• Title/Summary/Keyword: Construction Standard Production Unit (CSPU)

Search Result 3, Processing Time 0.022 seconds

An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit (표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석)

  • Shin, Won-Sang;Kim, Yong-Woo;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF

Information Constitution of Daily Job-Site Report for Specialty Contractors (전문건설업체 작업일보의 정보구성에 관한 연구)

  • Lee, Kang-Min;Shin, Won-Sang;Lee, Dong-Eun;Kim, Dae-Young;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.279-280
    • /
    • 2012
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is questionable if the reliability and/or authenticity of the system is acceptable due to the lack of consistent enactment and/or revision procedures. This study identifies informational conditions and issues relative to using daily work report as a data collection method for enacting and/or revising CSPU system, and establishes the measures for improving the daily work report. This study aims on the information constitution of daily job-site report, daily manpower report, wages register for specialty contractors. According to the research results, most of necessary data were included in a daily job-site report. In conclusion, it is investigated that data of daily manpower report and wage register need to be included in a daily job-site report for understanding the current state of worker in the future.

  • PDF

A STUDY ON CYCLONE SYSTEM ASSISTING FOR THE REVISION OF CONSTRUCTION STANDARD PRODUCTION UNIT SYSTEM

  • Tae-Kyung Lim;Han-Seong Gwak;Won-Sang Shin;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.583-586
    • /
    • 2013
  • Construction processes are highly repetitive. A resource entity continuously cycles through work tasks that processes or uses resources. Web-CYCLONE (Halpin 1992) has been accepted as a useful tool for modeling and analyzing a specific operation. However the system has a lack of practicality as follows: (1) it does not efficiently record and keep track of operation models in a database; (2) it does not provide the functions which facilitate to retrieve corresponding model and to update local variables of the model using observed data; (3) it does not automate the complex process that executes simulation experiment, analyzes simulation outputs and generates a report on behalf of the practitioners. Therefore, practitioners have a difficulty in reusing, modifying and analyzing the existing operation models. This study introduces a Client/Server based CYCLONE that improves above-mentioned limitations in the existing Web-CYCLONE. The system was illustrated by revising CSPU in practice.

  • PDF