• Title/Summary/Keyword: Construction Status

Search Result 1,682, Processing Time 0.027 seconds

A Study on Construction of Aids to Navigation Big Data Based on S-201

  • Kim, Yunjee;Oh, Se-woong;Jeon, Minsu
    • Journal of Navigation and Port Research
    • /
    • v.46 no.5
    • /
    • pp.409-417
    • /
    • 2022
  • The International Association of Lighthouse Authorities (IALA) utilizes a questionnaire to investigate the status of Aids to Navigation (AtoN) around the world. However, results of the IALA questionnaire have limited use because respondent understanding is inconsistent. In addition, there is uncertainty regarding the appropriateness of the questionnaire content. Furthermore, the overall response rate is low. Therefore, the status of AtoN is not clearly understood. AtoN data from around the world are generated hourly. Thus, big data solutions are required to effectively exploit the information. Digitization of analog data is an important component of building big data. Hence, the IALA has developed a Maritime Resource Name (MRN) scheme and an information exchange standard. Here, we used the AtoN information exchange standard and designed an S-201-based big data construction process that could collect and manage global AtoN information. In this study, construction of an IALA AtoN portal was proposed as the core of the construction of the AtoN big data. The process was divided into three stages. IALA AtoN portal is developed by IALA with the goal to provide various meaningful statistical analysis results based on AtoN data while managing AtoN information around the world based on S-201. If an AtoN portal capable of constructing S-201-based big data is developed, then a data collection and storage system that can gather basic S-201 AtoN data from the IALA and global AtoN management agencies could be achieved. Furthermore, insightful statistical analysis of AtoN status worldwide and changes in manufacturing technology will be possible.

Future of Ubiquitous Structural Health Monitoring for Infrastructure Management (유비쿼터스 사회기반구축 및 관리를 위한 건설계측기술의 미래)

  • Rhim Hong-Chul
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.63-68
    • /
    • 2006
  • As a part of efforts to enhance construction technology, it is essential to obtain competitive technology which is future-oriented. In this paper, the current status of structural health monitoring techniques is reviewed. Also, ubiquitous system is expected in its use for further development and applications in construction.

  • PDF

Comparative Analysis of Forecasted and Measured Traffic Demand for Gyung-bu High Speed Railway (경부고속철도 수송수요의 예측치와 실측치의 비교분석)

  • Oh In-Tack
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.889-896
    • /
    • 2005
  • While a year and a half has been passed since the launch of KTX service, traffic volume of Gyung-bu High Speed Railway is still much lower than the forecasted value. This situation has been badly affecting not only Korail's financial status but also KRNA's general railway construction projects as general public responds negatively to such projects as New Ho-nam Line Construction. This paper outlines traffic volume forecasting methodologies applied to construction of Gyung-bu High Speed Railway, identifies major causes of forecasting deviations. and finally extracts problems through comparison between the forecasted results and actual traffic volume.

  • PDF

Analysis of Dynamic Relationship between Changes in Domestic and Overseas Orders and Insolvency of Construction Companies (국내외 수주동향과 건설업체 부실화 간의 동태성 분석)

  • Jang, Sewoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.87-94
    • /
    • 2014
  • This study aims to analyze the relationship. The study applies EDF (Expected Default Frequency) as a variable that indicates management status of a construction company. To analyze changes in business structure of construction companies, the study refers to the amounts of domestic and overseas project orders as variables. The data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Korea and International Contractors Association of Korea. The analysis period is between first quarter of 2001 and fourth quarter of 2010. The analysis results showed that as more domestic and overseas orders rolled in for domestic companies, their business conditions improved as the hypothesis suggested. However, the level of improvement varied. Further, when construction companies' business slowed down, the proportion of overseas projects tended to rise, while the ratio of domestic business decreased.

Current Status and Appropriate Check Method of Construction Quality Control for Rebar Coupler Splice (철근 커플러이음의 시공품질 확인 현황 및 적정 시공품질 확인 방안)

  • Kim, Ju-Yong;Kim, Jin-Dong;Lee, Young-Do;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.531-542
    • /
    • 2022
  • As buildings become taller, the strength of structural materials must increase and the amount of rebar reinforcement also increases while the application of an appropriate rebar splice method in the construction process become one of the essential factors. In this research, the current status of quality check for rebar coupler is identified by an expert questionnaire and an appropriate quality check method is proposed through a quality test on specimens similar to actual on-site construction. In the test results, it was revealed that, among the quality check methods for rebar coupler joints, the coupler tightening method and face to face degree of between upper and lower rebar did not affect the strength the specimen. Therefore, it is considered to be an appropriate way to check the coupler quality check to check whether the threads are completely assembled during on-site construction through manufacture the number of threads of rebar and coupler with a margin beyond the calculated thread number.

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

Gap Analysis between Required Technology in the Global Market and Supply of Construction Re-education (글로벌 건설시장에서의 요구기술과 건설재교육 공급현황 간 차이분석을 통한 개선방안 도출)

  • Lee, Seul-Ki;Shin, Seoung-Woo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.9
    • /
    • pp.77-86
    • /
    • 2018
  • Demand for construction technology is expected to change due to changes in domestic and foreign construction markets and the fourth industrial revolution. In particular, demand for project management strategy and project management capability is even more increasing rather than existing production technology capability. However, the current re-education program for engineers and technicians in construction industry is not matching the need of improving capacity required to reflect the demand of construction technology from construction industry. Therefore, in this study, as a part of efforts in innovating the current global construction talent re-education system to cope with the change in the construction industry, we analyzed the difference between the demand of construction technology and the present condition of construction re-education program. In order to investigate the current status of re-education of construction, questionnaires were prepared to gather opinions from construction engineers who attended construction re-education program and also from industrial partners that are jointly doing business. This study can be an example to improve the construction re-education program as a system for substantially reinforcing the competence of engineers rather than those programs that are merely verifying and/or extending engineers' certification.

ESTABLISHMENT OF SAFETY GUIDELINES FOR ELDERLY CONSTRUCTION WORKERS

  • Lee, Jeong-Cheol;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1237-1241
    • /
    • 2009
  • With the average life expectancy increasing thanks to better standards of living and medical technology, the number of elderly construction workers in construction sites rises every year to surpass the 450 thousand people in the construction industry (24.7% of all employees in the construction industry). Similarly, the percentage of fatal accidents involving elderly workers has stood at 41~46 percent for the past five years; note that this is significantly higher than the other age groups, making safety measures for dealing with this issue a matter of urgency. This study sought to propose appropriate safety guidelines for elderly construction workers aged 50 years and over by examining the changes in their physical and psychological functions and through the subsequent analysis of the current status and causes of fatal accidents involving them. The guidelines targeted ferroconcrete construction where accidents occur quite often; construction was classified into mold construction, reinforcing rod construction, and concrete construction. Mold construction was further classified into preparation, carry-in, processing, assembly, and disassembly, and reinforcing rod construction, into preparation/transport and processing/assembly. Safety guidelines for each process were presented by dividing them into three aspects considering the changes in the physical and psychological functions according to their ages and type of accident causes: work environment improvement, machinery and equipment improvement, and work method improvement.

  • PDF

A Study on Counter Strategy of GHG·Energy Target Management System for Construction Firm (건설회사의 온실가스·에너지 목표관리제 대응전략 분석에 관한 연구)

  • Roh, Seung-Jun;Tae, Sung-Ho;Kim, Tae-Hyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.135-136
    • /
    • 2012
  • The purpose of this study is to analysis of counter strategy of greenhouse gas·energy target management system for the construction firm. For this purpose, the greenhouse gas·energy target management system of other industries was investigated. The selection possibility that is construction firm to be managed company was analyzed. In addition, status of counter strategy on the greenhouse gas·energy target management system were investigated and analyzed about 5 domestic major construction firm via questionnaire and interview. As a result, the counter strategy by organization and annual for the greenhouse gas·energy target management system was drawn.

  • PDF

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF