• Title/Summary/Keyword: Construction Technical Service

Search Result 125, Processing Time 0.028 seconds

A Study on the Efficient Technical Assistance for Small-sized Construction Sites (소규모 건설현장의 효율적인 기술지원 방안 연구)

  • Lee, Gi-Tae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.72-76
    • /
    • 2006
  • This study deals with problems of technical assistance through accidents analysis and questionnaires on small-sized construction sites which are difficult to understand real condition and administrate legally and indicated following efficient methods of technical assistance. (1) Ensuring access to the small-sized construction sites. (2) Delegation technical assistance service to civilian and supporting selected. (3) Raising of the person's safe consciousness concerned with the small-sized construction sites. (4) Safety consulting for the head office of small-sized construction sites.

Improvement of Construction Manager Selection Method (건설사업관리자 선정방식 개선 방안)

  • Park, Yong-Woo;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.108-115
    • /
    • 2011
  • This study investigates the construction management selection methods for fair competition within the construction management market by analyzing the current status of domestic construction management, the 2010 publication on the status of construction management, and the construction management evaluation criteria. Also, the 2009 publication of top CM service establishments, the average proportion of tender for 120 CM services from 2002 to 2010, and six assessment results which are open to the parties directly involved were statistically analyzed to review the adequacy of the evaluation criteria. This analysis shows that the evaluation criteria for the CM service impedes the development of the construction management industry and companies, since the criteria are decided by the service payment, and the technical skills assessed by technical proposals have no ties with contract prices. Therefore, this study proposes an improvement of the selection methods in accordance with the project characteristics and the technical requirements. However, more research is still needed to derive a detailed classification method of the technical requirement, the owner's evaluation criteria selection, and the preparation of an institutional foundation for the construction manager's post-evaluation.

Development of an Information System for managing the Service Performances in Public Construction Technique Fields (공공건설기술의 용역실적관리를 위한 정보시스템 개발)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5993-5999
    • /
    • 2013
  • This study presents the information management item and the business process improvement plan managed all construction technique services of Design, Construction Supervision and Construction Management which is ordered and constracted by the public institution in the field of construction and business steps. In addition, it develped the Management System of Construction Technique Service Performances based on improved processes for the Public Agencies and Construction Service Director to register, review and approve the Service Performance Information. As a result, it would be help transparently managed Technical Engineer's work duplication status of Constuction Company, and checked online without having to submit Company performance data by providing objective and reliable information.

A Study on the Construction of Meta Database and Management System of the Foreign Technical Information (해외 기술정보 메타 데이터베이스 구축 및 관리시스템에 관한 연구)

  • You, Beom-Jong;Lee, Eung-Bong
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.36 no.3
    • /
    • pp.201-214
    • /
    • 2002
  • Recently, the service of the technical information(journals, proceedings) which are taken in from abroad and provided has some difficulties to make users acquire the information with ease because the bibliographic information, article and document delivery service are not linked to the related organizations. In this paper we propose to supply a high-degree retrieval service by the systematic and unitary DB construction and management and to make a nation-wide efficient management and cooperation system of the foreign technical information from abroad as building up the assigning a part of the location guide and document delivery service and cooperation system of the bibliographic information from the foreign technical resources.

An Analysis of the 2014 Pricing Guide for Technical Service Contracts through Comparison with Foreign Countries' Cases (해외사례 비교를 통한 2014년 개정 건설기술용역 대가기준 분석)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.152-164
    • /
    • 2015
  • Enhancing clarity and transparency of the pricing guide for technical services for public construction works enables the prediction and reimbursement of the service cost for project owners and bidders, while it would also yield benefits for engineers who carry out the construction tasks. In order to improve the global competitiveness of construction service industry, the government revised its pricing guide for techical services for construction works recently, moving away from its previous percentage-of-construction-cost method towards the Cost Plus a Fee Method. However, since the Cost Plus a Fee Method results in the rise of the service price by 153%~197%, there is the need for a review on the method and basis of the adjustment in order to avoid controversies regarding the application of the revised method. In this context, this paper analysed the 2014 revision of the pricing guide for technical services for public construction works through comparison with foreign cases including those of the US and the UK. The analysis yielded the conclusion that, while the shift towards Cost Plus a Fee Method which is widely used in advanced economies is a very meaningful change in large measure, certain aspects still remain problematic. Unlike in advanced economies, the detailed break-down shows the direct labor cost includes certain indirect expenses. Also, indirec expenses are admitted so comprehensively as to include overhead costs and technology royalties. These problems results in redundant estimation of certain expenses, and obstructs transparency in spending details. This paper proposes various improvement measures to address these issues.

Adopting Cloud Service in the National Spatial Data Infrastructure

  • Youn, Junhee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.676-677
    • /
    • 2015
  • In Korea, NSDI(National Spatial Data Infrastructure) was implemented for integrating and sharing the nationally generated spatial data. One of the main roles of implementing NSDI is providing spatial data to public agencies. And now, the establishment plan for NSDI with the technical advancement should be needed. This paper deals with the technical aspects of adopting cloud service in the NSDI. First, we propose the concept for target system, which shows the current and future NSDI. In the future NSDI model, GIS cloud and governance systems are included. Service functions for cloud system and infrastructure implementation design directions are derived. Finally, governance system implementation plan is described. This research will contribute to the implementation of NSDI cloud service system.

  • PDF

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

Study on Revision of technical Regulation for Location Based Service (위치기반서비스용 무선설비의 기술기준 개선 연구)

  • Lee, Young-Hwan;Jang, Dong-Won;Ha, Deock-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2007.10a
    • /
    • pp.665-668
    • /
    • 2007
  • The location based service means the service using the location information and the service used based on the location information comes into the spotlight as the critical information of the future mode townsman ubiquitous-City construction. LBS settles down as the core element of ITS or the telematics as the cutting edge technology appearing according to the power generation of the mobile communication technology and recently gradually broadens a range to the public safety service including the distribution management, the asset management, a children and old and the weak protection means, the disaster preparation rescue service like the E-911 of U.S. In the national, the technical regulations about the ground wave LBS was established at November 2005 for the first time in the country. but it actually operated and problems were deduced. Therefore, in this paper, domestic and foreign LBS usage trend and technical standards case try to be analyzed for the revision of the technical regulations of the ground wave LBS serviced in the national and the national technical standards bill for the revision tries to be prepared based on this.

  • PDF

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

A Process Based Service Identification Methodology for Service Oriented Architecture Construction (SOA 구현을 위한 프로세스 기반 서비스 정의 방법론에 관한 연구)

  • Choi, Jin-Ho;Lee, Jin-Mi;Lim, Sang-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.1
    • /
    • pp.1-9
    • /
    • 2010
  • Service Oriented Architecture(SOA) is an enterprise-scale IT architecture for linking software resources available on the network. SOA is believed to become the future enterprise solution that promises the agility and flexibility by integrating business processes through composition of the software services across enterprises. The first step for SOA construction is to identify the services. In this paper, we present a process-based service identification methodology for SOA through a case study of an IT company. Our methodology is composed of three steps: Processes (business & technical processes) analysis and systems analysis, Service candidates selection, and Service evaluation and construction planning. This framework would be practical and could be accepted to other organizations as it has been developed through the real case.