Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

USING MD CAD OBJECTS TO INTEGRATE INFORMATION FOR CONSTRUCTION PROJECTS

  • Chung-Wei Feng ;Yi-Jao Chen
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.515-519
    • /
    • 2005
  • Most information within a construction project roots in drawings and contract documents. Although several methodologies, such as A/E/C and 4D, have employed such a peculiarity to integrate project information, they failed to integrate information in terms of efficiency and consistency. In this research, a MD (Multi-Dimensional) CAD model is developed to improve the process of integrating information for construction projects. This research describes the processes of creating MD CAD objects and embedding information required throughout the project life cycle within MD CAD building components. In addition, a case study is presented to show the efficiency and effectiveness of using MDIIS (Multi-Dimensional Information Integration System) to integrate information for construction projects.

  • PDF

Construction Equipment Management System Using Information and Communication Technologies (정보통신 기술을 이용한 건설기계 관리시스템)

  • Kim, Sun-Keun;Seo, Jong-Won;Lee, Jun-Bok;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.535-538
    • /
    • 2006
  • The number of registered construction equipment exceeded the 320 thousands in 2005. Construction has been gradually mechanized, reducing the need for construction labors, and increasing the productivity and quality of construction operations. However, it still has some problems that are should be solved for effective operations, management, availability of construction equipment, increased safety of SOC fatalities, and decreased civil appeals in terms of construction equipment. Recently, technology push is accelerated by flowing information and communication technologies(ICT) for construction. In this paper, a construction equipment management system that use ICT is suggested to solve the given problems. It is anticipated that the development of the system would be able to bring the better operations and management of construction equipment.

  • PDF

Emerging Research Field Selection of the Constructive Traffic for Information Analysis of Scientometrics (과학계량학 정보분석을 통한 건설교통분야의 유망연구도출)

  • Jeong, Eui-Seob;Yeo, Woon-Dong;Cho, Dae-yeon;Suh, IL-Won
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.153-159
    • /
    • 2007
  • With development of the methodology for the selection of future emerging research and technology subject it will reach and the research for the concrete item selection which leads is propelled. It uses scientometrics objective indexes and accomplished information analysis of highly cited paper(HCP) & Clustering from the present paper. Scopus data about under using it accomplishes information analysis of construction traffic fields. It selects emerging research of construction traffic fields, it compares a national for technical trend.

  • PDF

Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information (설계모델과 문서정보의 효율적 연계를 위한 BIM기반 데이터베이스 체계 구축방안)

  • Lee, Donggun;Cha, Heesung;Kim, Kyungrai;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.42-53
    • /
    • 2015
  • Construction industry has the form of industry progressed through mutual cooperation among participants in various fields. Accordingly, it may be referred to as an aggregate of information where various pieces of information are generated and managed according to each construction phase. Most of the information on the construction project is issued in the form of a document. And document management of the site is critical to successful execution of the project. Therefore, in the construction site to use IT technology for efficient information management. But, most of the information on the construction site is managed by the non-structured document. and Information management in the construction site is difficult to lack of information management systems. In this study, proposed construction information database structure and breakdown structure to the information management of the construction site through the BIM technology. Therefore, previous studies were reviewed about the document management and information link management. and Space breakdown structure and information breakdown structure was proposed to structure the information of the construction site and Database for information storage is designed. And, BIM-based construction information database was examined through the application scenario.

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

DEVELOPMENT OF MATERIAL TRACKING SYSTEM USING WIRELESS TECHNOLOGY IN HIGH-RISE BUILDING

  • Jae-Goo Han;Min-Woo Lee;Soon-Wook Kwon;Moon-Young Cho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1017-1021
    • /
    • 2005
  • There is a need for effective tracking and control of material loading and delivery time especially during the finishing-work phases to eliminate the need for lay-down space on the site. Hence, it is essential to monitor the relevant information regarding material procurement in construction sites, and it is also the key factor for successful site control and the adoption of the Just-in-Time concept for high-rise building construction. The purpose of this study is to test RFID's readability in order to develop a finishing material monitoring system through the application of RFID technology.

  • PDF

Improvement Direction for Construction CALS System considering Environmental Management (환경관리를 고려한 건설CALS시스템의 개선방향)

  • Jung, In-Su;Kim, Jin-Uk;Lee, Chan-Sik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06b
    • /
    • pp.469-472
    • /
    • 2008
  • 건설부문의 정보화를 위해 국토해양부는 건설CALS(Continuous Acquisition & Life-cycle Support)사업을 추진하고 있다. 건설CALS란 건설사업의 설계, 시공, 유지관리 등 전 과정의 생산정보를 발주자, 관련업체 등이 전산망을 통하여 교환 공유하기 위한 정보화 전략이다. 건설CALS사업은 시스템 개발 부문과 건설정보 표준화 부문으로 구분할 수 있는데, 개발된 시스템으로는 건설사업관리시스템(건설사용, 발주기관용), 시설물유지관리시스템, 건설인허가시스템, 용지보상시스템, 건설CALS포탈시스템 등이 있다. 건설CALS시스템에는 건설사업의 공정관리, 원가관리, 안전관리 등의 많은 기능이 있음에도 불구하고 최근 그 중요성이 부각되고 있는 환경관리 기능은 없는 실정이다. 본 논문에서는 건설CALS시스템의 현황을 분석하고 환경관리가 가능한 체크리스트와 매뉴얼을 개발하여 시스템으로 구현하기 위한 방향을 제시하고자 한다.

  • PDF

A Study on the Using Information of Measuring Data for Safe Construction (안전한 건설공사를 위한 계측정보 활용)

  • 정대석;김춘호
    • The Journal of Information Technology
    • /
    • v.3 no.1
    • /
    • pp.1-8
    • /
    • 2000
  • Recently, many large structures have been constructed so it has been occurred small or big problem. One of problems in a safe construction is that behavior of underground is different between design and construction. Therefore, the purposes this study are that set up measuring equiptments in the site of construction and analyze information of measuring data for removing this problem, and measuring data use for similar method of construction in the engineering of ground.

  • PDF

A Study on Improvement of Report System between Government Agency and construction site (발주청과 건설현장간 보고체계 개선에 관한 연구)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1383-1384
    • /
    • 2011
  • 본 연구는 건설현장에서 발주청으로 보고하는 주기적인 업무보고자료를 대상으로 오프라인이 아닌 온라인 보고방식으로 업무처리절차를 개선하고자 한다. 또한, 온라인 보고시에도 단순 보고형식에서 승인 반려체계를 도입하여 시공사는 감리단에게, 감리단은 발주청에게 승인요청절차를 거쳐 승인 또는 반려처리함으로서 온라인으로 업무처리가 가능하도록 발주청과 건설현장간에 보고체계를 개선하고자 한다.