• Title/Summary/Keyword: Construction adequacy

Search Result 118, Processing Time 0.028 seconds

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

Application of sound scattering models to swimbladdered fish, red seabream (Chrysophys major)

  • Kang Donhyug;Hwang Doojin;Na Jungyul;Kim Suam
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • spring
    • /
    • pp.233-236
    • /
    • 2000
  • The acoustical response of fish depends on size and physical structure na, most important, on the presence or absence of a swimbladder. Acoustic scattering models for swimbladdered fish represent a fish by an ideal pressure-release surface having the size and shape as the swimbladder. Target strength experiments of red seabream (Chrysophrys major) have been conducted using 38 (split-beam), 120 (split-beam) and 200kHz (dual-beam) frequencies. At each start of each experiment, the live fish are placed in the cage at the surface, then the cage is lowed to about $4{\cal}m$ depth where it remains during the measurements. To test the acoustic models, predictions of target strength based on swimbladder morphometries of 10 red seabream offish total length from $103{\cal}mm{\;}to{\;}349{\cal}mm$ ($3 <$TL/\lambda$ < 45)are compared with conventional target strength measurements on the same, shock-frozen immediately after caged experiments. X-ray was projected along dorsal aspect to know the morphological construction of swimbladder. and fish body. At high frequencies, Helmholtz-kirchhoff(HK) approximation would greatly enhance swimbladdered fish modeling. Sound scattering model [HK-ray approximation model] for comparison to experimental target strength data was used to model backscatter measurements from individual fish. The scattering data can be used in the inverse method along with multiple frequency sonar systems to investigate the adequacy of classification and identification of fish

  • PDF

A Study on the Behavior of Concrete floors with Over-break in Railroad Tunnel (여굴깊이에 따른 철도터널 바닥 콘크리트의 거동에 관한 연구)

  • Yang, Joo-Kyoung;Kim, Hyo-Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.5
    • /
    • pp.101-107
    • /
    • 2017
  • Over-break, which is excavated larger than planned line at tunnel excavation, is inevitable due to the nature of blasting. But regarding the bottom of the foundation, most of the domestic ordering organizations pay only 10 cm thick filled concrete when pouring concrete due to over-break. In accordance, the construction cost will increase greatly if all the depths of the designed over-break are filled only with concrete. When tunnel excavation occurs, concrete filling of 18 MPa(T = 100 mm) and 150 mm~237 mm auxiliary concrete layer and 240 mm concrete track(TCL) are applied to the upper part. The concrete is installed in an excessive amount of about 600 mm between the lower part of the rail and the tunnel rock bed. Therefore, in this study, it is necessary to analyze the concrete crack structure according to the depth of the existing tunnel and the modified tunnel section, and to evaluate the adequacy of the required thickness of the tunnel floor concrete for securing the crack stability of the concrete.

Optimal Route Location using Possible Traffic Capacity and Virtual Running and Application at Road Design in the City Centre (도심지 도로설계에서 가능교통량과 가상 주행을 통한 최적노선선정)

  • Choi, Hyun;Song, Suck-Jin;Kang, In-Joon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.4 s.34
    • /
    • pp.39-46
    • /
    • 2005
  • This paper use virtual running after possible traffic capacity application for optimal route location. General road is designed the design after we examine an alternate adequacy investigation and an execution design sufficiently. Various road user's requirement must be reflected from the beginning. But it is difficult to contain the various suitable design criteria because we consider the existing 2-dimension element. First of all, this study chose optimal route, used traffic assignment and 3D simulation. Then selected optimal route through the consistent road construction by analyzing road driving simulation of 3-dimension data and the urban landscape. possible traffic capacity and virtual running will be able to do the urban landscape analysis harmonizing with the environment; equally, it could be objectively solve the problem of a civil appeal.

  • PDF

Vital Signal Monitoring Simulation System by Various Visual Stimulus (다양한 시각자극에 따른 생체신호 모니터링 시뮬레이션 시스템)

  • Chung, Kyung-Yong
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • With the development of next IT convergence technology and the construction of infrastructure for personalized services, the importance of services based on user's sensibility status and vital signal is being spotlighted. It is the most crucial factor for the strategy of sensibility engineering to investigate student's vital signal according to the sensibility. In this paper, we proposed the vital signal monitoring simulation system by the various visual stimulus. The proposed method obtained the student's vital signal by the various visual stimulus. And the power spectrum analysis using the fast fourier transform is evaluated the activity level between the sympathetic and the parasympathetic. The analyzed result is monitoring the sensibility by displaying the heath signal light. To evaluate the sensibility between the high school's students and the university's students, we conducted SD profile and paired T-tests so as to verify usefulness. This evaluation found that the difference of sensibility activity by positive and negative stimulus was statistically meaningful. Ultimately, this paper suggests empirical application to verify the adequacy and the validity.

Water Leakage Detection Monitoring Simulation using Power Spectrum Analysis (파워스펙트럼 분석을 이용한 누수탐지 모니터링 시뮬레이션)

  • Chung, Kyung-Yong
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.1
    • /
    • pp.48-54
    • /
    • 2013
  • With the development of IT convergence technology and the construction of infrastructure for water leakage detection, the detection technology of damaged pileline's location and size is being spotlighted. The exhaustion of water resource due to the leakage of water supply facilities renders it urgent to detect water leakage effectively. In this paper, we proposed the water leakage detection monitoring simulation using the power spectrum analysis. We measured the reflected wave signal by the proposed water leakage detection monitoring simulation. The rate variability is calculated form the acquired reflected wave signal. And the power spectrum analysis using the Fast Fourier Transform is evaluated the correlation between the water leakage's size and the reflected wave. Ultimately, this paper suggests empirical simulation to verify the adequacy and the validity. Accordingly, the satisfaction and the quality of services will be improved the efficient management by supporting the real-time water leakage detection.

Study of functional trend in japan's multi-family housing and comparison through nation's environmental certification standard, analyzed by CASBEE assessment result sheet (CASBEE 평가분석을 통한 일본 주요도시 집합주택의 성능 동향 및 국내 친환경 건축 인증기준과의 비교검토에 관한 연구)

  • Shim, Jae-Myung;Kim, Kang-Soo
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.113-122
    • /
    • 2013
  • On July 2004, the brand new CASBEE for construction (Brief version) has completed while trying to highlight and improve major items adequate for each region's characteristics in Japan; at the same time, from the start of NAGOYA CITY (operated since April 2004) to the point of May 2011, it has been mandatory for specified size buildings in 23 regions by law. Evaluation sheet of CASBEE is published on each region's home page and various genre of information on building evaluation which is scheduled to be completed by 2016 and is for 5-6 years of quantity is accumulated until October 2012. It is good study resource to verify how new buildings being evaluated are closely match with CASBEE's original purport (eco-friendly, energy efficiency, publicity etc). Particularly, for Japan's multi-family housing where small sized mid to high level single housing type is majority in city, it is an important point that improved performance on eco-friendly buildings have more value in city rather than suburb. Categorized score through evaluation is a resource to confirm the latest trend of multi-family housing built in congested city; on the other hand, demand of the time can be recognized by the score focused on category. It is meaningful resource to determine the adequacy of evaluated items and the degree of reality.

A Study on the Functional Design Process and Performance Evaluation of Army's Training Wear (군복의 기능성 향상을 위한 디자인 제시 및 평가에 관한 연구)

  • Kim Kyunghi;Kim Youngmi;Kim Haeyoung;Ahn Taeyeh;Lee Sungae;Choi Kyunghi;Hong Kyunghi;Hwang Soonyoung
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.14 no.2
    • /
    • pp.104-116
    • /
    • 1990
  • An example of functional army's training wear was developed with careful considerations given to the actual user. Three steps of a functional clothing design process were followed in the design procedure. First, information on the adequacy of the current army's training wear was collected by interviews with 192 persons. Second, the current design and construction of the training wear was altered to meet the user's need from the result of the interview. Third, the performance of the newly designed army's training wear was evaluated for their effectiveness in several aspects such as conditions of the microclimate within clothing, metabolic rate, garment pressure during arm movements and appearance during body motions.

  • PDF