maintain the current level of the receptive culture for the use of big data and expand incrementally information resources. It also proposes that they need to reinforce the weak areas including big data experts and practice infrastructure for improving the big data-based cost estimating.

a Study on the Real-time Data Linkage of Field Control System for Distributed Control (분산제어를 위한 필드제어시스템의 실시간 데이터 연계)

  • Kim, S.G.;Song, S.I.;Oh, E.S.;Lee, S.W.;Gwak, K.Y.;Lee, E.W.;Park, T.R.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.777-779
    • /
    • 2003
  • This paper describes the real-time data linkage of the field control system for distributed control in nuclear power plant environment. The most important keys of digital control system in nuclear power plant are the reliability and stability of system, and real-time control ability. This Paper brought up the hardware construction using a new method about the design of each station located upon control transmission network to improve real-time ability of field control system, and measured the station binding time between devices connected to field control module. And it was confirmed performance improvement of overall system for real-time data linkage between control devices.

  • PDF

A Study on the methodology of applying and activating the Construction Drawing Information Exchange Standard(STEP) by CALS/EC (CALS/EC 체계에 따른 건설도면 정보교환 표준(STEP)의 적용 및 활성화 방안에 관한 연구)

  • 김인한;최중식
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.39-53
    • /
    • 2002
  • In the Korean domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To remedy the aforementioned inefficiency effectively, it is necessary to apply the STEP standard which is known as an international standard for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to activate the STEP based construction drawing information exchange standard to the current construction drawing information exchanging and sharing practice. In this paper, the domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In addition, a methodology of applying and activating the STEP standard has been suggested. Finally, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF

Vision-based full-field panorama generation by UAV using GPS data and feature points filtering

  • Guo, Yapeng;Xu, Yang;Niu, Haowei;Li, Zhonglong;E., Yuhui;Jiao, Xinghua;Li, Shunlong
    • Smart Structures and Systems
    • /
    • v.25 no.5
    • /
    • pp.631-641
    • /
    • 2020
  • To meet the urgent requirements of safety surveillance from civil engineering management authorities, this study proposes a refined and efficient approach to generate full-field high-resolution panorama of construction sites using camera-amounted UAV (Unmanned Aerial Vehicle). GPS (Global Position System) information extraction for pre-registration, feature points filtering for efficient registration and optimal seaming line seeking for fusion are performed in sequence to form the full-field panorama generation framework. Advantages of the proposed method are as follows. First, GPS information can sort images for pre-registration, avoiding inefficient repeated pairwise calculations and matching. Second, the feature points are filtered according to the characteristics of the construction site images to reduce the amount of calculation. The proposed framework is validated on a road construction site and results demonstrate that it can generate an accurate and high-quality full-site panorama for the safety supervision in a much efficient manner.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

A remote long-term and high-frequency wind measurement system: design, comparison and field testing

  • Zhao, Ning;Huang, Guoqing;Liu, Ruili;Peng, Liuliu
    • Wind and Structures
    • /
    • v.31 no.1
    • /
    • pp.21-29
    • /
    • 2020
  • The wind field measurement of severe winds such as hurricanes (or typhoons), thunderstorm downbursts and other gales is important issue in wind engineering community, both for the construction and health monitoring of the wind-sensitive structures. Although several wireless data transmission systems have been available for the wind field measurement, most of them are not specially designed for the wind data measurement in structural wind engineering. Therefore, the field collection is still dominant in the field of structural wind engineering at present, especially for the measurement of the long-term and high-frequency wind speed data. In this study, for remote wind field measurement, a novel wireless long-term and high-frequency wind data acquisition system with the functions such as remote control and data compression is developed. The system structure and the collector are firstly presented. Subsequently, main functions of the collector are introduced. Also novel functions of the system and the comparison with existing systems are presented. Furthermore, the performance of this system is evaluated. In addition to as the wireless transmission for wind data and hardware integration for the collector, the developed system possesses a few novel features, such as the modification of wind data collection parameters by the remote control, the remarkable data compression before the data wireless transmission and monitoring the data collection by the cell phone application. It can be expected that this system would have wide applications in wind, meteorological and other communities.

A Review of Instrumentation System and Construction of Korea Highway Test Road (시험도로 건설과 계측시스템 구축)

  • 최준성;김도형;김성환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF