• Title/Summary/Keyword: Construction Status

Search Result 1,682, Processing Time 0.027 seconds

Automated Analysis of Scaffold Joint Installation Status of UAV-Acquired Images

  • Paik, Sunwoong;Kim, Yohan;Kim, Juhyeon;Kim, Hyoungkwan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.871-876
    • /
    • 2022
  • In the construction industry, fatal accidents related to scaffolds frequently occur. To prevent such accidents, scaffolds should be carefully monitored for their safety status. However, manual observation of scaffolds is time-consuming and labor-intensive. This paper proposes a method that automatically analyzes the installation status of scaffold joints based on images acquired from a Unmanned Aerial Vehicle (UAV). Using a deep learning-based object detection algorithm (YOLOv5), scaffold joints and joint components are detected. Based on the detection result, a two-stage rule-based classifier is used to analyze the joint installation status. Experimental results show that joints can be classified as safe or unsafe with 98.2 % and 85.7 % F1-scores, respectively. These results indicate that the proposed method can effectively analyze the joint installation status in UAV-acquired scaffold images.

  • PDF

A Study on Factors Affecting Changes in Estimating Standards in Plaster Work (미장공사의 품기준 변화 요인에 관한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.232-233
    • /
    • 2019
  • The plater work in the standard of estimate presents a variety of construction types. However, there is a part that does not fit the change of specification standards and on-site construction status, and it was revised in 2019's standard of estimate. In this study, we analyzed in detail the factors affecting the changes in estimating standards in the plater work. There were changes in the specification standards previously presented as primary coat, secondary coat, and formal coat as well as changes in on-site construction status such as thickness according to the number of plastering. Therefore, it is analyzed that the estimating standards can be classified by the number of finishes according to the site conditions by reflecting the analysis of the specification standards and site application status, and suggesting the finishing standards according to the number of plastering.

  • PDF

Questionnaire Study on the Current Status of the Construction Labor Force (설문조사를 통한 건설근로자의 현황분석 연구)

  • Kim, Kyoon-Tai;Kim, Ghang-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.95-97
    • /
    • 2010
  • Current trends in the Korean construction industry, including the aging of the workforce, a lack of new Korean construction workers, and an inflow of unskilled foreign labor, have caused a range of problems, including quality deterioration, reduced productivity, insufficient understanding of the function and difficulties in communication, to name a few. Yet while countermeasures to these problems should be based on accurate and diverse fundamental data, including the current status of demand and supply of domestic and foreign construction workers, the perception of construction workers, studies on these questions have, thus far, been scarce. For these reasons, this study was conducted using a questionnaire for managers and workers on construction sites, to secure fundamental data relating to construction workers. The findings of the survey showed that it is urgent to prepare measures to educate, train and foster human resources, considering the aging of the construction workforce and the lack of an inflow of new construction workers.

  • PDF

Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status (현장시공실태에 따른 방수공사 표준품셈 개정 연구)

  • Oh, Jae-Hoon;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone

  • Kim, Seungho;Kim, Sangyong
    • Smart Structures and Systems
    • /
    • v.21 no.2
    • /
    • pp.139-149
    • /
    • 2018
  • Understanding the current status of a construction project is necessary to achieve successful on-site management. Real-time information delivery is a major concern for construction industry practitioners in order to expedite decisions and discussions. We propose the use of a first personal view (FPV) system of a quadcopter drone as a tool for monitoring on-site status and communicating between construction participants. The most important function of the drone FPV system is its ability to visually monitor construction site situations in real time. An on-site management system process is developed, verified, and applied to several construction work tasks after determining factors that affect efficient construction management. The proposed system is expected to assist the construction manager in achieving high efficiency.

A Study on the Guideline of construction cost according to Size of position and Regional characteristics of New Public Libraries (신축 공공도서관의 지위적 역할에 따른 규모와 지역 특성에 따른 건립공사비 기준에 관한 연구)

  • Lee, Chul-Jae;Yun, Ji-Won;Lee, Min
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.3
    • /
    • pp.113-120
    • /
    • 2017
  • As the functions and roles of public libraries expand, it is time for qualitative growth. In order to improve the quality of public libraries, it is important to plan actual construction costs through systematic feasibility study. Therefore, the purpose of this study is to present the guideline of construction costs considering the size and regional characteristics according to the status role of the new public libraries. The construction costs are based on actual data. The results of the study are as follows. First, we derived the analysis framework according to the size and regional characteristics. The status role of the public libraries was considered theoretically. The size was classified according to status role of the public libraries. Regional characteristics were classified through literature review. Through this, an analysis framework was derived according to size and region. Second, the actual data on construction costs of the new public libraries were examined and analyzed. Basic factors, size, area, and construction costs were analyzed for 285 libraries nationwide that opened from 2010 to 2016. The data of 129 newly opened public libraries were classified. To present construction costs depending on price fluctuation, construction cost index was analyzed as of September 2016. Third, a guideline of construction costs for new public libraries was suggested. The construction cost per $1m^2$ of building area was analyzed. By multiplying 116.70(p), the construction cost index, the construction cost per $1m^2$ of total building area was calculated to be 2,472,350 won. When applying the research result, construction costs can be gained by adding construction cost index of the month.

The Current Status and Improvement Scheme of Safety Management on the Heavy Construction Equipment Operation (건설 중기계 운영상의 안전관리 실태 및 개선방안 - 크레인, 지게차, 버킷굴삭기, 승강기, 펌프카를 중심으로 -)

  • Kang Chang-Hee;Shin Kab-Cheol;Kim Sang-Tae;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.397-400
    • /
    • 2002
  • The purpose of this study is to analyze current status and propose improvement scheme of safety management on the heavy construction equipment operation. The research method invloves interview and questionnaire survey for the analysis of practical use status of heavy construction equipment. The results of this study are as fallows: 1) The problem of safety management status on heavy construction equipment operation is surveyed not wearing safety helmet, not keeping work regulations, and not preparing the work before start. 2) Proposed improvement scheme of safety management on heavy construction equipment operation includes strengthening 5 minutes safety education before start, strengthening safety action against falling materials, and strengthening enough preparation before start.

  • PDF

A STUDY ON THE INTRODUCTION OF PERFORMANCE WARRANTY SYSTEM FOR PAVEMENTS INTO KOREA

  • Tae-Song Kim;Yong-Chil Seo;Sang-Beom Lee;Kyong-Ju Kim;Jai-Dong Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1446-1452
    • /
    • 2009
  • This study is designed to examine the current status of the performance warranty systems for asphalt pavements implemented in Europe, USA, and Japan, and to review the feasibility and possibility of introducing this system into the Korean environment. For such objectives, the concept and necessity of performance warranty and the status of Korean contracting systems and overseas performance warranty systems were evaluated. In particular, the bidding systems, performance guarantee systems, and maintenance work inclusion status in the projects and warranty specifications of Europe, USA and Japan were comparatively evaluated. And methods of introducing the performance warranty system by utilizing defects liability system and design-build contracts of Korea were suggested.

  • PDF