• 제목/요약/키워드: Construction delays

검색결과 180건 처리시간 0.021초

이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구 (Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology)

  • 이찬규;이승현;손재호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

A PROACTIVE APPROACH FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

  • Balasubramanian Kanagasabapathi;Kuppusamy Ananthanarayanan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.744-747
    • /
    • 2005
  • The AEC (Architecture/Engineering/Construction) industry is facing a competitive world after it entered into the 21st century. Due to improper planning and scheduling, the construction projects face severe delays in completion. Most of the present day construction organisations operate in multiple project environments where more than one projects are to be managed simultaneously. But the advantages of planning and scheduling as multiple projects have not been utilized by these organisations. Change in multi-project planning and scheduling is inevitable and often frequent, therefore the traditional planning and scheduling approaches are no more feasible in scheduling multiple construction projects. The traditional scheduling tools like CPM and PERT do not offer any help in scheduling in a resource-constrained environment. This necessitated a detailed study to model the environment realistically and to make the allocation of limited resources flexible and efficient. This paper delineates about the proactive model which will help the project managers for scheduling the multiple construction projects.

  • PDF

시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론 (Database establishment method for process scheduling by means of simulation)

  • 고용호;노재윤;키앙;신도형;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

도심지 토공사 PRD (Percussion Rotary Drill) 공법의 천공작업 소요시간 산정 방안에 관한 연구 (A Study on Estimating Time for PRD (Percussion Rotary Drill) Piling Work)

  • 김용규;최창훈;한충희;이준복
    • 한국건설관리학회논문집
    • /
    • 제19권3호
    • /
    • pp.3-10
    • /
    • 2018
  • 근래에 공사의 대형화, 복잡화 등으로 인해 기계화시공은 보편화되었으며, 건설기계는 성공적인 시공을 위한 주요소이다. 그러나 건설기계가 차지하는 비중이 높아지고 있음에도 불고하고 건설기계의 작업능력에 대한 분석은 미미한 실정이다. 또한 현재 품셈에서 모든 건설기계에 대한 기준이 정의되어 있지 않음으로 인해 시공계획 시 작업자에 따라 공사기간을 자의적으로 적용하고 있어 실제 시공 간 공사기간이 부족하여 돌관작업이나 공기지연이 발생된다. 따라서 본 연구에서는 PRD공법에서 사용되는 항타기의 천공작업 공사기간을 기존 방법보다 정확하게 산출할 수 있도록 작업일보를 현장 실사를 통해 천공시간 데이터를 수집하여 항타기의 천공 작업 소요시간을 산정하는 식을 정립하였다. 본 연구 결과를 바탕으로 천공작업의 정확한 공사기간을 산정한다면 공사기간이 부족하여 발생하던 돌관작업이나 공기지연을 방지할 수 있을 것으로 사료된다.

철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발 (Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE)

  • 박상민;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

대공간 지붕 철골공사의 시공계획 중점관리항목 도출 (Deriving of Critical Factors for Construction Planning in Large Span Roof Construction)

  • 이명도
    • 한국공간구조학회논문집
    • /
    • 제18권1호
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템 (ICT-BIM based Quality Nonconformity Control Method for Construction Project)

  • 손상혁;이형국;배상희;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

전기열풍기를 이용한 동절기 콘크리트 가열양생공법 적용 및 적정성 효과 검증 (Confirmation of Applicability of Heating and Curing Method of Concrete in Winter Using Electric Heating System)

  • 김세종;박종훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.131-132
    • /
    • 2022
  • Looking at recent construction cases at winter construction sites, there is a risk that heat sources such as kerosene fans and fossil fuels (brown coal, molded carbon) used in concrete will cure rapidly, so in situations where further curing is impossible after formwork removal, the outer wall and the entire slab are exposed to rapid external deterioration, resulting in delays in concrete strength expression and until collapse accidents. In this study, we applied kerosene fans and tropical circulating electric heat fans mainly used as curing heat sources at construction sites, comparative analysis. also verified the performance of structures during concrete curing due to thermal convention / circulation performance, concrete demand strength expression, and implementation of electric heat fans by heavy disaster methods.

  • PDF