Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.
International conference on construction engineering and project management
/
2005.10a
/
pp.515-519
/
2005
Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.
Kim, Sun-Keun;Seo, Jong-Won;Lee, Jun-Bok;Kim, Young-Suk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.535-538
/
2006
The number of registered construction equipment exceeded the 320 thousands in 2005. Construction has been gradually mechanized, reducing the need for construction labors, and increasing the productivity and quality of construction operations. However, it still has some problems that are should be solved for effective operations, management, availability of construction equipment, increased safety of SOC fatalities, and decreased civil appeals in terms of construction equipment. Recently, technology push is accelerated by flowing information and communication technologies(ICT) for construction. In this paper, a construction equipment management system that use ICT is suggested to solve the given problems. It is anticipated that the development of the system would be able to bring the better operations and management of construction equipment.
Proceedings of the Korea Contents Association Conference
/
2007.11a
/
pp.153-159
/
2007
With development of the methodology for the selection of future emerging research and technology subject it will reach and the research for the concrete item selection which leads is propelled. It uses scientometrics objective indexes and accomplished information analysis of highly cited paper(HCP) & Clustering from the present paper. Scopus data about under using it accomplishes information analysis of construction traffic fields. It selects emerging research of construction traffic fields, it compares a national for technical trend.
Korean Journal of Construction Engineering and Management
/
v.16
no.5
/
pp.42-53
/
2015
Construction industry has the form of industry progressed through mutual cooperation among participants in various fields. Accordingly, it may be referred to as an aggregate of information where various pieces of information are generated and managed according to each construction phase. Most of the information on the construction project is issued in the form of a document. And document management of the site is critical to successful execution of the project. Therefore, in the construction site to use IT technology for efficient information management. But, most of the information on the construction site is managed by the non-structured document. and Information management in the construction site is difficult to lack of information management systems. In this study, proposed construction information database structure and breakdown structure to the information management of the construction site through the BIM technology. Therefore, previous studies were reviewed about the document management and information link management. and Space breakdown structure and information breakdown structure was proposed to structure the information of the construction site and Database for information storage is designed. And, BIM-based construction information database was examined through the application scenario.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.115-122
/
2002
There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.
Jae-Goo Han;Min-Woo Lee;Soon-Wook Kwon;Moon-Young Cho
International conference on construction engineering and project management
/
2005.10a
/
pp.1017-1021
/
2005
There is a need for effective tracking and control of material loading and delivery time especially during the finishing-work phases to eliminate the need for lay-down space on the site. Hence, it is essential to monitor the relevant information regarding material procurement in construction sites, and it is also the key factor for successful site control and the adoption of the Just-in-Time concept for high-rise building construction. The purpose of this study is to test RFID's readability in order to develop a finishing material monitoring system through the application of RFID technology.
Proceedings of the Korean Information Science Society Conference
/
2008.06b
/
pp.469-472
/
2008
건설부문의 정보화를 위해 국토해양부는 건설CALS(Continuous Acquisition & Life-cycle Support)사업을 추진하고 있다. 건설CALS란 건설사업의 설계, 시공, 유지관리 등 전 과정의 생산정보를 발주자, 관련업체 등이 전산망을 통하여 교환 공유하기 위한 정보화 전략이다. 건설CALS사업은 시스템 개발 부문과 건설정보 표준화 부문으로 구분할 수 있는데, 개발된 시스템으로는 건설사업관리시스템(건설사용, 발주기관용), 시설물유지관리시스템, 건설인허가시스템, 용지보상시스템, 건설CALS포탈시스템 등이 있다. 건설CALS시스템에는 건설사업의 공정관리, 원가관리, 안전관리 등의 많은 기능이 있음에도 불구하고 최근 그 중요성이 부각되고 있는 환경관리 기능은 없는 실정이다. 본 논문에서는 건설CALS시스템의 현황을 분석하고 환경관리가 가능한 체크리스트와 매뉴얼을 개발하여 시스템으로 구현하기 위한 방향을 제시하고자 한다.
Recently, many large structures have been constructed so it has been occurred small or big problem. One of problems in a safe construction is that behavior of underground is different between design and construction. Therefore, the purposes this study are that set up measuring equiptments in the site of construction and analyze information of measuring data for removing this problem, and measuring data use for similar method of construction in the engineering of ground.
Proceedings of the Korea Information Processing Society Conference
/
2011.04a
/
pp.1383-1384
/
2011
본 연구는 건설현장에서 발주청으로 보고하는 주기적인 업무보고자료를 대상으로 오프라인이 아닌 온라인 보고방식으로 업무처리절차를 개선하고자 한다. 또한, 온라인 보고시에도 단순 보고형식에서 승인 반려체계를 도입하여 시공사는 감리단에게, 감리단은 발주청에게 승인요청절차를 거쳐 승인 또는 반려처리함으로서 온라인으로 업무처리가 가능하도록 발주청과 건설현장간에 보고체계를 개선하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.